California / Santa Clara County

Shed Permit in Santa Clara County, California

It depends

Sometimes, depending on the project

Before building a detached storage shed, playhouse or similar one-story accessory structure larger than 120 square feet of floor area, or larger than 144 square feet if it shelters livestock. Any shed with electrical, plumbing or mechanical work in it still needs the matching trade permit.

Quick answer

The county's adopted version of California Residential Code Section R105.2 exempts a one-story detached accessory structure used as a tool and storage shed, playhouse or similar use when the floor area does not exceed 120 square feet, and the county added an exception raising the limit to 144 square feet for structures used to shelter livestock. The same county amendment warns that an exempt shed may still be regulated by Part 7, the California Wildland-Urban Interface Code, which matters across the large fire hazard severity zone areas of the unincorporated county. A shed that is exempt from a building permit is not exempt from zoning: Zoning Ordinance Section 4.20.020 limits detached accessory buildings in urban residential districts to 12 feet in height and one story, requires them in the rear half of the lot, and requires at least 6 feet of separation from any dwelling.

Diagram of the 120 sq ft footprint area threshold for a shed permit in Santa Clara County, California
Threshold illustrated: 120 sq ft. Whether Santa Clara County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-15.
Typical threshold
floor area of a one-story detached tool or storage shed
Issued by
Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a shed permit costs in Santa Clara County

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .

No shed-specific flat fee is published.

A shed that needs a permit is charged off the valuation table of the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026), which starts at $821.89 for a project valuation of $1 - $5,000, plus residential plan check at 70% of the building permit fee and an Information Technology fee of 3%.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Santa Clara County compares in California

JurisdictionPermit needed?Threshold
Alameda CountyIt dependsFloor area of a one-story detached tool or storage shed accessory to a house, at which the building permit exemption stops
Contra Costa CountyIt dependsfloor area of a one-story detached accessory structure
Fresno CountyIt dependsOne-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 120 square feet
Los AngelesIt dependsone-story detached tool or storage shed with floor area not greater than 120 square feet, not located in Fire District No. 1, with no heating, plumbing or electrical installation, and located where the zoning code allows, is outside the building code and needs no building permit
Los Angeles CountyIt dependsgross floor area of a one-story detached accessory building; the exemption also requires the height not to exceed 12 feet and the maximum roof projection not to exceed 24 inches
Orange CountyIt dependsOne-story detached accessory buildings used as tool and storage sheds, play houses and similar uses are exempt from a building permit only when the floor area does not exceed 120 square feet and the structure sits at least 3 feet from the property line and 6 feet from other buildings on the same property
Santa Clara Countythis pageIt dependsfloor area of a one-story detached tool or storage shed

How to apply in Santa Clara County

General guide, not specific to this office

What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)

  • County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110
  • Phone: 408-299-5700

Permitting activity in Santa Clara County

In 2025, Santa Clara County authorized permits for 5,323 new residential housing units (1,795 single-family, 3,528 in multi-family buildings), valued at $1.3B, up from 3,834 the year before. That works out to about 2.8 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,914,391.

What else needs a permit in Santa Clara County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area, paired with a 30-inch height limit, no attachment to the dwelling, and no required exit door servedNo deck-specific flat fee is published
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsfence height at which the County Residential Code permit exemption stops applyingSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsBefore building a patio cover, trellis, carport or similar roofed structure over a patioNo patio cover-specific flat fee is published
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsdepth of a prefabricated swimming poolSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeResidential solar under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026): Photovoltaic Roof Mount $950.00

Frequently asked questions

Do you need a shed permit in Santa Clara County?
It depends on the project. Floor area of a one-story detached tool or storage shed. If you are unsure how that applies to your project, call the permit office at 408-299-5700 before you start.
How much does a shed permit cost in Santa Clara County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 408-299-5700.
Where do you apply for a shed permit in Santa Clara County?
You can apply through the Santa Clara County permit portal or contact the Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office) directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Santa Clara County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Santa Clara County applies this before you apply.

From the Library

Shed Permit in other California localities

Everything above, sourced

How this shed permit page for Santa Clara County was verified. 2 official sources: plandev.santaclaracounty.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project