California / Santa Clara County

Solar Permit in Santa Clara County, California

Permit required

Yes, a permit is required

Before installing a rooftop solar energy system on a home in the unincorporated county, at any system size. A system of 10 kW AC or less on a one- or two-family dwelling that meets the county's eligibility checklist is routed through expedited, nondiscretionary review rather than standard plan check.

Quick answer

A permit is required for every residential rooftop solar installation in unincorporated Santa Clara County; system size only decides which review path the application takes. Division C3, Chapter IV of the County Ordinance Code sets up an expedited, streamlined permitting process for small residential rooftop solar energy systems under Government Code Section 65850.5 and the Solar Rights Act as amended by AB 2188, and it applies to the permitting of all such systems in the unincorporated area of the county. A system qualifies for that faster path when it is no larger than 10 kilowatts AC (or 30 kilowatts thermal), sits on a legally established single-family or duplex dwelling, and stays within the maximum building height allowed by the Zoning Ordinance; a system above those limits is still permitted, just through ordinary plan check. Complete applications meeting the county's published checklists and standard plans are approved administratively as nondiscretionary permits, Section C3-48 limits the county to a single inspection that may be consolidated between the Building Office and the Fire Marshal, and county approval does not authorize grid interconnection, which must be obtained separately from the local utility provider.

Issued by
Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your California Contractors State License Board (CSLB) license active, and under which business name? Verify it on www.cslb.ca.gov.

California's owner-builder rule (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Santa Clara County

Fee schedule in force
Official scheduleRead .
Published in
Residential solar under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026):
  • Photovoltaic Roof Mount $950.00;
  • Photovoltaic Ground Mount $3,550.00 in total;
  • Thermal $950.00.
  • Energy Storage Systems are $1,036.00 for up to 4 batteries plus $172.00 for each additional battery, and a Solar App+ (3rd party) submittal is $530.00.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Santa Clara County compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda CountyPermit requiredSee schedule
Contra Costa CountyPermit requiredSee schedule
Fresno CountyPermit requiredSee schedule
Los AngelesPermit requiredSee schedule
Los Angeles CountyPermit requiredSee schedule
Orange CountyPermit requiredSolar Permits, Roof-Mounted (includes County Standard Plan): $428 for FY 2024-25, $448 for FY 2025-26, $455 for FY 2026-27
Santa Clara Countythis pagePermit requiredResidential solar under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026): Photovoltaic Roof Mount $950.00

How to apply in Santa Clara County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)

  • County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110
  • Phone: 408-299-5700

Permitting activity in Santa Clara County

In 2025, Santa Clara County authorized permits for 5,323 new residential housing units (1,795 single-family, 3,528 in multi-family buildings), valued at $1.3B, up from 3,834 the year before. That works out to about 2.8 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,914,391.

What else needs a permit in Santa Clara County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area, paired with a 30-inch height limit, no attachment to the dwelling, and no required exit door servedNo deck-specific flat fee is published
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsfence height at which the County Residential Code permit exemption stops applyingSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsBefore building a patio cover, trellis, carport or similar roofed structure over a patioNo patio cover-specific flat fee is published
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsdepth of a prefabricated swimming poolSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsfloor area of a one-story detached tool or storage shedNo shed-specific flat fee is published

Frequently asked questions

Do you need a solar permit in Santa Clara County?
Yes, before installing a rooftop solar energy system on a home in the unincorporated county, at any system size. A system of 10 kW AC or less on a one- or two-family dwelling that meets the county's eligibility checklist is routed through expedited, nondiscretionary review rather than standard plan check. If you are unsure how that applies to your project, call the permit office at 408-299-5700 before you start.
How much does a solar permit cost in Santa Clara County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 408-299-5700.
Where do you apply for a solar permit in Santa Clara County?
You can apply through the Santa Clara County permit portal or contact the Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office) directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Santa Clara County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Santa Clara County applies this before you apply.

From the Library

Solar Permit in other California localities

Everything above, sourced

How this solar permit page for Santa Clara County was verified. 2 official sources: plandev.santaclaracounty.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page