California / Santa Clara County
Electrical Permit in Santa Clara County, California
Permit required
Yes, a permit is required
Before doing electrical work such as a panel upgrade, new circuits or rewiring on a property in the unincorporated county.
Quick answer
The Electrical Code of Santa Clara County is the 2025 California Electrical Code together with the 2006 ICC Electrical Code Administrative Provisions, as amended by Division C4 of the Ordinance Code and readopted by Ordinance No. NS-1100.138 on December 9, 2025. The county replaced the ICC schedule of permit fees with its own Section 404.2, which provides for a plan review fee before an electrical permit is issued and an electrical permit fee once plans are approved, both set by resolution of the Board of Supervisors. Combined with Ordinance Code Section C1-67, which bars performing work that requires a permit without first obtaining one, electrical work in the unincorporated county needs a permit from the Department of Planning and Development. The former standalone electrical permit ordinance, Section C1-68, was repealed in 1987 and the requirement now lives in the adopted electrical code.
- Issued by
- Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
- Phone
- 408-299-5700
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Santa Clara County
- Fee schedule in force
- Official scheduleRead .
- Single-family electrical work is a minor permit under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026): Electrical Service Change or Subpanel $308.00;
- Electric Vehicle Charger (less than 60 amps, non-bidirectional) $349.00;
- Re-Wire $719.00, or $801.00 with gyp or gyp and shear repair.
- Electrical permits that are part of a building permit are 11% of the building permit fee for single and two-family homes, with a $410.00 minimum permit fee.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Santa Clara County compares in California
No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alameda County | Permit required | See schedule |
| Contra Costa County | Permit required | See schedule |
| Fresno County | Permit required | See schedule |
| Los Angeles | Permit required | See schedule |
| Los Angeles County | Permit required | See schedule |
| Orange County | Permit required | Electrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25, $356 for FY 2025-26, $362 for FY 2026-27 |
| Santa Clara Countythis page | Permit required | See schedule |
How to apply in Santa Clara County
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
- County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110
- Phone: 408-299-5700
Your Electrical Permit checklist for Santa Clara County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: plandev.santaclaracounty.gov: apply building permit.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Santa Clara County permit portal.
- Keep the office details handy. Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Phone: 408-299-5700. Address: County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110.
Compiled from the official sources on this page. Last checked .
Permitting activity in Santa Clara County
In 2025, Santa Clara County authorized permits for 5,323 new residential housing units (1,795 single-family, 3,528 in multi-family buildings), valued at $1.3B, up from 3,834 the year before. That works out to about 2.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,914,391.
What else needs a permit in Santa Clara County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck area, paired with a 30-inch height limit, no attachment to the dwelling, and no required exit door served | No deck-specific flat fee is published |
| Fence Permit | It depends | fence height at which the County Residential Code permit exemption stops applying | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | Before building a patio cover, trellis, carport or similar roofed structure over a patio | No patio cover-specific flat fee is published |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | depth of a prefabricated swimming pool | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | It depends | floor area of a one-story detached tool or storage shed | No shed-specific flat fee is published |
| Solar Permit | Permit required | Any size | Residential solar under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026): Photovoltaic Roof Mount $950.00 |
Frequently asked questions
- Do you need an electrical permit in Santa Clara County?
- Yes, before doing electrical work such as a panel upgrade, new circuits or rewiring on a property in the unincorporated county. If you are unsure how that applies to your project, call the permit office at 408-299-5700 before you start.
- How much does an electrical permit cost in Santa Clara County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 408-299-5700.
- Where do you apply for an electrical permit in Santa Clara County?
- You can apply through the Santa Clara County permit portal or contact the Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office) directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Santa Clara County?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Santa Clara County applies this before you apply.
From the Library
Electrical Permit in other California localities
Everything above, sourced
How this electrical permit page for Santa Clara County was verified. 2 official sources: plandev.santaclaracounty.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page