California / Fresno County

Solar Permit in Fresno County, California

Permit required

Yes, a permit is required

Before installing a residential rooftop or ground-mounted solar energy system in unincorporated Fresno County

Quick answer

Fresno County states outright in Title 15 that a building permit is required to install a solar energy system, and its SolarAPP+ page warns that 'County of Fresno provides the building permit. SolarAPP+ confirmation information is not considered a building permit.' Section 15.18.030 establishes the expedited, streamlined permitting process for small residential rooftop systems required by Government Code Section 65850.5, defined as up to 10 kW AC or 30 kW thermal on a single or duplex family dwelling, and limits those projects to a single inspection unless the installation is out of compliance or a separate fire safety inspection is required. Licensed contractors can run the design through SolarAPP+ for automated review and then apply on the Citizens Portal; everything else goes through the 'Solar Installation without SolarAPP+' sub type. This applies to unincorporated Fresno County only, not to the City of Fresno, the City of Clovis or the county's other incorporated cities.

Issued by
Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your California Contractors State License Board (CSLB) license active, and under which business name? Verify it on www.cslb.ca.gov.

California's owner-builder rule (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Fresno County

Fee schedule in force
Official scheduleRead .

Fresno County's Master Schedule of Fees, which the Building and Safety page links as the most recent Master Schedule of Fees (FY 26-27), has no solar or photovoltaic line item.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Fresno County compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda CountyPermit requiredSee schedule
Contra Costa CountyPermit requiredSee schedule
Fresno Countythis pagePermit requiredSee schedule
Los AngelesPermit requiredSee schedule
Los Angeles CountyPermit requiredSee schedule
Orange CountyPermit requiredSolar Permits, Roof-Mounted (includes County Standard Plan): $428 for FY 2024-25, $448 for FY 2025-26, $455 for FY 2026-27
Riverside CountyPermit requiredSee schedule

How to apply in Fresno County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety

  • 2220 Tulare Street, Suite A, Fresno, CA 93721 (Development Services and Capital Projects Division; the offices are in Annex A and Annex B of the Fresno County Plaza at Tulare and M streets)
  • Phone: 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line)
  • Email: PlanCheckBuildingCode2@fresnocountyca.gov

Permitting activity in Fresno County

In 2025, Fresno County authorized permits for 2,271 new residential housing units (2,002 single-family, 269 in multi-family buildings), valued at $734M, down from 2,439 the year before. That works out to about 2.2 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,035,456.

What else needs a permit in Fresno County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeNo flat deck permit fee is published
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsFences not over 7 feet high are on the county's published list of work exempt from a building permitThe Master Schedule of Fees publishes no flat fence permit fee
HVAC PermitPermit requiredAny sizeSection 2510 Mechanical Code Fees, FY 2026-27: Issuing each permit $42.77
Patio PermitPermit requiredAny sizeNo flat patio permit fee is published
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsPrefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above groundSee schedule
Roof Replacement PermitPermit requiredAny sizeSingle family residential: $201.47 per structure for FY 2026-27
Shed PermitIt dependsOne-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 120 square feetIts Building and Safety FAQ says 'The cost for the permit will be $153.44'; the schedule has the rest

Frequently asked questions

Do you need a solar permit in Fresno County?
Yes, before installing a residential rooftop or ground-mounted solar energy system in unincorporated Fresno County. If you are unsure how that applies to your project, call the permit office at 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line) before you start.
How much does a solar permit cost in Fresno County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line).
Where do you apply for a solar permit in Fresno County?
You can apply through the Fresno County permit portal or contact the Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Fresno County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Fresno County applies this before you apply.

From the Library

Solar Permit in other California localities

Everything above, sourced

How this solar permit page for Fresno County was verified. 2 official sources: fresnocountyca.gov, fresnocountyca.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project