Deck Permit in Fresno County, California
Permit required
Yes, a permit is required
Before building a residential deck in unincorporated Fresno County
Quick answer
Fresno County's published answer to 'When is a building permit required?' states the general rule that permits are required for construction of any building or structure and then lists the exemptions, and no deck exemption appears anywhere on that list or in the county's own Title 15 additions to it. The Master Schedule of Fees carries a Wood Decks construction valuation line, which is how the county prices a deck permit. This applies to unincorporated Fresno County only, not to the City of Fresno, the City of Clovis or the county's other incorporated cities.
- Issued by
- Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.
Compare deck contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a deck permit costs in Fresno County
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
- No flat deck permit fee is published.
- The Table of Construction Valuation (Section 2500, Miscellaneous) lists 'Wood Decks $12.00' as a construction valuation rate per square foot, which is run through Section 2501 Building Construction Permits: for FY 2026-27 a $166.28 minimum charge, then $166.28 for the first $4,000.00 plus $18.85 for each additional $1,000.00 of valuation or fraction thereof to and including $25,000.00.
- Plan review for single family and duplex dwellings is 65 percent of the building permit fee.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Fresno County compares in California
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alameda County | It depends | Height of a raised deck above adjacent grade at which the building permit exemption stops, and only where the deck is not over a basement or story below and is not part of an accessible route |
| Contra Costa County | It depends | area of a deck that is also no more than 30 inches above grade at any point, is not attached to a dwelling, and does not serve a code-required exit door |
| Fresno Countythis page | Permit required | Any size |
| Los Angeles | Permit required | the code exempts platforms not more than 30 inches above grade and not over any basement or story below; confirm with LADBS whether a low deck qualifies |
| Los Angeles County | It depends | height of the deck surface above grade; the exemption also requires the deck not to be over any basement or story below and not to be part of an accessible route |
| Orange County | Permit required | Any size |
| Riverside County | It depends | A deck is exempt only if it is 200 square feet or less in area, no more than 30 inches above grade at any point, not attached to a dwelling or townhouse, and does not serve the required exit door |
How to apply in Fresno County
General guide, not specific to this office
What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety
- 2220 Tulare Street, Suite A, Fresno, CA 93721 (Development Services and Capital Projects Division; the offices are in Annex A and Annex B of the Fresno County Plaza at Tulare and M streets)
- Phone: 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line)
- Email: PlanCheckBuildingCode2@fresnocountyca.gov
Your Deck Permit checklist for Fresno County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: fresnocountyca.gov: building safety.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Fresno County permit portal.
- Keep the office details handy. Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety. Phone: 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line). Email: PlanCheckBuildingCode2@fresnocountyca.gov. Address: 2220 Tulare Street, Suite A, Fresno, CA 93721 (Development Services and Capital Projects Division; the offices are in Annex A and Annex B of the Fresno County Plaza at Tulare and M streets).
Compiled from the official sources on this page. Last checked .
Permitting activity in Fresno County
In 2025, Fresno County authorized permits for 2,271 new residential housing units (2,002 single-family, 269 in multi-family buildings), valued at $734M, down from 2,439 the year before. That works out to about 2.2 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,035,456.
What else needs a permit in Fresno County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Electrical Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | Fences not over 7 feet high are on the county's published list of work exempt from a building permit | The Master Schedule of Fees publishes no flat fence permit fee |
| HVAC Permit | Permit required | Any size | Section 2510 Mechanical Code Fees, FY 2026-27: Issuing each permit $42.77 |
| Patio Permit | Permit required | Any size | No flat patio permit fee is published |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | Prefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above ground | See schedule |
| Roof Replacement Permit | Permit required | Any size | Single family residential: $201.47 per structure for FY 2026-27 |
| Shed Permit | It depends | One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 120 square feet | Its Building and Safety FAQ says 'The cost for the permit will be $153.44'; the schedule has the rest |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a deck permit in Fresno County?
- Yes, before building a residential deck in unincorporated Fresno County. If you are unsure how that applies to your project, call the permit office at 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line) before you start.
- How much does a deck permit cost in Fresno County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line).
- Where do you apply for a deck permit in Fresno County?
- You can apply through the Fresno County permit portal or contact the Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety directly. The links are listed on this page.
- Can a homeowner pull a deck permit themselves in Fresno County?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Fresno County applies this before you apply.
From the Library
Deck Permit in other California localities
Everything above, sourced
How this deck permit page for Fresno County was verified. 2 official sources: fresnocountyca.gov, fresnocountyca.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page