California / Fresno County

Roof Replacement Permit in Fresno County, California

Permit required

Yes, a permit is required

Before re-roofing an existing home in unincorporated Fresno County

Confirmed on official page Verified

Issued byDepartment of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety

By Mario Bailey, verified against official sources

Quick answer

A re-roof is a permitted alteration in unincorporated Fresno County and the fee schedule prices it as a flat per-structure Special Services fee that includes the pre-roof inspection. The county requires the F336 Re-Roof Certification form, which records the roof classification, slope and covering materials, together with the CF1R energy compliance form or a Certificate of Compliance, before the permit is issued. Class A roof covering is the minimum in California Department of Forestry State Responsibility Areas under Title 15 Section 15.08.020.M. This applies to unincorporated Fresno County only, not to the City of Fresno, the City of Clovis or the county's other incorporated cities.

Who is pulling this permit?

Hire it out

Sponsored

Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.

Compare roofing quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before re-roofing an existing home in unincorporated Fresno County

What a roof replacement permit costs in Fresno County

Line item
roof replacement permitBy formulaSpecial Services Fees item 16, 'Re-roofing of existing buildings including pre-roof inspection', a. Single family residential: $201.47 per structure for FY 2026-27. FY 2026-27 amounts include the 3 percent increase effective 07/01/2026 under Ordinance 24-005.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Fresno County compares in California

JurisdictionPermit needed?Threshold
Alameda CountyIt dependsAggregate roof area repaired on a previously permitted roof, at which the building permit exemption stops
Contra Costa CountyPermit requiredAny size
Fresno Countythis pagePermit requiredAny size
Los AngelesPermit requiredAny size
Los Angeles CountyPermit requiredAny size
Orange CountyPermit requiredAny size
Riverside CountyIt dependsRoof repairs or replacements covering less than 25 percent of the legally existing roof area are exempt, provided the work does not involve the underlying framing and does not occur more than once in a 12-month period

How to apply in Fresno County

In Fresno County, a residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies.

What most roof replacement permit applications include:

  • State on the application whether the job is a roof replacement, which strips all existing layers down to the bare deck, or a roof recover, which leaves the old covering in place under specific conditions, since the two scopes are governed differently (IRC R908.3).
  • For Fresno County, a recover is only an option where the new covering follows the roof covering manufacturer's approved instructions or is a self-supporting system, such as standing-seam metal, that does not rely on the existing roof for support (IRC R908.3.1).
  • Full tear-off must be scoped on the application instead of a recover when the existing roof is water soaked or deteriorated, is slate, clay, cement, or asbestos-cement tile, or already carries two or more layers of roof covering (IRC R908.3.1.1).
  • For Fresno County, the materials and installation methods described on the application must comply with the reroofing requirements of the roof-assemblies chapter (IRC R908.1).
  • If the scope reuses existing slate, clay, or cement tile, damaged or broken pieces cannot be listed for reinstallation, and any rusted or deteriorated flashings, edgings, outlets, or vents uncovered during tear-off must be scoped for replacement (IRC R908.5).

General submittal guidance from IRC Section R908 Reroofing (text as adopted in the 2020 Residential Code of New York State, based on the 2018 IRC). Source. Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety sets the exact checklist for Fresno County.

Where to apply in Fresno County:

Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety

  • 2220 Tulare Street, Suite A, Fresno, CA 93721 (Development Services and Capital Projects Division; the offices are in Annex A and Annex B of the Fresno County Plaza at Tulare and M streets)
  • Phone: 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line)
  • Email: PlanCheckBuildingCode2@fresnocountyca.gov

Roof Replacement Permit in Fresno County compared with nearby California localities

LocalityPermit needed?ThresholdWhat each California schedule saysVerified
Fresno CountyPermit requiredAny sizeSingle family residential: $201.47 per structure for FY 2026-27
Alameda CountyIt dependsAggregate roof area repaired on a previously permitted roof, at which the building permit exemption stops...valuation on the Schedule A building permit fee table, which begins '$140.00...
Contra Costa CountyPermit requiredAny size...Schedule item 14, "Re-Roofs - Residential": Building Permit / Inspection $150.00...
Los AngelesPermit requiredAny sizeValuation-based building permit per LAMC 91.113 Table 1-A
Los Angeles CountyPermit requiredAny sizeA reroof is priced from the valuation-based Table 1-A Building Permit Fees ($65.36 for a...

Inspections and closing out your permit

In Fresno County, most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.

  1. In Fresno County: where the covering is fully removed and the sheathing is exposed, replaced, or added, inspectors check the deck and its nailing before any new roofing goes down, since the structural framework must be able to carry the new covering's loads (IRC R908.2).
  2. In Fresno County: an overlay is only approved where it meets one of the code's listed recover conditions, such as installation in accordance with the covering manufacturer's approved instructions (IRC R908.3.1).
  3. In Fresno County: flashings disturbed or replaced during the job are checked against the approved manufacturer's installation instructions, and metal flashing that will receive bituminous material must be primed before installation (IRC R908.6).
  4. In Fresno County: a final inspection confirms the completed roof covering and its fasteners were installed as required for that material and per manufacturer instructions before the permit is closed (IRC R905).
  5. In Fresno County: in some regions with strengthened wind provisions, reroofing an older single-family home also triggers inspection of supplemental deck-nailing and a secondary water barrier added during tear-off, on top of the base reroofing requirements (Florida Building Code, Residential R908.7 Mitigation).
  6. In Fresno County: reinstalled existing slate, clay, or cement tile is checked against reuse limits at inspection, and any rusted, damaged, or deteriorated flashings, edgings, outlets, or vents found during tear-off must be replaced rather than reinstalled (IRC R908.5).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Fresno County permit portal or by phone at 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line).

Inspection sequence from IRC Section R908 Reroofing and Section R905 Roof Coverings (2021 International Residential Code). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a roof replacement permit in Fresno County?
A re-roof is a permitted alteration in unincorporated Fresno County and the fee schedule prices it as a flat per-structure Special Services fee that includes the pre-roof inspection. The county requires the F336 Re-Roof Certification form, which records the roof classification, slope and covering materials, together with the CF1R energy compliance form or a Certificate of Compliance, before the permit is issued. Class A roof covering is the minimum in California Department of Forestry State Responsibility Areas under Title 15 Section 15.08.020.M. This applies to unincorporated Fresno County only, not to the City of Fresno, the City of Clovis or the county's other incorporated cities. Always confirm with the Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety before starting.
How much does a roof replacement permit cost in Fresno County?
Special Services Fees item 16, 'Re-roofing of existing buildings including pre-roof inspection', a. Single family residential: $201.47 per structure for FY 2026-27. FY 2026-27 amounts include the 3 percent increase effective 07/01/2026 under Ordinance 24-005. See the official fee schedule for current amounts.
Where do you apply for a roof replacement permit in Fresno County?
You can apply through the Fresno County permit portal or contact the Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety directly. The links are listed on this page.
Can a homeowner pull a roof replacement permit themselves in Fresno County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Fresno County applies this before you apply.

From the Library

What else needs a permit in Fresno County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeNo flat deck permit fee is published
Electrical PermitPermit requiredAny sizeSection 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each
Fence PermitIt dependsFences not over 7 feet high are on the county's published list of work exempt from a building permitThe Master Schedule of Fees publishes no flat fence permit fee
HVAC PermitPermit requiredAny sizeSection 2510 Mechanical Code Fees, FY 2026-27: Issuing each permit $42.77
Patio PermitPermit requiredAny sizeNo flat patio permit fee is published
Plumbing PermitPermit requiredAny size...Fees, FY 2026-27: Alteration, repair or addition of a drain or waste line $80.47...
Pool PermitIt dependsPrefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above ground...structural, plumbing and electrical', FY 2026-27: In ground Pool or Spa...
Shed PermitIt dependsOne-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 120 square feet...application, not a building permit: 'The cost for the permit will be $153.44 (a...
Solar PermitPermit requiredAny sizeSee schedule

Roof Replacement Permit in other California localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Fresno County documents; the office above sets the local rules.

How this roof replacement permit page for Fresno County was verified. 1 official source: fresnocountyca.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Roof Replacement Permit requirements across California localities

Roof replacement permit rules nationwide

Permit required
Get quotes