Solar Permit in Riverside County, California
Permit required
Yes, a permit is required
Before installing any residential rooftop or ground-mounted photovoltaic system, with or without battery storage, in unincorporated Riverside County
Quick answer
Riverside County requires a permit for residential solar and runs two tracks. Code-compliant roof-mounted systems up to 15 kW, with or without an energy storage system and optionally including a main service upgrade, can be reviewed automatically through SolarAPP+ at solarapp.nrel.gov and then filed as an Express Residential Solar permit at rivcoplus.org for instant issuance. Everything else, including all ground-mounted systems and anything mounted on a patio cover, goes through the county's standard plan review. This applies to unincorporated Riverside County; the county's incorporated cities run their own building departments.
- Issued by
- Riverside County Building and Safety Department (Transportation and Land Management Agency)
- Phone
- 951-955-1800
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your California Contractors State License Board (CSLB) license active, and under which business name? Verify it on www.cslb.ca.gov.
California's owner-builder rule (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Riverside County
- Fee schedule in force
- Official scheduleRead .
- Roof Mount Solar Residential (BEL-RSLRR), described in the schedule as 'Mandated by AB 1132 - $450 UP TO 15 KW $15 per kW for each kW above 15 Kw': $450.00 fixed fee.
- Ground Mount Solar Residential (BEL-GSLRR) and Express Residential Solar App. Only (BEL-ERSO) carry the same $450.00 for up to 15 kW plus $15 per kW above 15 kW, per Appendix A to Ordinance No. 457 as amended by Ordinance No. 457.108 (adopted June 23, 2026).
- The ordinance moved the roof-mount fee up from $441.05 and the ground-mount fee down from $574.06.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Riverside County compares in California
No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alameda County | Permit required | See schedule |
| Contra Costa County | Permit required | See schedule |
| Fresno County | Permit required | See schedule |
| Los Angeles | Permit required | See schedule |
| Los Angeles County | Permit required | See schedule |
| Orange County | Permit required | Solar Permits, Roof-Mounted (includes County Standard Plan): $428 for FY 2024-25, $448 for FY 2025-26, $455 for FY 2026-27 |
| Riverside Countythis page | Permit required | See schedule |
How to apply in Riverside County
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Riverside County Building and Safety Department (Transportation and Land Management Agency)
- 4080 Lemon Street, 9th Floor, Riverside, CA 92501 (mailing: P.O. Box 1629, Riverside, CA 92502-1629)
- Phone: 951-955-1800
- Email: records@rivco.org
Your Solar Permit checklist for Riverside County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: building.rctlma.org.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Riverside County permit portal.
- Keep the office details handy. Riverside County Building and Safety Department (Transportation and Land Management Agency). Phone: 951-955-1800. Email: records@rivco.org. Address: 4080 Lemon Street, 9th Floor, Riverside, CA 92501 (mailing: P.O. Box 1629, Riverside, CA 92502-1629).
Compiled from the official sources on this page. Last checked .
Permitting activity in Riverside County
In 2025, Riverside County authorized permits for 9,697 new residential housing units (6,399 single-family, 3,298 in multi-family buildings), valued at $2.7B, up from 9,598 the year before. That works out to about 3.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 2,544,916.
What else needs a permit in Riverside County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | A deck is exempt only if it is 200 square feet or less in area, no more than 30 inches above grade at any point, not attached to a dwelling or townhouse, and does not serve the required exit door | Deck County Standard (BPT-DEKCS): $586.60 fixed fee |
| Electrical Permit | Permit required | Any size | Residential Electrical (BEL-RELE): $448.20 fixed fee |
| Fence Permit | It depends | Fences 7 feet or less in height are exempt from a building permit, except block walls, which are exempt only up to 4 feet in height | See schedule |
| HVAC Permit | Permit required | Any size | Residential Mechanical (BME-RMEC): $274.30 fixed fee; the schedule has the rest |
| Patio Permit | Permit required | Any size | Lattice Patio Cover County Standard (BPT-LPAT): $411.90 fixed fee |
| Plumbing Permit | Permit required | Any size | Residential Plumbing (BPL-RPLU): $274.30 fixed fee; the schedule has the rest |
| Pool Permit | It depends | A prefabricated swimming pool less than 24 inches deep is exempt from a building permit; the department's handout adds that it must be above ground, hold no more than 5,000 gallons, and be at a single-family property | Residential Pool/Spa (BSP-RES): $999.30 fixed fee |
| Roof Replacement Permit | It depends | Roof repairs or replacements covering less than 25 percent of the legally existing roof area are exempt, provided the work does not involve the underlying framing and does not occur more than once in a 12-month period | Roofing and/or Deck Replacement (BRR-RROO): $335.50 fixed fee; the schedule has the rest |
| Shed Permit | It depends | A one-story detached accessory structure with a floor area of 120 square feet or less is exempt from a building permit, other than a storm shelter | Accessory Building 1,000 SQ FT (BAS-ACB1): $1,628.78 deposit |
Frequently asked questions
- Do you need a solar permit in Riverside County?
- Yes, before installing any residential rooftop or ground-mounted photovoltaic system, with or without battery storage, in unincorporated Riverside County. If you are unsure how that applies to your project, call the permit office at 951-955-1800 before you start.
- How much does a solar permit cost in Riverside County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 951-955-1800.
- Where do you apply for a solar permit in Riverside County?
- You can apply through the Riverside County permit portal or contact the Riverside County Building and Safety Department (Transportation and Land Management Agency) directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Riverside County?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Riverside County applies this before you apply.
From the Library
Solar Permit in other California localities
Everything above, sourced
How this solar permit page for Riverside County was verified. 2 official sources: building.rctlma.org, building.rctlma.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Riverside County Building and Safety Department (Transportation and Land Management Agency). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page