California / San Bernardino County

Solar Permit in San Bernardino County, California

Permit required

Yes, a permit is required

Before installing a roof-mount or ground-mount photovoltaic system or a solar water heating system at a home in the unincorporated county.

Confirmed on official page Verified San Bernardino County Land Use Services Department, Building and Safety Division

By Mario Bailey, verified against official sources

Quick answer

A solar permit is required for rooftop or ground-mounted solar in unincorporated San Bernardino County, and "Roof and Ground Mount Solar Installation" is on the county's published list of items requiring a permit. The county offers an expedited path through SolarAPP+, the automated plan review run by NREL: the contractor gets a SolarAPP+ approval, then submits the SolarAPP+ Approval Document and Specification Sheet with an EZOP application. SolarAPP+ is limited to permitted residential structures with no building-integrated photovoltaics and no ballasted systems, and to C-10 and C-46 licensed contractors only. Solar is one of the three work types eligible for the county's photo-based self-inspection program.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before installing a roof-mount or ground-mount photovoltaic system or a solar water heating system at a home in the unincorporated county.

What a solar permit costs in San Bernardino County

Line item
solar permitBy formulaCounty Code 16.0204(j)(1) sets fees effective July 1, 2026 for "15KW or less photovoltaic systems for single family residential - roof mount system": plan review $215.00 plus permit fee $226.00. Ground-mounted single family systems of 15KW or less are $225.00 plan review plus $225.00 permit fee under 16.0204(j)(3); above 15KW the plan review is "$225.00 plus $15.00 per each additional kilowatt above 15KW." Solar water heating systems are $166.00 plan review plus $213.00 permit fee. The ordinance states "the intake processing fee will be waived" for these residential solar sections, so the $57.00 intake fee does not apply.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How San Bernardino County compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda CountyPermit requiredBuilding Inspection Department Service Fee Schedule (Schedule A, effective...
Contra Costa CountyPermit requiredLand Development Fee Schedule item 7, "Residential solar energy systems - roof...
Fresno CountyPermit requiredThe Master Schedule of Fees has no solar or photovoltaic line item anywhere in...
Los AngelesPermit requiredResidential rooftop PV is an electrical permit with itemized per-component...
Los Angeles CountyPermit requiredChapter 68, Section 6805 of the County of Los Angeles Building Code: 'The...
Orange CountyPermit requiredSolar Permits, Roof-Mounted (includes County Standard Plan): $428 for FY...
San Bernardino Countythis pagePermit requiredCounty Code 16.0204(j)(1) sets fees effective July 1, 2026 for "15KW or less...

How to apply in San Bernardino County

A rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit.

What most solar permit applications include:

  • Both a building permit and a separate electrical permit are required, since the array must be designed and installed to the residential code's solar provisions and to the National Electrical Code (IRC R324.3).
  • The plan set identifies listed equipment: PV modules listed to UL 1703 (or both UL 61730-1 and UL 61730-2), and inverters listed to UL 1741, with grid-tied inverters listed for utility interaction (IRC R324.3.1).
  • Structural drawings show that the roof framing is designed to structurally support the array and withstand the gravity loads it adds (IRC R324.4.1).
  • The site plan lays out roof access pathways at least 36 inches wide, plus a ridge setback sized to how much of the roof the array covers, so firefighters retain pathways and ventilation access (IRC R324.6.1, IRC R324.6.2).
  • The one line electrical diagram shows the rapid shutdown method and the location of its single initiation device, since one control point must bring all system conductors down to safe levels (NEC 690.12, NEC 690.56(C)).
  • Interconnecting the array to the utility grid at a defined point of connection is a separate application process from the local building or electrical permit and must be approved before the system can operate (NEC 705.12).
  • Some permitting offices route applications through SolarAPP+, an automated review platform that checks the plan set against code requirements and issues eligible permits instantly (DOE SolarAPP+).

General submittal guidance from IRC 2021 R324 (Solar Energy Systems) and NEC 2020 Article 690 (Solar Photovoltaic Systems) and Article 705 (Interconnected Power Production Sources). Source. San Bernardino County Land Use Services Department, Building and Safety Division sets the exact checklist for San Bernardino County.

Where to apply in San Bernardino County:

San Bernardino County Land Use Services Department, Building and Safety Division

  • County Government Center, 385 N. Arrowhead Ave., First Floor, San Bernardino, CA 92415
  • Phone: 909-387-8311

Inspections and closing out your permit

Inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.

  1. Where an agency runs a rough or pre-inspection, it checks the array's roof penetrations while they are still exposed, confirming they are flashed and sealed (IRC R324.4.3).
  2. The inspector confirms whether rapid shutdown is required, how it is accomplished, and that it is properly identified (NEC 690.12, NEC 690.56(C)).
  3. PV disconnecting means must be permanently marked and installed where they are readily accessible, which the inspector confirms in the field (NEC 690.13).
  4. Bonding and grounding of the array, including every exposed non current carrying metal part and the grounding electrode system, is checked before sign off (NEC 690.43, NEC 690.47).
  5. At the service equipment, the inspector looks for the required rapid shutdown placard, a labeled diagram showing the initiation device's location in the specified colors and letter sizes (NEC 690.56(C)).
  6. Utility interconnection is inspected and approved separately from the local building department's sign off, and the system cannot be energized until both approvals are in hand (NEC 705.12).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the San Bernardino County permit portal or by phone at 909-387-8311.

Inspection sequence from NEC 2020 Article 690 (690.12 rapid shutdown, 690.13 disconnects, 690.43/690.47 grounding, 690.56 labeling) and IRC 2021 R324.4.3 (roof penetrations). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a solar permit in San Bernardino County?
A solar permit is required for rooftop or ground-mounted solar in unincorporated San Bernardino County, and "Roof and Ground Mount Solar Installation" is on the county's published list of items requiring a permit. The county offers an expedited path through SolarAPP+, the automated plan review run by NREL: the contractor gets a SolarAPP+ approval, then submits the SolarAPP+ Approval Document and Specification Sheet with an EZOP application. SolarAPP+ is limited to permitted residential structures with no building-integrated photovoltaics and no ballasted systems, and to C-10 and C-46 licensed contractors only. Solar is one of the three work types eligible for the county's photo-based self-inspection program. Always confirm with the San Bernardino County Land Use Services Department, Building and Safety Division before starting.
How much does a solar permit cost in San Bernardino County?
County Code 16.0204(j)(1) sets fees effective July 1, 2026 for "15KW or less photovoltaic systems for single family residential - roof mount system": plan review $215.00 plus permit fee $226.00. Ground-mounted single family systems of 15KW or less are $225.00 plan review plus $225.00 permit fee under 16.0204(j)(3); above 15KW the plan review is "$225.00 plus $15.00 per each additional kilowatt above 15KW." Solar water heating systems are $166.00 plan review plus $213.00 permit fee. The ordinance states "the intake processing fee will be waived" for these residential solar sections, so the $57.00 intake fee does not apply. See the official fee schedule for current amounts.
Where do you apply for a solar permit in San Bernardino County?
You can apply through the San Bernardino County permit portal or contact the San Bernardino County Land Use Services Department, Building and Safety Division directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in San Bernardino County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner-builder from contractor licensing when the owner personally performs the work, or uses only wage employees, on their own property and does not intend the improvements for sale. A homeowner may also directly hire licensed trade contractors for up to four single-family residences a year, or improve their own principal residence without a general contractor's license, as long as they have actually lived there for the 12 months before the work is finished. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a building permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a $500 civil penalty. Confirm how San Bernardino County applies this before you apply.

From the Library

What else needs a permit in San Bernardino County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsfloor area of a detached residential accessory structureDecks are priced off the FY 2026/27 Construction Fee Schedule adopted under County Code...
Electrical PermitPermit requiredNot specifiedCounty Code 16.0204(b)(1) sets residential electrical fees effective July 1, 2026:...
Fence PermitIt dependsheight of a fence or block wallSan Bernardino County Code section 16.0204(g)(3) prices fencing as a flat fee: "Chain...
HVAC PermitPermit requiredNot specifiedCounty Code 16.0204(d)(1) sets residential mechanical fees effective July 1, 2026: "HVAC...
Patio PermitPermit requiredNot specifiedPatio covers are priced off the FY 2026/27 Construction Fee Schedule adopted under...
Plumbing PermitPermit requiredNot specifiedCounty Code 16.0204(c)(1) sets residential plumbing fees effective July 1, 2026 for...
Pool PermitPermit requiredNot specifiedCounty Code 16.0204(i)(1) sets flat fees effective July 1, 2026 for "Swimming pools...
Roof Replacement PermitPermit requiredNot specifiedCounty Code 16.0204(h)(8) sets a flat re-roof fee effective July 1, 2026: "Re-roofs: A)...
Shed PermitIt dependsfloor area of a detached residential accessory structureSheds are priced off the FY 2026/27 Construction Fee Schedule adopted under County Code...

Solar Permit in other California localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not San Bernardino County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with San Bernardino County Land Use Services Department, Building and Safety Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Solar Permit requirements across California localities

Permit required
Get quotes