California / San Bernardino County
Solar Permit in San Bernardino County, California
Permit required
Yes, a permit is required
Before installing a roof-mount or ground-mount photovoltaic system or a solar water heating system at a home in the unincorporated county.
Quick answer
A solar permit is required for rooftop or ground-mounted solar in unincorporated San Bernardino County, and "Roof and Ground Mount Solar Installation" is on the county's published list of items requiring a permit. The county offers an expedited path through SolarAPP+, the automated plan review run by NREL: the contractor gets a SolarAPP+ approval, then submits the SolarAPP+ Approval Document and Specification Sheet with an EZOP application. SolarAPP+ is limited to permitted residential structures with no building-integrated photovoltaics and no ballasted systems, and to C-10 and C-46 licensed contractors only. Solar is one of the three work types eligible for the county's photo-based self-inspection program.
- Issued by
- San Bernardino County Land Use Services Department, Building and Safety Division
- Phone
- 909-387-8311
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your California Contractors State License Board (CSLB) license active, and under which business name? Verify it on www.cslb.ca.gov.
California's owner-builder rule (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in San Bernardino County
- Fee schedule in force
- Official scheduleRead .
- County Code 16.0204(j)(1) sets fees effective July 1, 2026 for "15KW or less photovoltaic systems for single family residential - roof mount system": plan review $215.00 plus permit fee $226.00.
- Ground-mounted single family systems of 15KW or less are $225.00 plan review plus $225.00 permit fee under 16.0204(j)(3);
- above 15KW the plan review is "$225.00 plus $15.00 per each additional kilowatt above 15KW." Solar water heating systems are $166.00 plan review plus $213.00 permit fee.
- The ordinance states "the intake processing fee will be waived" for these residential solar sections, so the $57.00 intake fee does not apply.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How San Bernardino County compares in California
No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alameda County | Permit required | See schedule |
| Contra Costa County | Permit required | See schedule |
| Fresno County | Permit required | See schedule |
| Los Angeles | Permit required | See schedule |
| Los Angeles County | Permit required | See schedule |
| Orange County | Permit required | Solar Permits, Roof-Mounted (includes County Standard Plan): $428 for FY 2024-25, $448 for FY 2025-26, $455 for FY 2026-27 |
| San Bernardino Countythis page | Permit required | See schedule |
How to apply in San Bernardino County
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
San Bernardino County Land Use Services Department, Building and Safety Division
- County Government Center, 385 N. Arrowhead Ave., First Floor, San Bernardino, CA 92415
- Phone: 909-387-8311
Your Solar Permit checklist for San Bernardino County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: lus.sbcounty.gov: building safety home.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the San Bernardino County permit portal.
- Keep the office details handy. San Bernardino County Land Use Services Department, Building and Safety Division. Phone: 909-387-8311. Address: County Government Center, 385 N. Arrowhead Ave., First Floor, San Bernardino, CA 92415.
Compiled from the official sources on this page. Last checked .
Permitting activity in San Bernardino County
In 2025, San Bernardino County authorized permits for 6,240 new residential housing units (3,578 single-family, 2,662 in multi-family buildings), valued at $1.4B, up from 6,226 the year before. That works out to about 2.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 2,224,091.
What else needs a permit in San Bernardino County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | floor area of a detached residential accessory structure | See schedule |
| Electrical Permit | Permit required | Any size | County Code 16.0204(b)(1) sets residential electrical fees effective July 1, 2026: "Meter change out and upgrades only" $195.00; the schedule has the rest |
| Fence Permit | It depends | height of a fence or block wall | See schedule |
| HVAC Permit | Permit required | Any size | County Code 16.0204(d)(1) sets residential mechanical fees effective July 1, 2026: "HVAC change out only" $156.00; the schedule has the rest |
| Patio Permit | Permit required | Any size | See schedule |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | Permit required | Any size | County Code 16.0204(i)(1) sets flat fees effective July 1; the schedule has the rest |
| Roof Replacement Permit | Permit required | Any size | County Code 16.0204(h)(8) sets a flat re-roof fee effective July 1; the schedule has the rest |
| Shed Permit | It depends | floor area of a detached residential accessory structure | See schedule |
Frequently asked questions
- Do you need a solar permit in San Bernardino County?
- Yes, before installing a roof-mount or ground-mount photovoltaic system or a solar water heating system at a home in the unincorporated county. If you are unsure how that applies to your project, call the San Bernardino County Land Use Services Department, Building and Safety Division at 909-387-8311 before you start.
- How much does a solar permit cost in San Bernardino County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the San Bernardino County Land Use Services Department, Building and Safety Division at 909-387-8311.
- Where do you apply for a solar permit in San Bernardino County?
- You can apply through the San Bernardino County permit portal or contact the San Bernardino County Land Use Services Department, Building and Safety Division directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in San Bernardino County?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how San Bernardino County applies this before you apply.
From the Library
Solar Permit in other California localities
Everything above, sourced
How this solar permit page for San Bernardino County was verified. 2 official sources: lus.sbcounty.gov, wp.sbcounty.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with San Bernardino County Land Use Services Department, Building and Safety Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page