California / San Bernardino County
Electrical Permit in San Bernardino County, California
Permit required
Yes, a permit is required
Before doing electrical work on an existing building, including a service panel or subpanel upgrade, panel replacement or relocation, meter work, generator installation, battery storage, faulty wiring repair, or temporary power.
Issued bySan Bernardino County Land Use Services Department, Building and Safety Division
By Mario Bailey, verified against official sources
Quick answer
San Bernardino County requires an Electrical permit for electrical work on an existing building or structure, and "Electrical, Plumbing, Mechanical and Structural Repairs" is on the county's published list of items requiring a permit. The Electrical application's typical projects include Electrical Panel - New, Replacement and Relocation, Electrical Upgrade - Service Panel, Subpanel and Panel, Electrical Meter, Electrical - Generator Installation, Battery - Power Storage System, Battery - Backup System, Electrical - Faulty Wiring Repair and Temporary Power with Span Poles. Electric vehicle charging stations are called out separately on the county's permit list as "Electric Charging Station."
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before doing electrical work on an existing building, including a service panel or subpanel upgrade, panel replacement or relocation, meter work, generator installation, battery storage, faulty wiring repair, or temporary power.
What an electrical permit costs in San Bernardino County
How San Bernardino County compares in California
No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alameda County | Permit required | ...permit scope, 'Electrical Permit 20% of Building Permit Fees, $140.00... |
| Contra Costa County | Permit required | Land Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00... |
| Fresno County | Permit required | Section 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each |
| Los Angeles | Permit required | ...per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55... |
| Los Angeles County | Permit required | ...of Los Angeles Code, Ord No. 2013-0049), effective July 1, 2026: $41.35... |
| Orange County | Permit required | Electrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25... |
| San Bernardino Countythis page | Permit required | ...effective July 1, 2026: "Meter change out and upgrades only" $195.00... |
How to apply in San Bernardino County
In San Bernardino County, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.
What most electrical permit applications include:
- Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
- For San Bernardino County, the written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
- For San Bernardino County, the application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
- Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
- Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).
General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. San Bernardino County Land Use Services Department, Building and Safety Division sets the exact checklist for San Bernardino County.
Where to apply in San Bernardino County:
San Bernardino County Land Use Services Department, Building and Safety Division
- County Government Center, 385 N. Arrowhead Ave., First Floor, San Bernardino, CA 92415
- Phone: 909-387-8311
Electrical Permit in San Bernardino County compared with nearby California localities
| Locality | Permit needed? | Threshold | What each California schedule says | Verified |
|---|---|---|---|---|
| San Bernardino County | Permit required | Any size | ...fees effective July 1, 2026: "Meter change out and upgrades only" $195.00, "New... | |
| Alameda County | Permit required | Any size | ...of a building permit scope, 'Electrical Permit 20% of Building Permit Fees, $140.00... | |
| Contra Costa County | Permit required | Any size | Land Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00 minimum."... | |
| Fresno County | Permit required | Any size | Section 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each | |
| Los Angeles | Permit required | Any size | ...item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for... |
Inspections and closing out your permit
In San Bernardino County, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
- In San Bernardino County: a rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
- In San Bernardino County: the framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
- In San Bernardino County: ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
- In San Bernardino County: arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
- In San Bernardino County: panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
- In San Bernardino County: the service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
- In San Bernardino County: a final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the San Bernardino County permit portal or by phone at 909-387-8311.
Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Electrical Permit checklist for San Bernardino County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before doing electrical work on an existing building, including a service panel or subpanel upgrade, panel replacement or relocation, meter work, generator installation, battery storage, faulty wiring repair, or temporary power.
- Budget the fee. County Code 16.0204(b)(1) sets residential electrical fees effective July 1, 2026: "Meter change out and upgrades only" $195.00, "New wire or rewire" $312.00, "Meter reset" $195.00 (each additional meter reset at the same address $39.00), "Temporary power with span poles" $156.00, and "All other residential electrical work not listed in Section 16.0204(b)(1)" $156.00. The ordinance states "All electrical permits include two inspections. Additional inspections will be charged a re-inspection fee." A $57.00 intake processing fee under 16.0204(h)(1) is applied to each electrical permit. Official fee schedule.
- Apply. In San Bernardino County, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished. Start at the San Bernardino County permit portal.
- Keep the office details handy. San Bernardino County Land Use Services Department, Building and Safety Division. Phone: 909-387-8311. Address: County Government Center, 385 N. Arrowhead Ave., First Floor, San Bernardino, CA 92415.
- Plan for inspections. In San Bernardino County, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need an electrical permit in San Bernardino County?
- San Bernardino County requires an Electrical permit for electrical work on an existing building or structure, and "Electrical, Plumbing, Mechanical and Structural Repairs" is on the county's published list of items requiring a permit. The Electrical application's typical projects include Electrical Panel - New, Replacement and Relocation, Electrical Upgrade - Service Panel, Subpanel and Panel, Electrical Meter, Electrical - Generator Installation, Battery - Power Storage System, Battery - Backup System, Electrical - Faulty Wiring Repair and Temporary Power with Span Poles. Electric vehicle charging stations are called out separately on the county's permit list as "Electric Charging Station." Always confirm with the San Bernardino County Land Use Services Department, Building and Safety Division before starting.
- How much does an electrical permit cost in San Bernardino County?
- County Code 16.0204(b)(1) sets residential electrical fees effective July 1, 2026: "Meter change out and upgrades only" $195.00, "New wire or rewire" $312.00, "Meter reset" $195.00 (each additional meter reset at the same address $39.00), "Temporary power with span poles" $156.00, and "All other residential electrical work not listed in Section 16.0204(b)(1)" $156.00. The ordinance states "All electrical permits include two inspections. Additional inspections will be charged a re-inspection fee." A $57.00 intake processing fee under 16.0204(h)(1) is applied to each electrical permit. See the official fee schedule for current amounts.
- Where do you apply for an electrical permit in San Bernardino County?
- You can apply through the San Bernardino County permit portal or contact the San Bernardino County Land Use Services Department, Building and Safety Division directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in San Bernardino County?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how San Bernardino County applies this before you apply.
From the Library
What else needs a permit in San Bernardino County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | floor area of a detached residential accessory structure | ...Deck, Carport, Patio Cover": for Construction Type VA/VB the base cost is $691 at... |
| Fence Permit | It depends | height of a fence or block wall | ...flat fee: "Chain link, wood and/or wrought iron fencing: A) Residential" is $117.00... |
| HVAC Permit | Permit required | Any size | ...residential mechanical fees effective July 1, 2026: "HVAC change out only" $156.00... |
| Patio Permit | Permit required | Any size | ...Deck, Carport, Patio Cover": for Construction Type VA/VB the base cost is $691 at... |
| Plumbing Permit | Permit required | Any size | ..."Fixture or traps including water drainage piping and backflow protection": $156.00... |
| Pool Permit | Permit required | Any size | ...July 1, 2026 for "Swimming pools accessory to single-family dwellings": $647.00... |
| Roof Replacement Permit | Permit required | Any size | ...1, 2026: "Re-roofs: A) Residential (with detached or attached garage)" is $234.00... |
| Shed Permit | It depends | floor area of a detached residential accessory structure | ...is "U Accessory-Barn or Shed": for Construction Type VA/VB the base cost is $3,091... |
| Solar Permit | Permit required | Any size | ...systems for single family residential - roof mount system": plan review $215.00... |
Electrical Permit in other California localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not San Bernardino County documents; the office above sets the local rules.
How this electrical permit page for San Bernardino County was verified. 2 official sources: lus.sbcounty.gov, wp.sbcounty.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with San Bernardino County Land Use Services Department, Building and Safety Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Electrical Permit requirements across California localities