California / San Bernardino County
HVAC Permit in San Bernardino County, California
Permit required
Yes, a permit is required
Before replacing or installing an HVAC system, air conditioning condenser, furnace, wall heater, rooftop unit or fireplace at an existing building in the unincorporated county.
By Mario Bailey, verified against official sources
Quick answer
San Bernardino County requires a Mechanical permit for mechanical work on an existing building or structure, and "Electrical, Plumbing, Mechanical and Structural Repairs" appears on the county's published list of items requiring a permit with no exemption threshold. The Mechanical application's typical-project list is explicit about what counts: HVAC, HVAC - Change Out, HVAC - Roof Mounted, Rooftop AC, Air Conditioning Condenser - Remove and Replace, Furnace - New, Furnace - Replacement, Furnace - Propane, Heater, Heater - Wall, Fireplace - New and Fireplace - Replacement. The county publishes no like-for-like changeout exemption; a changeout has its own fee line.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before replacing or installing an HVAC system, air conditioning condenser, furnace, wall heater, rooftop unit or fireplace at an existing building in the unincorporated county.
What an HVAC permit costs in San Bernardino County
How San Bernardino County compares in California
No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alameda County | Permit required | Building Inspection Department Service Fee Schedule (Schedule A, effective... |
| Contra Costa County | Permit required | Land Development Fee Schedule S-002 D.6, "Mechanical Permit (Other) $75.00... |
| Fresno County | Permit required | Section 2510 Mechanical Code Fees, FY 2026-27: Issuing each permit $42.77 |
| Los Angeles | Permit required | Itemized per piece of equipment per LADBS Fee Sch.3 (7/2017), for example a... |
| Los Angeles County | Permit required | Mechanical Code Fee Schedule (Title 29 of the County of Los Angeles Code, Ord... |
| Orange County | Permit required | Mechanical Permit Application Flat Fee: $400 for FY 2024-25, $420 for FY... |
| San Bernardino Countythis page | Permit required | County Code 16.0204(d)(1) sets residential mechanical fees effective July 1... |
How to apply in San Bernardino County
A residential HVAC (mechanical) permit application must identify the covered equipment and scope of work, since installing, altering, or replacing a heating or cooling system is regulated work that cannot start until the application is submitted and the permit issued. The equipment itself must be picked by a real sizing calculation rather than a rule of thumb.
What most HVAC permit applications include:
- A mechanical permit is required before anyone may install, alter, repair, remove, convert, or replace a heating, ventilating, or air conditioning system regulated by the code, and the work may not begin until the application is submitted and the permit is issued (IRC R105.1).
- The application identifies the specific equipment being installed, such as a furnace, heat pump, or air conditioner, since the unit must be installed according to its listing and the manufacturer's installation instructions (IRC M1401.1).
- The proposed equipment location must leave the clearances needed to clean coils and replace filters, blowers, motors, and controls after installation (IRC M1401.2).
- The application carries the equipment sizing basis: ACCA Manual J building loads and Manual S equipment selection, or another approved sizing method, not a rule of thumb (IRC M1401.3).
- For a split system, the work covered by the permit includes refrigerant suction line insulation, since the piping is inspected against that standard once installed (IRC M1411.6).
General submittal guidance from International Residential Code (IRC), 2021 edition, Chapter 1 (Permits) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. San Bernardino County Land Use Services Department, Building and Safety Division sets the exact checklist for San Bernardino County.
Where to apply in San Bernardino County:
San Bernardino County Land Use Services Department, Building and Safety Division
- County Government Center, 385 N. Arrowhead Ave., First Floor, San Bernardino, CA 92415
- Phone: 909-387-8311
Inspections and closing out your permit
Mechanical work gets a rough in inspection after the ductwork, refrigerant lines, and gas piping are in but before they are covered or concealed, followed by a final inspection that confirms the equipment operates correctly and its clearances, combustion air, and condensate disposal are in place. A straight equipment changeout with no new ductwork commonly gets a single final inspection instead of a separate rough in trip.
- Rough inspection of the mechanical and gas systems must be made before the work is covered or concealed, before fixtures or appliances are set or installed, and before the framing inspection (IRC R109.1.2).
- Where a cooling coil is added to an existing warm air furnace, the rough in confirms the coil is not installed upstream of the heat exchanger unless the furnace is listed for it, and that the blower can handle the added static pressure (IRC M1411.2).
- The rough in and final both confirm the appliance access opening and working space are large enough to service the unit (IRC M1305.1).
- At final inspection, the inspector verifies the equipment has adequate combustion air, with openings kept clear for the distance the code requires (IRC M1402.3).
- Final inspection also checks that the condensate line drains to an approved point of disposal with the required slope and does not create a nuisance (IRC M1411.3).
- For a straight equipment changeout with no new ductwork, many permit offices require only a single final inspection, while a new installation still gets a rough in inspection before the final (common local inspection practice).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the San Bernardino County permit portal or by phone at 909-387-8311.
Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Required Inspections) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your HVAC Permit checklist for San Bernardino County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before replacing or installing an HVAC system, air conditioning condenser, furnace, wall heater, rooftop unit or fireplace at an existing building in the unincorporated county.
- Budget the fee. County Code 16.0204(d)(1) sets residential mechanical fees effective July 1, 2026: "HVAC change out only" $156.00, "Wall heater, floor furnace, radiant heat and all other heating elements" $156.00, and "All other residential mechanical work not listed in Section 16.0204(d)(1)" $156.00. The ordinance states "All mechanical permits include two inspections. Additional inspections will be charged a re-inspection fee." A $57.00 intake processing fee under 16.0204(h)(1) is applied to each mechanical permit, and where a mechanical plan must be submitted the plan review fee is $244.00. Official fee schedule.
- Apply. A residential HVAC (mechanical) permit application must identify the covered equipment and scope of work, since installing, altering, or replacing a heating or cooling system is regulated work that cannot start until the application is submitted and the permit issued. The equipment itself must be picked by a real sizing calculation rather than a rule of thumb. Start at the San Bernardino County permit portal.
- Keep the office details handy. San Bernardino County Land Use Services Department, Building and Safety Division. Phone: 909-387-8311. Address: County Government Center, 385 N. Arrowhead Ave., First Floor, San Bernardino, CA 92415.
- Plan for inspections. Mechanical work gets a rough in inspection after the ductwork, refrigerant lines, and gas piping are in but before they are covered or concealed, followed by a final inspection that confirms the equipment operates correctly and its clearances, combustion air, and condensate disposal are in place. A straight equipment changeout with no new ductwork commonly gets a single final inspection instead of a separate rough in trip.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need an HVAC permit in San Bernardino County?
- San Bernardino County requires a Mechanical permit for mechanical work on an existing building or structure, and "Electrical, Plumbing, Mechanical and Structural Repairs" appears on the county's published list of items requiring a permit with no exemption threshold. The Mechanical application's typical-project list is explicit about what counts: HVAC, HVAC - Change Out, HVAC - Roof Mounted, Rooftop AC, Air Conditioning Condenser - Remove and Replace, Furnace - New, Furnace - Replacement, Furnace - Propane, Heater, Heater - Wall, Fireplace - New and Fireplace - Replacement. The county publishes no like-for-like changeout exemption; a changeout has its own fee line. Always confirm with the San Bernardino County Land Use Services Department, Building and Safety Division before starting.
- How much does an HVAC permit cost in San Bernardino County?
- County Code 16.0204(d)(1) sets residential mechanical fees effective July 1, 2026: "HVAC change out only" $156.00, "Wall heater, floor furnace, radiant heat and all other heating elements" $156.00, and "All other residential mechanical work not listed in Section 16.0204(d)(1)" $156.00. The ordinance states "All mechanical permits include two inspections. Additional inspections will be charged a re-inspection fee." A $57.00 intake processing fee under 16.0204(h)(1) is applied to each mechanical permit, and where a mechanical plan must be submitted the plan review fee is $244.00. See the official fee schedule for current amounts.
- Where do you apply for an HVAC permit in San Bernardino County?
- You can apply through the San Bernardino County permit portal or contact the San Bernardino County Land Use Services Department, Building and Safety Division directly. The links are listed on this page.
- Can a homeowner pull an HVAC permit themselves in San Bernardino County?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner-builder from contractor licensing when the owner personally performs the work, or uses only wage employees, on their own property and does not intend the improvements for sale. A homeowner may also directly hire licensed trade contractors for up to four single-family residences a year, or improve their own principal residence without a general contractor's license, as long as they have actually lived there for the 12 months before the work is finished. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a building permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a $500 civil penalty. Confirm how San Bernardino County applies this before you apply.
From the Library
What else needs a permit in San Bernardino County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | floor area of a detached residential accessory structure | Decks are priced off the FY 2026/27 Construction Fee Schedule adopted under County Code... |
| Electrical Permit | Permit required | Not specified | County Code 16.0204(b)(1) sets residential electrical fees effective July 1, 2026:... |
| Fence Permit | It depends | height of a fence or block wall | San Bernardino County Code section 16.0204(g)(3) prices fencing as a flat fee: "Chain... |
| Patio Permit | Permit required | Not specified | Patio covers are priced off the FY 2026/27 Construction Fee Schedule adopted under... |
| Plumbing Permit | Permit required | Not specified | County Code 16.0204(c)(1) sets residential plumbing fees effective July 1, 2026 for... |
| Pool Permit | Permit required | Not specified | County Code 16.0204(i)(1) sets flat fees effective July 1, 2026 for "Swimming pools... |
| Roof Replacement Permit | Permit required | Not specified | County Code 16.0204(h)(8) sets a flat re-roof fee effective July 1, 2026: "Re-roofs: A)... |
| Shed Permit | It depends | floor area of a detached residential accessory structure | Sheds are priced off the FY 2026/27 Construction Fee Schedule adopted under County Code... |
| Solar Permit | Permit required | Not specified | County Code 16.0204(j)(1) sets fees effective July 1, 2026 for "15KW or less... |
HVAC Permit in other California localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not San Bernardino County documents; the office above sets the local rules.
Verified by a person against the sources above on , not confirmed with San Bernardino County Land Use Services Department, Building and Safety Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare HVAC Permit requirements across California localities
Permit office
San Bernardino County Land Use Services Department, Building and Safety Division
909-387-8311Permit portal