Fence Permit in Salt Lake City, Utah
Permit required
Yes, a permit is required
Before installing any fence or wall on a residential lot.
Issued bySalt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods
By Mario Bailey, verified against official sources
Quick answer
Salt Lake City issues its own building, electrical, plumbing, mechanical and fire permits inside city limits through its Building Services division (Building Services & Civil Enforcement), whose Building Permits page quotes the City rule that no one may build, alter or repair a structure "or make any installation, alteration or improvement to the electrical, plumbing or mechanical system" without permits "from the building official" (City Code 18.20.010); there is no state permit handoff for any trade, and Utah's Division of Professional Licensing licenses contractors but issues no permits. The City adopts the codes "as adopted by the State of Utah" (18.04.040), so the 2021 IRC with Utah's statewide amendments governs. Addresses outside incorporated Salt Lake City are not covered: the City's page says Magna, Kearns, Emigration Canyon and other unincorporated Salt Lake County districts are served by the Greater Salt Lake Municipal Services District, and neighbouring incorporated cities such as South Salt Lake, Millcreek, West Valley City and North Salt Lake are separate municipalities outside the City's jurisdiction. Every fence needs a City permit: the Building Services FAQ says the installation of a fence requires a permit from Building Services, and the City's Residential Fences, Walls and Hedges handout says a Building Permit is required prior to construction of any fence or wall. Fences are applied for as a Residential Fence Permit with a site plan showing location and height; walls are applied for as a Residential Building Permit.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare fence installer quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before installing any fence or wall on a residential lot.
What a fence permit costs in Salt Lake City
How to apply in Salt Lake City
In Salt Lake City, most residential fences fall under the model code's 7-foot building-permit exemption, so the real approval step is a lightweight zoning or land-use permit built around a simple site plan showing the fence's location, height, and material, checked against setbacks and any corner-lot sight-triangle rule. A fence that will serve as a required swimming-pool barrier is the exception, since barrier fences carry life-safety requirements of their own.
What most fence permit applications include:
- For Salt Lake City, a fence 7 feet or under is exempt from the model code's building permit, the same threshold the IRC uses for other small projects (IRC 2021 R105.2).
- That exemption only removes the building-code permit. It does not authorize skipping a jurisdiction's own zoning approval, which is why an exempt fence can still need its own land-use or zoning permit rather than a building permit (IRC 2021 R105.2).
- Whatever your jurisdiction calls that approval, the application centers on a basic site plan: a drawing of the property showing the fence's location, height, and material, and how it relates to the property lines (common local zoning practice).
- For Salt Lake City, the same plan is checked against required setbacks and, on corner lots or near intersections, a sight-triangle rule that caps fence height so it does not block sightlines for drivers (common local zoning practice).
- For Salt Lake City, a fence that will serve as a required swimming-pool barrier is handled as life-safety work rather than the light zoning process, and at least one state's adopted residential code requires a building permit for barrier fences regardless of the general fence exemption (Oregon Residential Specialty Code 2021, R101.2.2).
General submittal guidance from International Residential Code (IRC), 2021 edition, Section R105.2. Source. Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods sets the exact checklist for Salt Lake City.
Where to apply in Salt Lake City:
Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods
- City Hall, 451 South State Street, Room 215, Salt Lake City, UT 84111
- Phone: (801) 535-7968
- Email: slcpermits@slc.gov
Inspections and closing out your permit
In Salt Lake City, inspection follows the permit: a fence that never needed one gets no inspection at all under the model code, and a permitted fence typically gets a single final check rather than the staged inspections used for a house. The exception is a fence serving as a swimming-pool barrier, which gets its own dedicated barrier inspection covering height, gaps, and gate hardware.
- In Salt Lake City: inspection duty attaches only to work for which a permit is required, so a fence that qualified for the permit exemption carries no inspection obligation under the model code (IRC 2021 R109.1).
- In Salt Lake City: where a fence permit was issued, the process skips the staged foundation, frame, and rough-in inspections used for buildings and goes straight to one final inspection once the fence is finished (IRC 2021 R109.1.6).
- In Salt Lake City: that single check is typically a zoning compliance inspection rather than a structural review, confirming the fence matches the approved height and site plan (common local practice).
- A fence built as a swimming-pool barrier breaks that light-touch pattern in Salt Lake City: it is separately inspected for barrier compliance, commonly required before the pool itself can be signed off (ISPSC 305; local pool-barrier inspection programs).
- In Salt Lake City: that barrier inspection checks dimensional rules from the swimming pool and spa code rather than ordinary fence rules, including the minimum 48 inch barrier height and limits on openings and gaps a young child could pass through (ISPSC 305).
- Gate hardware is inspected too in Salt Lake City: a self-closing, self-latching gate is part of the barrier requirement, since an unlatched gate defeats the fence's purpose as a barrier (ISPSC 305).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Salt Lake City permit portal or by phone at (801) 535-7968.
Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109, and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Fence Permit checklist for Salt Lake City
- Confirm the requirement. Yes, a permit is required. Usually needed: Before installing any fence or wall on a residential lot.
- Budget the fee. "Fencing Permit" $47, a flat fee in the Salt Lake City Consolidated Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"); City Code 18.20.020.F: "A fee shown on the Salt Lake City consolidated fee schedule shall be charged for each permit for fencing.". Official fee schedule.
- Apply. In Salt Lake City, most residential fences fall under the model code's 7-foot building-permit exemption, so the real approval step is a lightweight zoning or land-use permit built around a simple site plan showing the fence's location, height, and material, checked against setbacks and any corner-lot sight-triangle rule. A fence that will serve as a required swimming-pool barrier is the exception, since barrier fences carry life-safety requirements of their own. Start at the Salt Lake City permit portal.
- Keep the office details handy. Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods. Phone: (801) 535-7968. Address: City Hall, 451 South State Street, Room 215, Salt Lake City, UT 84111.
- Plan for inspections. In Salt Lake City, inspection follows the permit: a fence that never needed one gets no inspection at all under the model code, and a permitted fence typically gets a single final check rather than the staged inspections used for a house. The exception is a fence serving as a swimming-pool barrier, which gets its own dedicated barrier inspection covering height, gaps, and gate hardware.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a fence permit in Salt Lake City?
- Salt Lake City issues its own building, electrical, plumbing, mechanical and fire permits inside city limits through its Building Services division (Building Services & Civil Enforcement), whose Building Permits page quotes the City rule that no one may build, alter or repair a structure "or make any installation, alteration or improvement to the electrical, plumbing or mechanical system" without permits "from the building official" (City Code 18.20.010); there is no state permit handoff for any trade, and Utah's Division of Professional Licensing licenses contractors but issues no permits. The City adopts the codes "as adopted by the State of Utah" (18.04.040), so the 2021 IRC with Utah's statewide amendments governs. Addresses outside incorporated Salt Lake City are not covered: the City's page says Magna, Kearns, Emigration Canyon and other unincorporated Salt Lake County districts are served by the Greater Salt Lake Municipal Services District, and neighbouring incorporated cities such as South Salt Lake, Millcreek, West Valley City and North Salt Lake are separate municipalities outside the City's jurisdiction. Every fence needs a City permit: the Building Services FAQ says the installation of a fence requires a permit from Building Services, and the City's Residential Fences, Walls and Hedges handout says a Building Permit is required prior to construction of any fence or wall. Fences are applied for as a Residential Fence Permit with a site plan showing location and height; walls are applied for as a Residential Building Permit. Always confirm with the Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods before starting.
- How much does a fence permit cost in Salt Lake City?
- "Fencing Permit" $47, a flat fee in the Salt Lake City Consolidated Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"); City Code 18.20.020.F: "A fee shown on the Salt Lake City consolidated fee schedule shall be charged for each permit for fencing.". See the official fee schedule for current amounts.
- How long does a fence permit take in Salt Lake City?
- In Salt Lake City, a fence permit typically takes 1-3 business days (the FAQ routes fences through the quick turn around queue). Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a fence permit in Salt Lake City?
- You can apply through the Salt Lake City permit portal or contact the Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods directly. The links are listed on this page.
- Can a homeowner pull a fence permit themselves in Salt Lake City?
- Under Utah law (Utah Code 58-55-305(1)(d), (e), (j), (2); 15A-1-209(3)(b)(vi)): Yes, within limits. A sole owner of property may build without a contractor license no more than one residential structure per year, and no more than three per five years, on their own property for their own noncommercial, nonpublic use, plus incidental structures such as a shed, carport, or detached garage (58-55-305(1)(d)). Unpaid helpers working under the owner's direction for token compensation are also exempt, but anyone else who builds the home must be licensed if the work requires it (58-55-305(1)(d)(i), (1)(e)). Owners and lessees, and their regular employees, are exempt when maintaining the property (58-55-305(1)(j)). The state's standardized permit form records whether the applicant is an original contractor or an owner-builder (15A-1-209(3)(b)(vi)), and a building department that issues a permit to an owner under this exemption must notify DOPL (58-55-305(2)). No state owner-builder disclosure form or resale restriction was found. Confirm how Salt Lake City applies this before you apply.
From the Library
What else needs a permit in Salt Lake City
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Before replacing or relocating plumbing fixtures, adding or altering circuits, or moving... | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Deck Permit | It depends | Deck height above grade at any point; an exempt deck must also not require guardrails and must not serve a required exit door | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Electrical Permit | Permit required | Any size | Residential electrical: "Base Fee" $59 |
| EV Charger Permit | Permit required | Any size | Electrical permit: "Base Fee" $59 plus "Minor remodel and additional circuits" $40 for a... |
| HVAC Permit | Permit required | Any size | Mechanical permit: "Base Fee" $59 plus item fees, for example "Installation or... |
| Plumbing Permit | Permit required | Any size | Plumbing permit: "Base fee" $59 plus item fees, for example "Plumbing fixture or trap... |
| Pool Permit | It depends | Water depth of a residential swimming pool or spa, above ground or in ground | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Roof Replacement Permit | Permit required | Any size | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Shed Permit | It depends | Floor area of a residential shed, playhouse or similar one-story detached accessory building | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Solar Permit | Permit required | Any size | "Solar Panel Permit Fee", by "System Size in kW": "0 - 5 kW" $264 |
| Water Heater Permit | Permit required | Any size | "Water heater" $16 each under Plumbing Permits, plus the plumbing "Base fee" $59 (Salt... |
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Salt Lake City documents; the office above sets the local rules.
How this fence permit page for Salt Lake City was verified. 2 official sources: slc.gov, slc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page