Roof Replacement Permit in Salt Lake City, Utah
Permit required
Yes, a permit is required
Before any reroof or roof replacement.
Issued bySalt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods
By Mario Bailey, verified against official sources
Quick answer
Salt Lake City requires a permit to reroof any structure. The City's Re-Roofing Questionnaire collects existing and proposed roofing materials, roof deck type and the number of existing layers; if the added roofing weight exceeds 3 pounds per square foot, an evaluation from a licensed Utah engineer is required. The owner of an owner-occupied primary residence may pull the permit; on a rental the FAQ requires a contractor unless the job is general maintenance or repair under $3,000 in valuation, which it says includes roofing.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.
Compare roofing quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before any reroof or roof replacement.
What a roof replacement permit costs in Salt Lake City
How to apply in Salt Lake City
In Salt Lake City, a residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies.
What most roof replacement permit applications include:
- State on the application whether the job is a roof replacement, which strips all existing layers down to the bare deck, or a roof recover, which leaves the old covering in place under specific conditions, since the two scopes are governed differently (IRC R908.3).
- For Salt Lake City, a recover is only an option where the new covering follows the roof covering manufacturer's approved instructions or is a self-supporting system, such as standing-seam metal, that does not rely on the existing roof for support (IRC R908.3.1).
- Full tear-off must be scoped on the application instead of a recover when the existing roof is water soaked or deteriorated, is slate, clay, cement, or asbestos-cement tile, or already carries two or more layers of roof covering (IRC R908.3.1.1).
- For Salt Lake City, the materials and installation methods described on the application must comply with the reroofing requirements of the roof-assemblies chapter (IRC R908.1).
- If the scope reuses existing slate, clay, or cement tile, damaged or broken pieces cannot be listed for reinstallation, and any rusted or deteriorated flashings, edgings, outlets, or vents uncovered during tear-off must be scoped for replacement (IRC R908.5).
General submittal guidance from IRC Section R908 Reroofing (text as adopted in the 2020 Residential Code of New York State, based on the 2018 IRC). Source. Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods sets the exact checklist for Salt Lake City.
Where to apply in Salt Lake City:
Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods
- City Hall, 451 South State Street, Room 215, Salt Lake City, UT 84111
- Phone: (801) 535-7968
- Email: slcpermits@slc.gov
Inspections and closing out your permit
In Salt Lake City, most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.
- In Salt Lake City: where the covering is fully removed and the sheathing is exposed, replaced, or added, inspectors check the deck and its nailing before any new roofing goes down, since the structural framework must be able to carry the new covering's loads (IRC R908.2).
- In Salt Lake City: an overlay is only approved where it meets one of the code's listed recover conditions, such as installation in accordance with the covering manufacturer's approved instructions (IRC R908.3.1).
- In Salt Lake City: flashings disturbed or replaced during the job are checked against the approved manufacturer's installation instructions, and metal flashing that will receive bituminous material must be primed before installation (IRC R908.6).
- In Salt Lake City: a final inspection confirms the completed roof covering and its fasteners were installed as required for that material and per manufacturer instructions before the permit is closed (IRC R905).
- In Salt Lake City: in some regions with strengthened wind provisions, reroofing an older single-family home also triggers inspection of supplemental deck-nailing and a secondary water barrier added during tear-off, on top of the base reroofing requirements (Florida Building Code, Residential R908.7 Mitigation).
- In Salt Lake City: reinstalled existing slate, clay, or cement tile is checked against reuse limits at inspection, and any rusted, damaged, or deteriorated flashings, edgings, outlets, or vents found during tear-off must be replaced rather than reinstalled (IRC R908.5).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Salt Lake City permit portal or by phone at (801) 535-7968.
Inspection sequence from IRC Section R908 Reroofing and Section R905 Roof Coverings (2021 International Residential Code). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Roof Replacement Permit checklist for Salt Lake City
- Confirm the requirement. Yes, a permit is required. Usually needed: Before any reroof or roof replacement.
- Budget the fee. Building permit fee from the valuation table in the Salt Lake City Consolidated Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 - $500.00" $55.97 and "$2,000.01 - $25,000.00" "$115.97 for the first $2,000 plus $20 for each additional $1,000 or fraction thereof, to and including $25,000", plus a plan review fee of "65% of building permit fee" (18.20.020.B). The City's Permit Fee Estimate page lists Roofing among the application types billed as building permit fees. Official fee schedule.
- Apply. In Salt Lake City, a residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies. Start at the Salt Lake City permit portal.
- Keep the office details handy. Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods. Phone: (801) 535-7968. Address: City Hall, 451 South State Street, Room 215, Salt Lake City, UT 84111.
- Plan for inspections. In Salt Lake City, most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a roof replacement permit in Salt Lake City?
- Salt Lake City requires a permit to reroof any structure. The City's Re-Roofing Questionnaire collects existing and proposed roofing materials, roof deck type and the number of existing layers; if the added roofing weight exceeds 3 pounds per square foot, an evaluation from a licensed Utah engineer is required. The owner of an owner-occupied primary residence may pull the permit; on a rental the FAQ requires a contractor unless the job is general maintenance or repair under $3,000 in valuation, which it says includes roofing. Always confirm with the Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods before starting.
- How much does a roof replacement permit cost in Salt Lake City?
- Building permit fee from the valuation table in the Salt Lake City Consolidated Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 - $500.00" $55.97 and "$2,000.01 - $25,000.00" "$115.97 for the first $2,000 plus $20 for each additional $1,000 or fraction thereof, to and including $25,000", plus a plan review fee of "65% of building permit fee" (18.20.020.B). The City's Permit Fee Estimate page lists Roofing among the application types billed as building permit fees. See the official fee schedule for current amounts.
- How long does a roof replacement permit take in Salt Lake City?
- In Salt Lake City, a roof replacement permit typically takes 1-3 business days (the FAQ routes re-roofs through the quick turn around queue). Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a roof replacement permit in Salt Lake City?
- You can apply through the Salt Lake City permit portal or contact the Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods directly. The links are listed on this page.
- Can a homeowner pull a roof replacement permit themselves in Salt Lake City?
- Under Utah law (Utah Code 58-55-305(1)(d), (e), (j), (2); 15A-1-209(3)(b)(vi)): Yes, within limits. A sole owner of property may build without a contractor license no more than one residential structure per year, and no more than three per five years, on their own property for their own noncommercial, nonpublic use, plus incidental structures such as a shed, carport, or detached garage (58-55-305(1)(d)). Unpaid helpers working under the owner's direction for token compensation are also exempt, but anyone else who builds the home must be licensed if the work requires it (58-55-305(1)(d)(i), (1)(e)). Owners and lessees, and their regular employees, are exempt when maintaining the property (58-55-305(1)(j)). The state's standardized permit form records whether the applicant is an original contractor or an owner-builder (15A-1-209(3)(b)(vi)), and a building department that issues a permit to an owner under this exemption must notify DOPL (58-55-305(2)). No state owner-builder disclosure form or resale restriction was found. Confirm how Salt Lake City applies this before you apply.
From the Library
What else needs a permit in Salt Lake City
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Before replacing or relocating plumbing fixtures, adding or altering circuits, or moving... | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Deck Permit | It depends | Deck height above grade at any point; an exempt deck must also not require guardrails and must not serve a required exit door | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Electrical Permit | Permit required | Any size | Residential electrical: "Base Fee" $59 |
| EV Charger Permit | Permit required | Any size | Electrical permit: "Base Fee" $59 plus "Minor remodel and additional circuits" $40 for a... |
| Fence Permit | Permit required | Any size | "Fencing Permit" $47, a flat fee in the Salt Lake City Consolidated Fee Schedule... |
| HVAC Permit | Permit required | Any size | Mechanical permit: "Base Fee" $59 plus item fees, for example "Installation or... |
| Plumbing Permit | Permit required | Any size | Plumbing permit: "Base fee" $59 plus item fees, for example "Plumbing fixture or trap... |
| Pool Permit | It depends | Water depth of a residential swimming pool or spa, above ground or in ground | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Shed Permit | It depends | Floor area of a residential shed, playhouse or similar one-story detached accessory building | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Solar Permit | Permit required | Any size | "Solar Panel Permit Fee", by "System Size in kW": "0 - 5 kW" $264 |
| Water Heater Permit | Permit required | Any size | "Water heater" $16 each under Plumbing Permits, plus the plumbing "Base fee" $59 (Salt... |
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Salt Lake City documents; the office above sets the local rules.
How this roof replacement permit page for Salt Lake City was verified. 2 official sources: slc.gov, slc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Roof Replacement Permit requirements across Utah localities