Bathroom Remodel Permit in Salt Lake City, Utah
It depends
Sometimes, depending on the project
Before replacing or relocating plumbing fixtures, adding or altering circuits, or moving walls; finish work alone needs no permit.
Issued bySalt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods
By Mario Bailey, verified against official sources
Quick answer
Salt Lake City publishes no bathroom-specific rule, so its general rules decide it: painting, laying flooring and other cosmetic work are exempt, while alterations such as adding or removing walls or changing the layout usually require a building permit, and any installation or alteration of plumbing or electrical work requires a trade permit. The City's plumbing fee schedule prices the replacement or relocation of each existing plumbing fixture, so swapping a toilet, tub or vanity is plumbing permit work, not a cosmetic exemption.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.
Compare bathroom remodel quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before replacing or relocating plumbing fixtures, adding or altering circuits, or moving walls; finish work alone needs no permit.
What a bathroom remodel permit costs in Salt Lake City
How to apply in Salt Lake City
In Salt Lake City, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.
What most bathroom remodel permit applications include:
- Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
- For Salt Lake City, the permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
- Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
- For Salt Lake City, a bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
- New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
- Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
- Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).
General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods sets the exact checklist for Salt Lake City.
Where to apply in Salt Lake City:
Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods
- City Hall, 451 South State Street, Room 215, Salt Lake City, UT 84111
- Phone: (801) 535-7968
- Email: slcpermits@slc.gov
Inspections and closing out your permit
In Salt Lake City, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
- In Salt Lake City: any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
- In Salt Lake City: the plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
- In Salt Lake City: work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
- Scheduling is on the permit holder in Salt Lake City: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
- In Salt Lake City: a final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Salt Lake City permit portal or by phone at (801) 535-7968.
Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Bathroom Remodel Permit checklist for Salt Lake City
- Confirm the requirement. Sometimes, depending on the project. Usually needed: Before replacing or relocating plumbing fixtures, adding or altering circuits, or moving walls; finish work alone needs no permit.
- Budget the fee. Building permit if walls or layout change (building permit fee from the valuation table in the Salt Lake City Consolidated Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 - $500.00" $55.97 and "$2,000.01 - $25,000.00" "$115.97 for the first $2,000 plus $20 for each additional $1,000 or fraction thereof, to and including $25,000", plus a plan review fee of "65% of building permit fee" (18.20.020.B)); plumbing permit "Base fee" $59 plus $8 per fixture (18.56.040); electrical "Minor remodel and additional circuits" $40 plus the $59 base fee, or "Homeowner electrical remodel permit" $48 (18.36.100), all from the Salt Lake City Consolidated Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"). Official fee schedule.
- Apply. In Salt Lake City, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt. Start at the Salt Lake City permit portal.
- Keep the office details handy. Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods. Phone: (801) 535-7968. Address: City Hall, 451 South State Street, Room 215, Salt Lake City, UT 84111.
- Plan for inspections. In Salt Lake City, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a bathroom remodel permit in Salt Lake City?
- Salt Lake City publishes no bathroom-specific rule, so its general rules decide it: painting, laying flooring and other cosmetic work are exempt, while alterations such as adding or removing walls or changing the layout usually require a building permit, and any installation or alteration of plumbing or electrical work requires a trade permit. The City's plumbing fee schedule prices the replacement or relocation of each existing plumbing fixture, so swapping a toilet, tub or vanity is plumbing permit work, not a cosmetic exemption. Always confirm with the Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods before starting.
- How much does a bathroom remodel permit cost in Salt Lake City?
- Building permit if walls or layout change (building permit fee from the valuation table in the Salt Lake City Consolidated Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 - $500.00" $55.97 and "$2,000.01 - $25,000.00" "$115.97 for the first $2,000 plus $20 for each additional $1,000 or fraction thereof, to and including $25,000", plus a plan review fee of "65% of building permit fee" (18.20.020.B)); plumbing permit "Base fee" $59 plus $8 per fixture (18.56.040); electrical "Minor remodel and additional circuits" $40 plus the $59 base fee, or "Homeowner electrical remodel permit" $48 (18.36.100), all from the Salt Lake City Consolidated Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"). See the official fee schedule for current amounts.
- Where do you apply for a bathroom remodel permit in Salt Lake City?
- You can apply through the Salt Lake City permit portal or contact the Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods directly. The links are listed on this page.
- Can a homeowner pull a bathroom remodel permit themselves in Salt Lake City?
- Under Utah law (Utah Code 58-55-305(1)(d), (e), (j), (2); 15A-1-209(3)(b)(vi)): Yes, within limits. A sole owner of property may build without a contractor license no more than one residential structure per year, and no more than three per five years, on their own property for their own noncommercial, nonpublic use, plus incidental structures such as a shed, carport, or detached garage (58-55-305(1)(d)). Unpaid helpers working under the owner's direction for token compensation are also exempt, but anyone else who builds the home must be licensed if the work requires it (58-55-305(1)(d)(i), (1)(e)). Owners and lessees, and their regular employees, are exempt when maintaining the property (58-55-305(1)(j)). The state's standardized permit form records whether the applicant is an original contractor or an owner-builder (15A-1-209(3)(b)(vi)), and a building department that issues a permit to an owner under this exemption must notify DOPL (58-55-305(2)). No state owner-builder disclosure form or resale restriction was found. Confirm how Salt Lake City applies this before you apply.
From the Library
What else needs a permit in Salt Lake City
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Deck height above grade at any point; an exempt deck must also not require guardrails and must not serve a required exit door | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Electrical Permit | Permit required | Any size | Residential electrical: "Base Fee" $59 |
| EV Charger Permit | Permit required | Any size | Electrical permit: "Base Fee" $59 plus "Minor remodel and additional circuits" $40 for a... |
| Fence Permit | Permit required | Any size | "Fencing Permit" $47, a flat fee in the Salt Lake City Consolidated Fee Schedule... |
| HVAC Permit | Permit required | Any size | Mechanical permit: "Base Fee" $59 plus item fees, for example "Installation or... |
| Plumbing Permit | Permit required | Any size | Plumbing permit: "Base fee" $59 plus item fees, for example "Plumbing fixture or trap... |
| Pool Permit | It depends | Water depth of a residential swimming pool or spa, above ground or in ground | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Roof Replacement Permit | Permit required | Any size | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Shed Permit | It depends | Floor area of a residential shed, playhouse or similar one-story detached accessory building | ...Fee Schedule (FY2027, "Amended 06/16/2026 by Ord. 2026 - 29"), for example "$0.01 -... |
| Solar Permit | Permit required | Any size | "Solar Panel Permit Fee", by "System Size in kW": "0 - 5 kW" $264 |
| Water Heater Permit | Permit required | Any size | "Water heater" $16 each under Plumbing Permits, plus the plumbing "Base fee" $59 (Salt... |
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Salt Lake City documents; the office above sets the local rules.
How this bathroom remodel permit page for Salt Lake City was verified. 2 official sources: slc.gov, slc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Salt Lake City Building Services (Building Services & Civil Enforcement), Department of Community and Neighborhoods. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Bathroom Remodel Permit requirements across Utah localities