Colorado / Jefferson County

Fence Permit in Jefferson County, Colorado

No permit needed

No permit is typically required

Quick answer

Jefferson County does not require a permit for fences of any height in unincorporated Jefferson County. A Miscellaneous Permit is required only for a gate across a shared access serving multiple parcels, tracts, or lots, and that gate permit must first be approved by the local fire protection district. Fences and gates still must comply with the county Zoning Resolution, and those in the Wildland Urban Interface Overlay District must use materials compliant with the Wildfire Resiliency Code.

Issued by
Jefferson County Planning & Zoning Division
Confirmed on official page Verified

Usually no permit is needed here. Hiring the work out anyway?

Hire it out

Sponsored

Compare a few bids before you commit. If your project turns out to need a permit after all, ask each bidder who will pull it.

Compare fence installer quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a fence permit costs in Jefferson County

Fee schedule in force
Official scheduleRead .

No permit for fences in unincorporated Jefferson County;

a gate across shared access needs a Miscellaneous Zoning Permit priced at $90 on the 2026 zoning fee table.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Jefferson County compares in Colorado

JurisdictionPermit needed?Threshold
AuroraIt dependsfence height at which a building permit is required
DenverIt dependsfences not over 4 feet need no building permit; fences over 4 feet need a zoning permit; posthole-dug fences up to 8 feet need no building permit, other fence types over 4 feet do
Jefferson Countythis pageNo permit neededExempt

What to do instead in Jefferson County

There is no permit application to file for this work. Check your project against the rule on the official Jefferson County page. If it differs from what is described above, for example in size, height or location, ask the office below before you start.

Jefferson County Planning & Zoning Division

  • 100 Jefferson County Parkway, Suite 3550, Golden, CO 80419
  • Phone: 303-271-8700

Permitting activity in Jefferson County

In 2025, Jefferson County authorized permits for 1,118 new residential housing units (810 single-family, 308 in multi-family buildings), valued at $410M, down from 1,172 the year before. That works out to about 1.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 580,451.

What else needs a permit in Jefferson County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNo exemption by height or size: a Building Permit is required for new decks, deck expansions, replacement decks, and deck repairs. Only a ground-level concrete pad, rather than an elevated deck, avoids the permit.See schedule
Electrical PermitPermit requiredAny sizeSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsa concrete pad does not require a building permit; a home addition that expands the house's footprint or changes its height or roofline requires a Building Permit; the county has no rule written specifically for patiosNot published
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitPermit requiredA Miscellaneous Permit is required for swimming pools of any size, in-ground or above-ground, and related structures such as diving boards and ladders; hot tubs and swim spas do not need this permit. Any electrical work for the pool needs a separate Building Safety electrical permit.Pools of any size need a Miscellaneous Permit priced at $90 on the 2026 zoning fee table plus a separate Building Safety electrical permit for pool wiring
Roof Replacement PermitPermit requiredA Building Permit is required for full roof replacement. Only minor roof repairs affecting less than 25% of the total roof area and no more than 2 squares are exempt; anything larger needs a permit plus a mid-roof and a final inspection.Full roof replacement bills as a building permit on the countywide valuation fee table with a $55 minimum
Shed PermitPermit requiredSheds, mini-structures, and shipping containers 120 sq ft or less that sit at least 10 feet from any occupied structure and are no more than 14 feet tall need only a Miscellaneous Permit; anything larger, taller, or closer than 10 feet to an occupied structure needs a full Building Permit instead. Some permit is required at every size.Sheds 120 sq ft or less and at least 10 feet from an occupied structure need only a $90 Miscellaneous Permit
Solar PermitPermit requiredRoof-mounted solar panels flush against the roof need no Planning and Zoning permit but always need an Electrical Permit. Panels raised up to 5 feet above the roof need a Miscellaneous Permit from Planning and Zoning in addition to the Electrical Permit. Ground-mount and commercial grid-sale systems have additional requirements.Solar permit fees are capped at $500 for residential systems, per the county Building Permit Fee Schedule

Frequently asked questions

Do you need a fence permit in Jefferson County?
No. If you are unsure how that applies to your project, call the Jefferson County Planning & Zoning Division at 303-271-8700 before you start.
How much does a fence permit cost in Jefferson County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Jefferson County Planning & Zoning Division at 303-271-8700.
Can a homeowner pull a fence permit themselves in Jefferson County?
Under Colorado law (C.R.S. 12-115-116(2); C.R.S. 12-115-120(11)(c); C.R.S. 12-155-118(2); C.R.S. 12-155-120(11)(c)): Colorado's state electrical law has a homeowner exception: under C.R.S. 12-115-116(2), you do not need an electrician's license to do electrical work on your own property or residence, as long as all the work, other than maintenance or repair of existing systems, is inspected under the state law. The exception does not apply if the property is intended for sale or resale by someone in the construction or remodeling business, is rental property, or is generally open to the public. A homeowner performing work on the homeowner's home is a qualified applicant who may pull the state electrical permit under C.R.S. 12-115-120(11)(c), and plumbing mirrors this: C.R.S. 12-155-118(2) allows unlicensed plumbing work on your own property or residence with the same carve-outs, and C.R.S. 12-155-120(11)(c) lets a homeowner pull the state plumbing permit. The State Electrical and Plumbing Boards at DORA require that the homeowner personally perform the work, that it be inspected before cover and again at completion, and that it meet the National Electrical Code or the adopted plumbing codes. Colorado has no statewide general contractor license: Title 12 licenses electricians and plumbers at the state level, and general building contractors are licensed, if at all, by the individual city or county. Confirm how Jefferson County applies this before you apply.

From the Library

Fence Permit in other Colorado localities

Everything above, sourced

How this fence permit page for Jefferson County was verified. 1 official source: jeffco.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Jefferson County Planning & Zoning Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

No permit needed