Patio Permit in Brevard County, Florida
Not confirmed
We could not confirm this
By Mario Bailey, verified against official sources
Quick answer
Patio permit requirements were not confirmed from a specific Brevard County page. No county permit category, FAQ, or code-compliance list names patios, and the closest categories are the Residential Addition and Residential Renovation permits. Confirm requirements with Building Permits at (321) 633-2187 before starting a patio project.
Applying yourself? Start with the office.
What your patio permit must meet in Florida
Florida covered patios and screened patios or lanais are built under the Florida Building Code, Residential, 8th Edition (2023), which uses its own patio-cover appendix with wind load as the governing design criterion, while aluminum-frame screen enclosures are engineered under the wind-load provisions of the Florida Building Code, Building.
- Patio covers are governed by the FBC Residential patio-cover appendix; in the 8th Edition its design-loads section was revised to remove the snow-load reference, leaving wind load as the governing design criterion statewide (FBC-R Appendix H, AH105.1).
- Wind loads for screen enclosures are not calculated under the normal building wind-load method; they must be determined under Florida Building Code, Building, Section 2002.4 instead, per an express exception in Section 1609.1.1 of the current code (FBC-B 1609.1.1, 2002.4).
Based on Florida Building Code, Residential, 8th Edition (2023), Appendix H (AH105.1); Florida Building Code, Building, 8th Edition (2023), Sections 1609.1.1 and 2002.4. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What a patio permit costs in Brevard County
How Brevard County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Brevard Countythis page | Not confirmed | Not specified |
| Broward County | Permit required | Not specified |
| Hernando County | It depends | Sand-set pavers that are not part of a pool or spa deck do not require a building permit; other patio construction methods are not separately addressed by name |
| Lee County | It depends | A permit is required to construct, enlarge, alter, or repair a structure, including structural slabs, unenclosed structures, porches, and screen, glass, or vinyl rooms; the county refers residents to Florida Building Code 105.2 and Land Development Code 6-117 for work not requiring a permit. |
| Leon County | It depends | Patio covers, sunrooms, and screen or pool enclosures are handled as aluminum structures requiring a permit; a plain open, unroofed, at-grade patio slab is not separately addressed in any published county page found. |
| Miami-Dade County | It depends | open concrete slabs and pavers outside the building do not require a building permit; roofed or screened patio enclosures require a permit |
| Orange County | Permit required | Not specified |
How to apply in Brevard County
Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.
What most patio permit applications include:
- Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
- A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
- Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
- For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
- By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).
General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. Brevard County Planning and Development Department, Building Permits Division sets the exact checklist for Brevard County.
Where to apply in Brevard County:
Brevard County Planning and Development Department, Building Permits Division
- 2725 Judge Fran Jamieson Way, Room A114, Viera, FL 32940
- Phone: (321) 633-2187
- Email: Building.Licensing@BrevardFL.gov
Inspections and closing out your permit
A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
- A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
- A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
- A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
- An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
- Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Brevard County permit portal or by phone at (321) 633-2187.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Patio Permit checklist for Brevard County
- Confirm the requirement. Not confirmed, contact the office.
- Apply. Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement. Start at the Brevard County permit portal.
- Keep the office details handy. Brevard County Planning and Development Department, Building Permits Division. Phone: (321) 633-2187. Address: 2725 Judge Fran Jamieson Way, Room A114, Viera, FL 32940.
- Plan for inspections. A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a patio permit in Brevard County?
- Patio permit requirements were not confirmed from a specific Brevard County page. No county permit category, FAQ, or code-compliance list names patios, and the closest categories are the Residential Addition and Residential Renovation permits. Confirm requirements with Building Permits at (321) 633-2187 before starting a patio project. Always confirm with the Brevard County Planning and Development Department, Building Permits Division before starting.
- How much does a patio permit cost in Brevard County?
- Fees are set by Brevard County and are not published here. Contact the office for current amounts.
- Where do you apply for a patio permit in Brevard County?
- You can apply through the Brevard County permit portal or contact the Brevard County Planning and Development Department, Building Permits Division directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Brevard County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Brevard County applies this before you apply.
From the Library
What else needs a permit in Brevard County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Not published |
| Electrical Permit | It depends | Permits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring. | Brevard's Residential Electrical Permit Application fee table lists a Building Code... |
| Fence Permit | It depends | Permit not required for repair or replacement of less than 50% of an existing fence using the same size and material in the same location. | Brevard's Residential Fence Permit Application fee table lists a $25.00 Application... |
| HVAC Permit | Permit required | Not specified | Brevard's Residential HVAC/Mechanical Permit Application fee table lists a Building Code... |
| Plumbing Permit | It depends | Permits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks. | Brevard's Residential Plumbing Permit Application fee table lists a Building Code Review... |
| Pool Permit | It depends | Permits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater. | Brevard's Residential Pool Permit Application fee table lists a Building Code Review fee... |
| Roof Replacement Permit | Permit required | Not specified | Brevard's Residential Reroof Permit Application fee table lists a Building Code Review... |
| Shed Permit | It depends | A permit is required for an accessory structure (shed) over 100 square feet. | Sheds are filed under the Residential Addition permit category, whose fee table lists a... |
| Solar Permit | Permit required | Not specified | Brevard's Residential Solar Photovoltaic Permit Application fee table lists a Building... |
Patio Permit in other Florida localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Brevard County documents; the office above sets the local rules.
- 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions)
- 2021 International Residential Code (IRC), Section R109 (Inspections)
- Florida Building Code, Residential, 8th Edition (2023), Appendix H (AH105.1); Florida Building Code, Building, 8th Edition (2023), Sections 1609.1.1 and 2002.4
Verified by a person against the sources above on , not confirmed with Brevard County Planning and Development Department, Building Permits Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Permit office
Brevard County Planning and Development Department, Building Permits Division
(321) 633-2187Permit portalFlorida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 ·
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 ·
Compare
Patio Permit across Florida