Patio Permit in Pima County, Arizona
By Mario Bailey Last checked 2026-07-06 · 1 official source
Verified against official sources From an official sourceIt depends
Quick answer
Pima County's "Do I Need a Permit?" list does not use the word "patio" directly, but its building exemption table covers the same scope under two line items: non-structural flat work (including open patio slabs) not more than 30 inches above adjacent grade is exempt, while enclosing a porch or patio with walls, screens, or windows requires a permit (item 15 of the list). Contact Development Services at 520-724-9000 to confirm how your specific patio project is classified.
Typical threshold: An open, ground-level patio slab counts as non-structural flat work not more than 30 inches above adjacent grade and does not require a permit; enclosing a porch or patio (adding walls, screens, or a roof enclosure) requires a permit.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Pima County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
For any covered or enclosed patio structure in unincorporated Pima County
What patio permit costs in Pima County
No patio-specific line; a patio cover requiring a permit is assessed under the general Buildings formula, base fee $69 plus 1.096% of the ICC square foot construction cost for the first 1,000 sq ft and 0.588% above that, per the Development Services Fee Schedule effective 2026-07-01.
How Pima County compares in Arizona
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Chandler | It depends | An open, unattached patio slab no more than 200 sq ft in area and not more than 30 inches above grade falls under the same code exemption as an unattached deck and does not require a permit; a patio cover (roofed structure) requires a permit regardless of size, per the city's Patio Covers guidance. |
| Gilbert | It depends | Only one-story detached non-habitable accessory structures up to 200 square feet are exempt from permit; attached patio covers and larger structures require a building permit. |
| Maricopa County | It depends | attached patio cover or patio enclosure connected to the house requires a building permit; ground-level open patio slab does not |
| Mesa | It depends | open ground-level patio slabs do not require a permit; covered patio structures or enclosed patio rooms require a permit |
| Peoria | Permit required | Not specified |
| Phoenix | Permit required | Not specified |
| Pima Countythis page | It depends | An open, ground-level patio slab counts as non-structural flat work not more than 30 inches above adjacent grade and does not require a permit; enclosing a porch or patio (adding walls, screens, or a roof enclosure) requires a permit. |
Closest patio permit thresholds outside Arizona
Jurisdictions we cover whose limit sits nearest Pima County's 30 in.
- Minneapolis, Minnesota, freestanding platforms less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; others may require a permit
How to apply in Pima County
Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.
What most patio permit applications include:
- Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
- A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
- Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
- For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
- By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).
General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. Pima County Development Services Department sets the exact checklist for Pima County.
Where to apply in Pima County:
Pima County Development Services Department
- 201 N. Stone Ave., Tucson, AZ 85701
- Phone: 520-724-9000
Inspections and closing out your permit
A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
- A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
- A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
- A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
- An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
- Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Pima County permit portal or by phone at 520-724-9000.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Patio Permit checklist for Pima County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: An open, ground-level patio slab counts as non-structural flat work not more than 30 inches above adjacent grade and does not require a permit; enclosing a porch or patio (adding walls, screens, or a roof enclosure) requires a permit. Usually needed: For any covered or enclosed patio structure in unincorporated Pima County.
- Budget the fee. No patio-specific line; a patio cover requiring a permit is assessed under the general Buildings formula, base fee $69 plus 1.096% of the ICC square foot construction cost for the first 1,000 sq ft and 0.588% above that, per the Development Services Fee Schedule effective 2026-07-01. Official fee schedule.
- Apply. Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement. Start at the Pima County permit portal.
- Keep the office details handy. Pima County Development Services Department. Phone: 520-724-9000. Address: 201 N. Stone Ave., Tucson, AZ 85701.
- Plan for inspections. A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
Compiled from the official sources on this page. Last checked 2026-07-06.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Frequently asked questions
- Do you need a patio permit in Pima County?
- Pima County's "Do I Need a Permit?" list does not use the word "patio" directly, but its building exemption table covers the same scope under two line items: non-structural flat work (including open patio slabs) not more than 30 inches above adjacent grade is exempt, while enclosing a porch or patio with walls, screens, or windows requires a permit (item 15 of the list). Contact Development Services at 520-724-9000 to confirm how your specific patio project is classified. An open, ground-level patio slab counts as non-structural flat work not more than 30 inches above adjacent grade and does not require a permit; enclosing a porch or patio (adding walls, screens, or a roof enclosure) requires a permit. Always confirm with the office before starting.
- How much does a patio permit cost in Pima County?
- No patio-specific line; a patio cover requiring a permit is assessed under the general Buildings formula, base fee $69 plus 1.096% of the ICC square foot construction cost for the first 1,000 sq ft and 0.588% above that, per the Development Services Fee Schedule effective 2026-07-01. See the official fee schedule for current amounts.
- Where do you apply for a patio permit in Pima County?
- You can apply through the Pima County permit portal or contact the Pima County Development Services Department directly. The links are listed on this page.
From the Library
What else needs a permit in Pima County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Decks and non-structural flat work not more than 30 inches above adjacent grade, not over any basement or story below, and not part of an accessible route do not require a permit; a deck greater than 30 inches above finished grade or floor level requires a permit. | Assessed as a building permit: base fee $69 plus 1.096% of the ICC square foot construc... |
| Electrical Permit | It depends | New electric outlet/fixture installations and photovoltaic systems or generators require a permit; wiring/devices operating under 25 volts and not exceeding 50 volt-amps, and like-for-like repair or replacement of switches, controls, overcurrent devices, fixed motors, transformers, or outlets/fixtures in the same location, do not. | Flat fee tiered by scope: minor work such as a service upgrade, reconnect, or up to fiv... |
| Fence Permit | It depends | Non-retaining walls and fences no more than 7 feet in height do not require a permit; fences taller than 7 feet require a building permit. | Fee is $0.25 per lineal foot plus the standard $69 base permit fee, per the Development... |
| HVAC Permit | It depends | New or replacement central air conditioners/furnaces, mini-split systems, and modifying or replacing duct work require a permit; portable cooling, heating, or ventilation units, and replacing an existing evaporative cooler with a like unit, do not. | Flat fee tiered by scope: minor work such as a residential air conditioner unit is $27,... |
| Plumbing Permit | It depends | New pipe work, propane tanks, septic systems, sewer connections, solar water heaters, water heater replacement, and new dishwashers require a permit; clearing stoppages or repairing leaks that do not involve replacing valves, pipes, or fixtures, fixture swaps (sinks, toilets, tubs), and grade-supported water tanks up to 5,000 gallons do not. | Flat fee tiered by scope: minor work such as a water heater or a gas, water, or drain l... |
| Pool Permit | It depends | Pre-fabricated residential pools installed entirely above ground require a building permit once they exceed 18 inches in depth and 5,000 gallons; any in-ground or custom-built residential pool or spa requires a building permit through Administrative Review regardless of size. | Not published |
| Roof Replacement Permit | It depends | Re-roofing with like materials (tile, shingles, etc.) does not require a permit; structural roof work requires a permit. | No fee for re-roofing with like materials since no permit is required per the county's... |
| Shed Permit | It depends | One-story detached tool and storage sheds, playhouses, and similar non-habitable accessory structures are the category Pima County's own adopted code amendments refer to as "structures exempted from permits"; the standard exemption size carried in the adopted IRC for this category is 200 sq ft with no electrical, plumbing, or mechanical connections, though Pima's own published guidance pages do not restate that figure directly. | No shed-specific line; |
| Solar Permit | Permit required | Not specified | Residential photovoltaic installation is treated as minor electrical work, flat fee $27... |
Patio Permit in other Arizona localities
Official sources
Verified by a person against the sources above on 2026-07-06, not confirmed with Pima County Development Services Department. Rules change; confirm before you build. How we verify.
Last checked: 2026-07-06Report an error on this page
Compare
Patio Permit across Arizona