Pool Permit in Pima County, Arizona

By Mario Bailey Last checked 2026-07-06 · 3 official sources

Verified against official sources Confirmed on official page

It depends

Quick answer

Pima County requires a building permit for custom in-ground residential pools, processed through the Development Services Administrative Review submittal process (construction drawings, sealed structural calculations, and possible review by Regional Flood Control District, Regional Wastewater Reclamation, or the Department of Environmental Quality). The county's "Do I Need a Permit?" list separately confirms a permit is required for pre-fabricated above-ground pools once they exceed 18 inches of depth and 5,000 gallons. Any pool, spa, or contained body of water must also have a compliant safety barrier under Pima County's adopted 2018 International Swimming Pool and Spa Code (minimum 48-inch barrier height, self-closing/self-latching gate); Arizona's statewide pool-barrier statute, A.R.S. Section 36-1681, sets an equivalent baseline barrier requirement.

Typical threshold: Pre-fabricated residential pools installed entirely above ground require a building permit once they exceed 18 inches in depth and 5,000 gallons; any in-ground or custom-built residential pool or spa requires a building permit through Administrative Review regardless of size.

18 in water depth
Threshold illustrated: 18 in water depth. Whether Pima County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-07-06.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Pima County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Before constructing any in-ground pool, or any above-ground pool exceeding 18 inches in depth and 5,000 gallons, in unincorporated Pima County

What your pool permit must meet in Arizona

Arizona has a statewide law requiring a compliant physical barrier around residential swimming pools and spas, independent of whichever local building code applies to the rest of a project.

  • The barrier requirement applies to any pool or contained body of water at least 18 inches deep and wider than 8 feet, under A.R.S. 36-1681.
  • The pool must be entirely enclosed by at least a 5 foot wall, fence, or other barrier measured on its exterior side, under A.R.S. 36-1681.
  • The barrier cannot have openings large enough for a 4 inch diameter sphere to pass through, under A.R.S. 36-1681.
  • Pool gates must be self-closing and self-latching, with the latch mounted at least 54 inches above the ground, under A.R.S. 36-1681.

Based on A.R.S. 36-1681 (Pool enclosures; requirements; exceptions; enforcement). Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What pool permit costs in Pima County

Pima County does not publish a fee for this permit type in a schedule we can verify. Ask Pima County Development Services Department how the fee is calculated for your project.

Official fee schedule

How Pima County compares in Arizona

JurisdictionPermit needed?Threshold
ChandlerIt dependsA prefabricated swimming pool less than 18 inches deep is exempt from a building permit; any pool or spa (in-ground or prefabricated) 18 inches deep or greater requires a permit, and a compliant safety barrier is required regardless of depth once a permit-triggering pool exists.
GilbertPermit requiredNon-permanent wading pools of rubber or plastic holding no more than 18 inches of water are excepted from the pool enclosure regulations.
Maricopa CountyPermit requiredNot specified
MesaPermit requiredNot specified
PeoriaPermit requiredPrefabricated above-ground pools accessory to a dwelling holding not more than 5,000 gallons are exempt from a pool permit, but the required barrier must still be permitted.
PhoenixPermit requiredNot specified
Pima Countythis pageIt dependsPre-fabricated residential pools installed entirely above ground require a building permit once they exceed 18 inches in depth and 5,000 gallons; any in-ground or custom-built residential pool or spa requires a building permit through Administrative Review regardless of size.

Closest pool permit thresholds outside Arizona

Jurisdictions we cover whose limit sits nearest Pima County's 18 in.

  • Austin, Texas, prefabricated pools less than 24 inches deep are exempt; all other residential pools require a permit
  • Jersey City, New Jersey, permit required for all pools that can hold more than 24 inches of water
  • Philadelphia, Pennsylvania, prefabricated swimming pools or spas less than 24 inches deep AND less than 5000 gallons do not require a permit; all larger pools require a permit
  • Chicago, Illinois, pools with water depth greater than 48 inches on a lot with 1 to 3 residential units require a full building permit with licensed architect or engineer plans; shallower pools with volume under 5000 gallons may be exempt

How to apply in Pima County

A residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.

What most pool permit applications include:

  • Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
  • The site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
  • For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
  • A barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
  • Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
  • The electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).

General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. Pima County Development Services Department sets the exact checklist for Pima County.

Where to apply in Pima County:

Pima County Development Services Department

  • 201 N. Stone Ave., Tucson, AZ 85701
  • Phone: 520-724-9000

Inspections and closing out your permit

Pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.

  1. Before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
  2. A bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
  3. A temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
  4. A pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
  5. At final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Pima County permit portal or by phone at 520-724-9000.

Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a pool permit in Pima County?
Pima County requires a building permit for custom in-ground residential pools, processed through the Development Services Administrative Review submittal process (construction drawings, sealed structural calculations, and possible review by Regional Flood Control District, Regional Wastewater Reclamation, or the Department of Environmental Quality). The county's "Do I Need a Permit?" list separately confirms a permit is required for pre-fabricated above-ground pools once they exceed 18 inches of depth and 5,000 gallons. Any pool, spa, or contained body of water must also have a compliant safety barrier under Pima County's adopted 2018 International Swimming Pool and Spa Code (minimum 48-inch barrier height, self-closing/self-latching gate); Arizona's statewide pool-barrier statute, A.R.S. Section 36-1681, sets an equivalent baseline barrier requirement. Pre-fabricated residential pools installed entirely above ground require a building permit once they exceed 18 inches in depth and 5,000 gallons; any in-ground or custom-built residential pool or spa requires a building permit through Administrative Review regardless of size. Always confirm with the office before starting.
How much does a pool permit cost in Pima County?
Fees are set by Pima County and are not published here. See the official fee schedule for current amounts.
Where do you apply for a pool permit in Pima County?
You can apply through the Pima County permit portal or contact the Pima County Development Services Department directly. The links are listed on this page.

From the Library

What else needs a permit in Pima County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsDecks and non-structural flat work not more than 30 inches above adjacent grade, not over any basement or story below, and not part of an accessible route do not require a permit; a deck greater than 30 inches above finished grade or floor level requires a permit.Assessed as a building permit: base fee $69 plus 1.096% of the ICC square foot construc...
Electrical PermitIt dependsNew electric outlet/fixture installations and photovoltaic systems or generators require a permit; wiring/devices operating under 25 volts and not exceeding 50 volt-amps, and like-for-like repair or replacement of switches, controls, overcurrent devices, fixed motors, transformers, or outlets/fixtures in the same location, do not.Flat fee tiered by scope: minor work such as a service upgrade, reconnect, or up to fiv...
Fence PermitIt dependsNon-retaining walls and fences no more than 7 feet in height do not require a permit; fences taller than 7 feet require a building permit.Fee is $0.25 per lineal foot plus the standard $69 base permit fee, per the Development...
HVAC PermitIt dependsNew or replacement central air conditioners/furnaces, mini-split systems, and modifying or replacing duct work require a permit; portable cooling, heating, or ventilation units, and replacing an existing evaporative cooler with a like unit, do not.Flat fee tiered by scope: minor work such as a residential air conditioner unit is $27,...
Patio PermitIt dependsAn open, ground-level patio slab counts as non-structural flat work not more than 30 inches above adjacent grade and does not require a permit; enclosing a porch or patio (adding walls, screens, or a roof enclosure) requires a permit.No patio-specific line;
Plumbing PermitIt dependsNew pipe work, propane tanks, septic systems, sewer connections, solar water heaters, water heater replacement, and new dishwashers require a permit; clearing stoppages or repairing leaks that do not involve replacing valves, pipes, or fixtures, fixture swaps (sinks, toilets, tubs), and grade-supported water tanks up to 5,000 gallons do not.Flat fee tiered by scope: minor work such as a water heater or a gas, water, or drain l...
Roof Replacement PermitIt dependsRe-roofing with like materials (tile, shingles, etc.) does not require a permit; structural roof work requires a permit.No fee for re-roofing with like materials since no permit is required per the county's...
Shed PermitIt dependsOne-story detached tool and storage sheds, playhouses, and similar non-habitable accessory structures are the category Pima County's own adopted code amendments refer to as "structures exempted from permits"; the standard exemption size carried in the adopted IRC for this category is 200 sq ft with no electrical, plumbing, or mechanical connections, though Pima's own published guidance pages do not restate that figure directly.No shed-specific line;
Solar PermitPermit requiredNot specifiedResidential photovoltaic installation is treated as minor electrical work, flat fee $27...

Pool Permit in other Arizona localities

Official sources

Verified by a person against the sources above on 2026-07-06, not confirmed with Pima County Development Services Department. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-06Report an error on this page