Arizona / Pima County

Shed Permit in Pima County, Arizona

By Mario Bailey Last checked 2026-07-06 · 3 official sources

Verified against official sources From an official source

It depends

Quick answer

Pima County's Development Services building-permit-resources page includes an amended code exception referring to "tool and storage sheds, playhouses, ramadas and similar structures exempted from permits," confirming a small-accessory-structure exemption exists in the county's adopted code. Neither the county's "Do I Need a Permit?" exemption list nor its Permit Types page restates the exact square footage, so the commonly used 200 sq ft / no-utilities threshold (the standard figure in the IRC and in every neighboring Arizona jurisdiction) is carried here as the best-supported but not directly county-published figure. Contact Development Services at 520-724-9000 to confirm your specific structure.

Typical threshold: One-story detached tool and storage sheds, playhouses, and similar non-habitable accessory structures are the category Pima County's own adopted code amendments refer to as "structures exempted from permits"; the standard exemption size carried in the adopted IRC for this category is 200 sq ft with no electrical, plumbing, or mechanical connections, though Pima's own published guidance pages do not restate that figure directly.

200 sq ftfootprint
Threshold illustrated: 200 sq ft. Whether Pima County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-07-06.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Pima County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

For any detached shed 200 sq ft or larger or any shed with electrical, plumbing, or mechanical connections in unincorporated Pima County

What shed permit costs in Pima County

No shed-specific line; assessed under the general Buildings formula, base fee $69 plus 1.096% of the ICC square foot construction cost for the first 1,000 sq ft and 0.588% above that, per the Development Services Fee Schedule effective 2026-07-01.

Official fee schedule

How Pima County compares in Arizona

Across the Arizona jurisdictions we have verified, the same threshold runs from 120 to 200, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
ChandlerIt dependsOne-story detached accessory structures (storage sheds, open-air ramadas) with floor area of 120 sq ft or less and height of 7 ft or less (up to 9 ft with 2 additional feet of setback per additional foot of height) are exempt if not connected to any electrical, gas, or water utility; exceeding either limit or connecting a utility requires a building permit.
GilbertIt dependsStructures less than 200 square feet do not require a permit; a permit is required at 200 square feet or larger, or if the shed has electrical or plumbing utilities or is connected to the house or another structure.
Maricopa CountyIt dependsstructures under 200 sq ft with no electrical plumbing or mechanical are exempt from a building permit; all others require a permit
MesaIt dependsdetached structures under 200 sq ft without utilities are exempt; structures 200 sq ft or larger or those with utilities require a permit
PeoriaIt dependsOne-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 200 square feet.
PhoenixIt dependsdetached structures without utilities at or under 200 sq ft are exempt; structures over 200 sq ft or with utilities require a permit
Pima Countythis pageIt dependsOne-story detached tool and storage sheds, playhouses, and similar non-habitable accessory structures are the category Pima County's own adopted code amendments refer to as "structures exempted from permits"; the standard exemption size carried in the adopted IRC for this category is 200 sq ft with no electrical, plumbing, or mechanical connections, though Pima's own published guidance pages do not restate that figure directly.

Closest shed permit thresholds outside Arizona

Jurisdictions we cover whose limit sits nearest Pima County's 200 sq ft.

  • Austin, Texas, one-story detached accessory structures used as tool or storage sheds with floor area no greater than 200 sq ft and no more than 15 ft in height and no plumbing and not in a floodplain are exempt
  • Bellevue, Washington, detached storage sheds playhouses or gazebos with a floor area of 200 square feet or less do not require a building permit; structures over 200 square feet require a permit
  • Clark County, Nevada, sheds over 200 sq ft require a building permit; storage sheds 200 sq ft or under may be exempt under Building Administrative Code Section 22.02.190
  • Clark County, Washington, Sheds over 200 square feet require a building permit; sheds of 200 square feet or less are exempt if they meet setbacks and easements, but any size shed in a mobile home park or multi-family zone requires a permit.

How to apply in Pima County

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Pima County Development Services Department sets the exact checklist for Pima County.

Where to apply in Pima County:

Pima County Development Services Department

  • 201 N. Stone Ave., Tucson, AZ 85701
  • Phone: 520-724-9000

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Pima County permit portal or by phone at 520-724-9000.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Pima County?
Pima County's Development Services building-permit-resources page includes an amended code exception referring to "tool and storage sheds, playhouses, ramadas and similar structures exempted from permits," confirming a small-accessory-structure exemption exists in the county's adopted code. Neither the county's "Do I Need a Permit?" exemption list nor its Permit Types page restates the exact square footage, so the commonly used 200 sq ft / no-utilities threshold (the standard figure in the IRC and in every neighboring Arizona jurisdiction) is carried here as the best-supported but not directly county-published figure. Contact Development Services at 520-724-9000 to confirm your specific structure. One-story detached tool and storage sheds, playhouses, and similar non-habitable accessory structures are the category Pima County's own adopted code amendments refer to as "structures exempted from permits"; the standard exemption size carried in the adopted IRC for this category is 200 sq ft with no electrical, plumbing, or mechanical connections, though Pima's own published guidance pages do not restate that figure directly. Always confirm with the office before starting.
How much does a shed permit cost in Pima County?
No shed-specific line; assessed under the general Buildings formula, base fee $69 plus 1.096% of the ICC square foot construction cost for the first 1,000 sq ft and 0.588% above that, per the Development Services Fee Schedule effective 2026-07-01. See the official fee schedule for current amounts.
Where do you apply for a shed permit in Pima County?
You can apply through the Pima County permit portal or contact the Pima County Development Services Department directly. The links are listed on this page.

From the Library

What else needs a permit in Pima County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsDecks and non-structural flat work not more than 30 inches above adjacent grade, not over any basement or story below, and not part of an accessible route do not require a permit; a deck greater than 30 inches above finished grade or floor level requires a permit.Assessed as a building permit: base fee $69 plus 1.096% of the ICC square foot construc...
Electrical PermitIt dependsNew electric outlet/fixture installations and photovoltaic systems or generators require a permit; wiring/devices operating under 25 volts and not exceeding 50 volt-amps, and like-for-like repair or replacement of switches, controls, overcurrent devices, fixed motors, transformers, or outlets/fixtures in the same location, do not.Flat fee tiered by scope: minor work such as a service upgrade, reconnect, or up to fiv...
Fence PermitIt dependsNon-retaining walls and fences no more than 7 feet in height do not require a permit; fences taller than 7 feet require a building permit.Fee is $0.25 per lineal foot plus the standard $69 base permit fee, per the Development...
HVAC PermitIt dependsNew or replacement central air conditioners/furnaces, mini-split systems, and modifying or replacing duct work require a permit; portable cooling, heating, or ventilation units, and replacing an existing evaporative cooler with a like unit, do not.Flat fee tiered by scope: minor work such as a residential air conditioner unit is $27,...
Patio PermitIt dependsAn open, ground-level patio slab counts as non-structural flat work not more than 30 inches above adjacent grade and does not require a permit; enclosing a porch or patio (adding walls, screens, or a roof enclosure) requires a permit.No patio-specific line;
Plumbing PermitIt dependsNew pipe work, propane tanks, septic systems, sewer connections, solar water heaters, water heater replacement, and new dishwashers require a permit; clearing stoppages or repairing leaks that do not involve replacing valves, pipes, or fixtures, fixture swaps (sinks, toilets, tubs), and grade-supported water tanks up to 5,000 gallons do not.Flat fee tiered by scope: minor work such as a water heater or a gas, water, or drain l...
Pool PermitIt dependsPre-fabricated residential pools installed entirely above ground require a building permit once they exceed 18 inches in depth and 5,000 gallons; any in-ground or custom-built residential pool or spa requires a building permit through Administrative Review regardless of size.Not published
Roof Replacement PermitIt dependsRe-roofing with like materials (tile, shingles, etc.) does not require a permit; structural roof work requires a permit.No fee for re-roofing with like materials since no permit is required per the county's...
Solar PermitPermit requiredNot specifiedResidential photovoltaic installation is treated as minor electrical work, flat fee $27...

Shed Permit in other Arizona localities

Official sources

Verified by a person against the sources above on 2026-07-06, not confirmed with Pima County Development Services Department. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-06Report an error on this page

Compare Shed Permit requirements across Arizona localities