Quick answer
Peoria exempts one-story detached accessory structures such as tool sheds and playhouses up to 200 square feet from a building permit under amended Section 105.2 of its administrative provisions. Larger sheds, casitas and garages need plan review and a building permit per handout 508, submitted online at devservices.peoriaaz.gov. Zoning rules still apply to exempt sheds, including placement limits tied to 8 and 9 foot heights and 200 and 300 square foot areas and a screening requirement.
Typical threshold: One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 200 square feet.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Peoria, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
Sheds over 200 square feet, any casita or garage, or any shed with utilities
What shed permit costs in Peoria
Valuation-based building permit fee, minimum 87 dollars; shed storage buildings are valued at 19.50 dollars per square foot in the Building Valuation Table and plan check adds 65 percent of the permit fee (Development Fee Schedule Rev 9/2025, fee increases effective 9/5/2025 per Ordinance 2025-21).
How Peoria compares in Arizona
Across the Arizona jurisdictions we have verified, the same threshold runs from 120 to 200, so a project that is exempt here may still need a permit one county over.
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Chandler | It depends | One-story detached accessory structures (storage sheds, open-air ramadas) with floor area of 120 sq ft or less and height of 7 ft or less (up to 9 ft with 2 additional feet of setback per additional foot of height) are exempt if not connected to any electrical, gas, or water utility; exceeding either limit or connecting a utility requires a building permit. |
| Gilbert | It depends | Structures less than 200 square feet do not require a permit; a permit is required at 200 square feet or larger, or if the shed has electrical or plumbing utilities or is connected to the house or another structure. |
| Maricopa County | It depends | structures under 200 sq ft with no electrical plumbing or mechanical are exempt from a building permit; all others require a permit |
| Mesa | It depends | detached structures under 200 sq ft without utilities are exempt; structures 200 sq ft or larger or those with utilities require a permit |
| Peoriathis page | It depends | One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 200 square feet. |
| Phoenix | It depends | detached structures without utilities at or under 200 sq ft are exempt; structures over 200 sq ft or with utilities require a permit |
| Pima County | It depends | One-story detached tool and storage sheds, playhouses, and similar non-habitable accessory structures are the category Pima County's own adopted code amendments refer to as "structures exempted from permits"; the standard exemption size carried in the adopted IRC for this category is 200 sq ft with no electrical, plumbing, or mechanical connections, though Pima's own published guidance pages do not restate that figure directly. |
Closest shed permit thresholds outside Arizona
Jurisdictions we cover whose limit sits nearest Peoria's 200 sq ft.
- Austin, Texas, one-story detached accessory structures used as tool or storage sheds with floor area no greater than 200 sq ft and no more than 15 ft in height and no plumbing and not in a floodplain are exempt
- Bellevue, Washington, detached storage sheds playhouses or gazebos with a floor area of 200 square feet or less do not require a building permit; structures over 200 square feet require a permit
- Clark County, Nevada, sheds over 200 sq ft require a building permit; storage sheds 200 sq ft or under may be exempt under Building Administrative Code Section 22.02.190
- Clark County, Washington, Sheds over 200 square feet require a building permit; sheds of 200 square feet or less are exempt if they meet setbacks and easements, but any size shed in a mobile home park or multi-family zone requires a permit.
How to apply in Peoria
A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Development and Engineering Department, Building Development sets the exact checklist for Peoria.
Where to apply in Peoria:
Development and Engineering Department, Building Development
- 9875 N. 85th Avenue, Peoria, AZ 85345
- Phone: 623-773-7225
- Email: building.applications@peoriaaz.gov
Inspections and closing out your permit
A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Peoria permit portal or by phone at 623-773-7225.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for Peoria
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 200 square feet. Usually needed: Sheds over 200 square feet, any casita or garage, or any shed with utilities.
- Budget the fee. Valuation-based building permit fee, minimum 87 dollars; shed storage buildings are valued at 19.50 dollars per square foot in the Building Valuation Table and plan check adds 65 percent of the permit fee (Development Fee Schedule Rev 9/2025, fee increases effective 9/5/2025 per Ordinance 2025-21). Official fee schedule.
- Apply. A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the Peoria permit portal.
- Keep the office details handy. Development and Engineering Department, Building Development. Phone: 623-773-7225. Address: 9875 N. 85th Avenue, Peoria, AZ 85345.
- Plan for inspections. A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked 2026-07-19.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Frequently asked questions
- Do you need a shed permit in Peoria?
- Peoria exempts one-story detached accessory structures such as tool sheds and playhouses up to 200 square feet from a building permit under amended Section 105.2 of its administrative provisions. Larger sheds, casitas and garages need plan review and a building permit per handout 508, submitted online at devservices.peoriaaz.gov. Zoning rules still apply to exempt sheds, including placement limits tied to 8 and 9 foot heights and 200 and 300 square foot areas and a screening requirement. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 200 square feet. Always confirm with the office before starting.
- How much does a shed permit cost in Peoria?
- Valuation-based building permit fee, minimum 87 dollars; shed storage buildings are valued at 19.50 dollars per square foot in the Building Valuation Table and plan check adds 65 percent of the permit fee (Development Fee Schedule Rev 9/2025, fee increases effective 9/5/2025 per Ordinance 2025-21). See the official fee schedule for current amounts.
- Where do you apply for a shed permit in Peoria?
- You can apply through the Peoria permit portal or contact the Development and Engineering Department, Building Development directly. The links are listed on this page.
From the Library
What else needs a permit in Peoria
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Platforms not more than 30 inches above adjacent grade that are not over a basement or story below and are not part of an accessible route are exempt from a permit. | Valuation-based building permit fee, minimum 87 dollars; |
| Electrical Permit | It depends | Minor in-kind work is exempt, including replacement of receptacles, switches or control devices rated 60 amperes or less and in-kind replacement of circuit breakers rated 125 amperes or less other than a service disconnect; new or altered wiring, services and panels require a permit. | Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9... |
| Fence Permit | It depends | Fences not over 3 feet high are exempt; fences over 3 feet and up to 7 feet require a building permit demonstrating zoning and site drainage compliance, and walls over 7 feet also require structural calculations. | Fence valuation for permit fees is 1.50 dollars per linear foot under 3 feet, 4 dollars... |
| HVAC Permit | It depends | Like-for-like replacement by a licensed contractor of an outdoor refrigeration unit of 5 tons or less is exempt, while replacement of equipment located inside the building and any new or altered mechanical system requires a permit. | Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9... |
| Patio Permit | Permit required | Not specified | Valuation-based building permit fee, minimum 87 dollars; |
| Plumbing Permit | It depends | Leak repairs, clearing stoppages and in-kind replacement of water closets, valves or fixtures are exempt, and a like-for-like water heater replacement in a one- or two-family dwelling is exempt only when performed by a licensed contractor; relocating or replacing concealed piping, valves or fixtures requires a permit. | Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9... |
| Pool Permit | Permit required | Prefabricated above-ground pools accessory to a dwelling holding not more than 5,000 gallons are exempt from a pool permit, but the required barrier must still be permitted. | Swimming Pool, Spa and/or Hot Tub Permit is 345 dollars and Swimming Pool Plot Plan rev... |
| Roof Replacement Permit | It depends | Re-roofing with the same type of material as the original roofing is exempt, provided not more than two layers of asphalt shingles are applied over an existing asphalt shingle roof; other roof replacements require a permit. | Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9... |
| Solar Permit | Permit required | Not specified | Residential Solar Photovoltaic Permit is 184 dollars for a 40 amp circuit or less/8K or... |
Shed Permit in other Arizona localities
Official sources
- https://www.peoriaaz.gov/business/development-services/plan-review-and-permits
- https://codelibrary.amlegal.com/codes/peoriaaz/latest/peoria_az/0-0-0-54936
- https://www.peoriaaz.gov/home/showpublisheddocument/1772/638173312944400000
- https://www.peoriaaz.gov/home/showpublisheddocument/5188/638989829461400000
- https://www.peoriaaz.gov/business/development-services/city-codes-and-regulations
- https://calhouncounty.sc.gov/sites/calhouncounty/files/Documents/Calhoun%20County/Departments/Building%20and%20Planning/2018IRC/2018%20IRC%20Building%20Guide_Accessory%20Structure.pdf
- https://www.botetourtva.gov/DocumentCenter/View/739/Accessory-Structure-Guide-pdf