Shed Permit in Peoria, Arizona

It depends

Sometimes, depending on the project

Sheds over 200 square feet, any casita or garage, or any shed with utilities

Quick answer

Peoria exempts one-story detached accessory structures such as tool sheds and playhouses up to 200 square feet from a building permit under amended Section 105.2 of its administrative provisions. Larger sheds, casitas and garages need plan review and a building permit per handout 508, submitted online at devservices.peoriaaz.gov. Zoning rules still apply to exempt sheds, including placement limits tied to 8 and 9 foot heights and 200 and 300 square foot areas and a screening requirement.

Diagram of the 200 sq ft footprint area threshold for a shed permit in Peoria, Arizona
Threshold illustrated: 200 sq ft. Whether Peoria requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-11-11.
Typical threshold
One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 200 square feet.
Issued by
Development and Engineering Department, Building Development
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a shed permit costs in Peoria

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .

Valuation-based building permit fee, minimum $87;

shed storage buildings are listed at $19.50 in the Building Valuation Table, which prints no unit for that figure, and plan check adds 65% of the building permit fee (Development Fee Schedule Rev. 9/2025).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Peoria compares in Arizona

Across the Arizona jurisdictions we have verified, the same threshold runs from 120 to 200, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
ChandlerIt dependsOne-story detached accessory structures are exempt from a building permit when the floor area does not exceed 120 square feet and the height at the highest point does not exceed 7 feet, with an option up to a maximum of 9 feet with added setback. A larger or taller structure needs a permit.
GilbertIt dependsStructures less than 200 square feet do not require a permit; a permit is required at 200 square feet or larger, or if the shed has electrical or plumbing utilities or is connected to the house or another structure.
Maricopa CountyIt dependsa non-habitable structure less than 200 square feet with no electrical, plumbing or mechanical components is exempt from a building permit; all other structures need one
MesaIt dependsdetached structures under 200 sq ft without utilities are exempt; structures larger than 200 sq ft or those with utilities require a permit; city sources differ on a structure of exactly 200 sq ft
Peoriathis pageIt dependsOne-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 200 square feet.
PhoenixIt dependsdetached structures without utilities at or under 200 sq ft are exempt; structures over 200 sq ft or with utilities require a permit
Pima CountyIt dependsPima County's building code amendments set the size in item 1 of the work exempt from permit list at 200 square feet in place of 120 square feet. Larger structures need a permit.

How to apply in Peoria

General guide, not specific to this office

What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Development and Engineering Department, Building Development

Permitting activity in Peoria

In 2025, Peoria authorized permits for 1,184 new residential housing units (984 single-family, 200 in multi-family buildings), valued at $180M, down from 1,901 the year before. That works out to about 6.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 179,872.

What else needs a permit in Peoria

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsPlatforms not more than 30 inches above adjacent grade that are not over a basement or story below and are not part of an accessible route are exempt from a permit.Valuation-based building permit fee, minimum 87 dollars
Electrical PermitIt dependsMinor in-kind work is exempt, including replacement of receptacles, switches or control devices rated 60 amperes or less and in-kind replacement of circuit breakers rated 125 amperes or less other than a service disconnect; new or altered wiring, services and panels require a permit.Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025)
Fence PermitIt dependsFences not over 3 feet high are exempt; fences over 3 feet and up to 7 feet require a building permit demonstrating zoning and site drainage compliance, and walls over 7 feet also require structural calculations.Fence valuation for permit fees is 1.50 dollars per linear foot under 3 feet; the schedule has the rest
HVAC PermitIt dependsLike-for-like replacement by a licensed contractor of an outdoor refrigeration unit of 5 tons or less is exempt, while replacement of equipment located inside the building and any new or altered mechanical system requires a permit.Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025)
Patio PermitPermit requiredAny sizeValuation-based building permit fee, minimum 87 dollars
Plumbing PermitIt dependsLeak repairs, clearing stoppages and in-kind replacement of water closets, valves or fixtures are exempt, and a like-for-like water heater replacement in a one- or two-family dwelling is exempt only when performed by a licensed contractor; relocating or replacing concealed piping, valves or fixtures requires a permit.Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025)
Pool PermitPermit requiredPrefabricated above-ground pools accessory to a dwelling holding not more than 5,000 gallons are exempt from a pool permit, but the required barrier must still be permitted.See schedule
Roof Replacement PermitIt dependsRe-roofing with the same type of material as the original roofing is exempt, provided not more than two layers of asphalt shingles are applied over an existing asphalt shingle roof; other roof replacements require a permit.Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025)
Solar PermitPermit requiredAny sizeResidential Solar Photovoltaic Permit is $184 for a 40 Amp Circuit or less/8K or less; the schedule has the rest

Frequently asked questions

Do you need a shed permit in Peoria?
It depends on the project. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 200 square feet. If you are unsure how that applies to your project, call the Development and Engineering Department, Building Development at 623-773-7225 before you start.
How much does a shed permit cost in Peoria?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Development and Engineering Department, Building Development at 623-773-7225.
Where do you apply for a shed permit in Peoria?
You can apply through the Peoria permit portal or contact the Development and Engineering Department, Building Development directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Peoria?
Under Arizona law (A.R.S. 32-1121(A)(5), (A)(9), (A)(14)(a); 32-1164(A)(2), (B)): Arizona addresses owner-builders through its contractor licensing law rather than through the building code itself. A.R.S. 32-1121(A)(5) exempts property owners who build or improve structures on their own land and do the work themselves, with their own employees, or with duly licensed contractors, as long as the finished structure is for the owner's own occupancy and is not intended for sale or rent. Selling or renting within one year of completion or of the certificate of occupancy is prima facie evidence the project was really undertaken for sale or rent, which defeats the exemption, a rule that functions much like Florida's one-year restriction. The exemption does not waive the underlying permit requirement: several of the chapter's small-job licensing exemptions, including the $1,000 casual-work exemption in A.R.S. 32-1121(A)(14), expressly do not apply whenever the work requires a local building permit, so once a job needs a permit, anyone doing that work for someone else generally must hold an Arizona contractor's license regardless of dollar amount. Acting as a contractor without a license, on permit-required work or otherwise, is a class 1 misdemeanor under A.R.S. 32-1164, carrying a mandatory minimum fine of $1,000 for a first offense and $2,000 for a repeat offense. Confirm how Peoria applies this before you apply.

From the Library

Shed Permit in other Arizona localities

Everything above, sourced

How this shed permit page for Peoria was verified. 5 official sources: peoriaaz.gov, codelibrary.amlegal.com, peoriaaz.gov, peoriaaz.gov, peoriaaz.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Development and Engineering Department, Building Development. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project