Arizona / Peoria

Plumbing Permit in Peoria, Arizona

By Mario Bailey Last checked 2026-07-19 · 5 official sources

Verified against official sources Confirmed on official page

It depends

Quick answer

The city's Plan Review and Building Permits page says even a homeowner replacing a water heater must have the project permitted through the Development and Engineering Department, while amended Section 105.2 exempts repairs, stoppage clearing, in-kind fixture replacement, water softeners, hot water recirculators and licensed-contractor like-for-like water heater replacement in one- and two-family dwellings. Relocated or replaced concealed piping, valves or fixtures require a permit under the 2018 International Plumbing Code as amended. Miscellaneous minor plumbing and gas line permits qualify for over the counter review by appointment.

Typical threshold: Leak repairs, clearing stoppages and in-kind replacement of water closets, valves or fixtures are exempt, and a like-for-like water heater replacement in a one- or two-family dwelling is exempt only when performed by a licensed contractor; relocating or replacing concealed piping, valves or fixtures requires a permit.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Peoria, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

New or relocated plumbing lines, valves and fixtures, and owner-performed water heater replacement

What plumbing permit costs in Peoria

Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025).

Official fee schedule

How Peoria compares in Arizona

JurisdictionPermit needed?Threshold
ChandlerIt dependsLike-for-like replacement of water conditioning/treatment equipment, solar pool or spa heating equipment, or electric water heating equipment is exempt when the replacement has equal or lesser capacity/amperage and is installed in the same location; new pipe work or system alterations require a permit.
GilbertPermit requiredWater softeners and like-for-like replacements of gas or electric water heating appliances (not tankless) installed by an Arizona licensed contractor are exempt from permit.
Maricopa CountyPermit requiredNot specified
MesaPermit requiredNot specified
Peoriathis pageIt dependsLeak repairs, clearing stoppages and in-kind replacement of water closets, valves or fixtures are exempt, and a like-for-like water heater replacement in a one- or two-family dwelling is exempt only when performed by a licensed contractor; relocating or replacing concealed piping, valves or fixtures requires a permit.
PhoenixPermit requiredNot specified
Pima CountyIt dependsNew pipe work, propane tanks, septic systems, sewer connections, solar water heaters, water heater replacement, and new dishwashers require a permit; clearing stoppages or repairing leaks that do not involve replacing valves, pipes, or fixtures, fixture swaps (sinks, toilets, tubs), and grade-supported water tanks up to 5,000 gallons do not.

How to apply in Peoria

You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.

What most plumbing permit applications include:

  • A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
  • The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
  • Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
  • Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
  • Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Development and Engineering Department, Building Development sets the exact checklist for Peoria.

Where to apply in Peoria:

Development and Engineering Department, Building Development

Inspections and closing out your permit

Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.

  1. Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
  2. Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
  3. Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
  4. The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
  5. The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
  6. At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
  7. Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Peoria permit portal or by phone at 623-773-7225.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a plumbing permit in Peoria?
The city's Plan Review and Building Permits page says even a homeowner replacing a water heater must have the project permitted through the Development and Engineering Department, while amended Section 105.2 exempts repairs, stoppage clearing, in-kind fixture replacement, water softeners, hot water recirculators and licensed-contractor like-for-like water heater replacement in one- and two-family dwellings. Relocated or replaced concealed piping, valves or fixtures require a permit under the 2018 International Plumbing Code as amended. Miscellaneous minor plumbing and gas line permits qualify for over the counter review by appointment. Leak repairs, clearing stoppages and in-kind replacement of water closets, valves or fixtures are exempt, and a like-for-like water heater replacement in a one- or two-family dwelling is exempt only when performed by a licensed contractor; relocating or replacing concealed piping, valves or fixtures requires a permit. Always confirm with the office before starting.
How much does a plumbing permit cost in Peoria?
Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025). See the official fee schedule for current amounts.
Where do you apply for a plumbing permit in Peoria?
You can apply through the Peoria permit portal or contact the Development and Engineering Department, Building Development directly. The links are listed on this page.

From the Library

What else needs a permit in Peoria

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsPlatforms not more than 30 inches above adjacent grade that are not over a basement or story below and are not part of an accessible route are exempt from a permit.Valuation-based building permit fee, minimum 87 dollars;
Electrical PermitIt dependsMinor in-kind work is exempt, including replacement of receptacles, switches or control devices rated 60 amperes or less and in-kind replacement of circuit breakers rated 125 amperes or less other than a service disconnect; new or altered wiring, services and panels require a permit.Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9...
Fence PermitIt dependsFences not over 3 feet high are exempt; fences over 3 feet and up to 7 feet require a building permit demonstrating zoning and site drainage compliance, and walls over 7 feet also require structural calculations.Fence valuation for permit fees is 1.50 dollars per linear foot under 3 feet, 4 dollars...
HVAC PermitIt dependsLike-for-like replacement by a licensed contractor of an outdoor refrigeration unit of 5 tons or less is exempt, while replacement of equipment located inside the building and any new or altered mechanical system requires a permit.Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9...
Patio PermitPermit requiredNot specifiedValuation-based building permit fee, minimum 87 dollars;
Pool PermitPermit requiredPrefabricated above-ground pools accessory to a dwelling holding not more than 5,000 gallons are exempt from a pool permit, but the required barrier must still be permitted.Swimming Pool, Spa and/or Hot Tub Permit is 345 dollars and Swimming Pool Plot Plan rev...
Roof Replacement PermitIt dependsRe-roofing with the same type of material as the original roofing is exempt, provided not more than two layers of asphalt shingles are applied over an existing asphalt shingle roof; other roof replacements require a permit.Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9...
Shed PermitIt dependsOne-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 200 square feet.Valuation-based building permit fee, minimum 87 dollars;
Solar PermitPermit requiredNot specifiedResidential Solar Photovoltaic Permit is 184 dollars for a 40 amp circuit or less/8K or...

Plumbing Permit in other Arizona localities

Official sources

Verified by a person against the sources above on 2026-07-19, not confirmed with Development and Engineering Department, Building Development. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-19Report an error on this page

Compare Plumbing Permit requirements across Arizona localities