Arizona / Gilbert

Plumbing Permit in Gilbert, Arizona

It depends

Sometimes, depending on the project

Plumbing and gas piping work beyond the exempt replacements

Quick answer

Gilbert's amendments to the residential code exempt water softeners from a permit. They also exempt replacement of gas water heaters of equal or less BTU/CFH rating and electric water heaters of equal or less amperage/voltage rating, not including tankless systems, when installed by an Arizona licensed contractor. Other residential plumbing work, including gas lines and LPG tanks, is submitted with a site plan showing utility routing and a gas diagram under the Miscellaneous Residential Checklist.

Typical threshold
Water softeners are exempt. Replacement of a gas water heater of equal or less BTU/CFH rating or an electric water heater of equal or less amperage/voltage rating (not tankless) is exempt when installed by an Arizona licensed contractor. Other plumbing and gas piping work needs a permit.
Issued by
Development Services (Plan Review and Inspection Division)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.

Compare plumber quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a plumbing permit costs in Gilbert

Fee schedule in force
Official scheduleRead .

Individual Plumbing Permit, residential: $150 (fee schedule revised 7/1/2026).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Gilbert compares in Arizona

JurisdictionPermit needed?Threshold
ChandlerIt dependsLike-for-like replacement of water conditioning/treatment equipment, solar pool or spa heating equipment, or electric water heating equipment is exempt when the replacement has equal or lesser capacity/amperage and is installed in the same location; new pipe work or system alterations require a permit.
Gilbertthis pageIt dependsWater softeners are exempt. Replacement of a gas water heater of equal or less BTU/CFH rating or an electric water heater of equal or less amperage/voltage rating (not tankless) is exempt when installed by an Arizona licensed contractor. Other plumbing and gas piping work needs a permit.
Maricopa CountyPermit requiredAny size
MesaPermit requiredAny size
PeoriaIt dependsLeak repairs, clearing stoppages and in-kind replacement of water closets, valves or fixtures are exempt, and a like-for-like water heater replacement in a one- or two-family dwelling is exempt only when performed by a licensed contractor; relocating or replacing concealed piping, valves or fixtures requires a permit.
PhoenixPermit requiredAny size
Pima CountyIt dependsNew pipe work, propane tanks, septic systems, sewer connections, solar water heaters, water heater replacement, and new dishwashers require a permit; clearing stoppages or repairing leaks that do not involve replacing valves, pipes, or fixtures, fixture swaps (sinks, toilets, tubs), and grade-supported water tanks up to 5,000 gallons do not.

How to apply in Gilbert

General guide, not specific to this office

What a plumbing permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a plumbing permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Development Services (Plan Review and Inspection Division)

Permitting activity in Gilbert

In 2025, Gilbert authorized permits for 1,043 new residential housing units (356 single-family, 687 in multi-family buildings), valued at $142M, down from 1,858 the year before. That works out to about 4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 257,658.

What else needs a permit in Gilbert

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsDecks are not addressed in Gilbert's published amendments to the IRC R105.2 exemption list, so permit requirements follow the unamended 2018 IRC provisions, which Gilbert's own pages do not restate.If a permit is required, valuation-based building permit fee, minimum $50
Electrical PermitPermit requiredExemptions include work by a serving utility and solar or like-for-like water heating appliance replacements installed by an Arizona licensed contractor under amended exemption 16.Individual Electrical Permit, residential: $150 (fee schedule revised 7/1/2026)
Fence PermitIt dependsGilbert's amended IRC R105.2 exempts only fences not over 3 feet high; the Town's pool barrier policy statement says internal fences over 3 feet in height require building permits and inspections.Walls/Fences fee $180 as a separate single-family permit, or $120 when combined with a single-family permit (fee schedule revised 7/1/2026)
HVAC PermitPermit requiredGilbert's amended IRC R105.2 mechanical exemption list includes a replacement-based exemption and cross-references the exemption for water heating appliance replacements by an Arizona licensed contractor.Individual Mechanical Permit, residential: $150 (fee schedule revised 7/1/2026)
Patio PermitIt dependsOne-story detached non-habitable accessory structures with a floor area that does not exceed 200 square feet are exempt from a permit. Gilbert does not publish a rule that names patios or patio covers.Valuation-based building permit fee, minimum $50
Pool PermitPermit requiredNon-permanent wading pools of rubber or plastic holding no more than 18 inches of water are excepted from the pool enclosure regulations.Swimming pool permit fee $300 for permanent in-ground pools/spas and $140 for portable above-ground pools/spas (fee schedule revised 7/1/2026)
Roof Replacement PermitIt dependsRe-roofing not requiring a structural change is exempt from permit; a re-roof that involves a structural change requires a building permit.If a permit is required, valuation-based building permit fee, minimum $50
Shed PermitIt dependsStructures less than 200 square feet do not require a permit; a permit is required at 200 square feet or larger, or if the shed has electrical or plumbing utilities or is connected to the house or another structure.Valuation-based building permit fee, minimum $50 for work valued up to $1,100
Solar PermitIt dependsSolar photovoltaic systems and solar hot water heating systems are exempt from permit when installed by an Arizona licensed contractor using equipment listed and labeled by a nationally recognized third-party testing agency.See schedule

Frequently asked questions

Do you need a plumbing permit in Gilbert?
It depends on the project. Water softeners are exempt. Replacement of a gas water heater of equal or less BTU/CFH rating or an electric water heater of equal or less amperage/voltage rating (not tankless) is exempt when installed by an Arizona licensed contractor. Other plumbing and gas piping work needs a permit. If you are unsure how that applies to your project, call the permit office at (480) 503-6700 before you start.
How much does a plumbing permit cost in Gilbert?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the permit office at (480) 503-6700.
How long does a plumbing permit take in Gilbert?
Plan review goal 3 working days per review for electric, plumbing, mechanical. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a plumbing permit in Gilbert?
You can apply through the Gilbert permit portal or contact the Development Services (Plan Review and Inspection Division) directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Gilbert?
Under Arizona law (A.R.S. 32-1121(A)(5), (A)(9), (A)(14)(a); 32-1164(A)(2), (B)): Arizona addresses owner-builders through its contractor licensing law rather than through the building code itself. A.R.S. 32-1121(A)(5) exempts property owners who build or improve structures on their own land and do the work themselves, with their own employees, or with duly licensed contractors, as long as the finished structure is for the owner's own occupancy and is not intended for sale or rent. Selling or renting within one year of completion or of the certificate of occupancy is prima facie evidence the project was really undertaken for sale or rent, which defeats the exemption, a rule that functions much like Florida's one-year restriction. The exemption does not waive the underlying permit requirement: several of the chapter's small-job licensing exemptions, including the $1,000 casual-work exemption in A.R.S. 32-1121(A)(14), expressly do not apply whenever the work requires a local building permit, so once a job needs a permit, anyone doing that work for someone else generally must hold an Arizona contractor's license regardless of dollar amount. Acting as a contractor without a license, on permit-required work or otherwise, is a class 1 misdemeanor under A.R.S. 32-1164, carrying a mandatory minimum fine of $1,000 for a first offense and $2,000 for a repeat offense. Confirm how Gilbert applies this before you apply.

From the Library

Plumbing Permit in other Arizona localities

Everything above, sourced

gilbertaz.gov documentread
gilbertaz.gov documentread
gilbertaz.gov documentread
gilbertaz.gov documentread
gilbertaz.gov documentread

How this plumbing permit page for Gilbert was verified. 5 official sources: gilbertaz.gov, gilbertaz.gov, gilbertaz.gov, gilbertaz.gov, gilbertaz.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Development Services (Plan Review and Inspection Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project