Roof Replacement Permit in Gilbert, Arizona
It depends
Sometimes, depending on the project
Only when the re-roof involves a structural change
Quick answer
Gilbert's amendments to the 2018 IBC Section 105.2 and 2018 IRC Section R105.2 add item 14, exempting re-roofing not requiring a structural change from permits. A building permit therefore applies only when a roof replacement involves a structural change. The amendments were adopted with the 2018 code family by Ordinance 2739, effective January 1, 2020.
- Typical threshold
- Re-roofing not requiring a structural change is exempt from permit; a re-roof that involves a structural change requires a building permit.
- Issued by
- Development Services (Plan Review and Inspection Division)
- Phone
- (480) 503-6700
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.
Compare roofing quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a roof replacement permit costs in Gilbert
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
If a permit is required, valuation-based building permit fee, minimum $50;
building plan review fee is 65 percent of the calculated permit fee.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Gilbert compares in Arizona
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Chandler | It depends | Re-roofing with the same type of material as the existing roof, where the replacement covering classification is equal to or greater and does not increase structural loads, is exempt provided it does not exceed two layers over an existing roof; replacing with a different material, exceeding two layers, or increasing structural load requires a building permit. |
| Gilbertthis page | It depends | Re-roofing not requiring a structural change is exempt from permit; a re-roof that involves a structural change requires a building permit. |
| Maricopa County | It depends | roof replacement or re-roof with the same type of material as the original roofing is exempt from a permit; a change of roofing material is not covered by that exemption |
| Mesa | It depends | no building permit for replacement roof coverings when the replacement covering classification is equal to or greater than the existing roofing classification; historic homes need Planning approval |
| Peoria | It depends | Re-roofing with the same type of material as the original roofing is exempt, provided not more than two layers of asphalt shingles are applied over an existing asphalt shingle roof; other roof replacements require a permit. |
| Phoenix | It depends | re-roofing with same material as original is exempt; structural changes or different materials require a permit; a city handout (Rev. 07/14) also limits the exemption to two layers of asphalt shingles over an existing asphalt shingle roof, a limit the 2024 code text does not state |
| Pima County | It depends | Re-roofing with like materials (tile, shingles, etc.) does not require a permit; structural roof work requires a permit. |
How to apply in Gilbert
General guide, not specific to this office
What a roof replacement permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a roof replacement permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Development Services (Plan Review and Inspection Division)
- 90 E. Civic Center Drive, Gilbert, AZ 85296
- Phone: (480) 503-6700
- Email: onestopshop@gilbertaz.gov
Your Roof Replacement Permit checklist for Gilbert
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: Re-roofing not requiring a structural change is exempt from permit; a re-roof that involves a structural change requires a building permit. Read the rule where we read it: gilbertaz.gov document.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Gilbert permit portal.
- Keep the office details handy. Development Services (Plan Review and Inspection Division). Phone: (480) 503-6700. Email: onestopshop@gilbertaz.gov. Address: 90 E. Civic Center Drive, Gilbert, AZ 85296.
Compiled from the official sources on this page. Last checked .
Permitting activity in Gilbert
In 2025, Gilbert authorized permits for 1,043 new residential housing units (356 single-family, 687 in multi-family buildings), valued at $142M, down from 1,858 the year before. That works out to about 4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 257,658.
What else needs a permit in Gilbert
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Decks are not addressed in Gilbert's published amendments to the IRC R105.2 exemption list, so permit requirements follow the unamended 2018 IRC provisions, which Gilbert's own pages do not restate. | If a permit is required, valuation-based building permit fee, minimum $50 |
| Electrical Permit | Permit required | Exemptions include work by a serving utility and solar or like-for-like water heating appliance replacements installed by an Arizona licensed contractor under amended exemption 16. | Individual Electrical Permit, residential: $150 (fee schedule revised 7/1/2026) |
| Fence Permit | It depends | Gilbert's amended IRC R105.2 exempts only fences not over 3 feet high; the Town's pool barrier policy statement says internal fences over 3 feet in height require building permits and inspections. | Walls/Fences fee $180 as a separate single-family permit, or $120 when combined with a single-family permit (fee schedule revised 7/1/2026) |
| HVAC Permit | Permit required | Gilbert's amended IRC R105.2 mechanical exemption list includes a replacement-based exemption and cross-references the exemption for water heating appliance replacements by an Arizona licensed contractor. | Individual Mechanical Permit, residential: $150 (fee schedule revised 7/1/2026) |
| Patio Permit | It depends | One-story detached non-habitable accessory structures with a floor area that does not exceed 200 square feet are exempt from a permit. Gilbert does not publish a rule that names patios or patio covers. | Valuation-based building permit fee, minimum $50 |
| Plumbing Permit | It depends | Water softeners are exempt. Replacement of a gas water heater of equal or less BTU/CFH rating or an electric water heater of equal or less amperage/voltage rating (not tankless) is exempt when installed by an Arizona licensed contractor. Other plumbing and gas piping work needs a permit. | Individual Plumbing Permit, residential: $150 (fee schedule revised 7/1/2026) |
| Pool Permit | Permit required | Non-permanent wading pools of rubber or plastic holding no more than 18 inches of water are excepted from the pool enclosure regulations. | Swimming pool permit fee $300 for permanent in-ground pools/spas and $140 for portable above-ground pools/spas (fee schedule revised 7/1/2026) |
| Shed Permit | It depends | Structures less than 200 square feet do not require a permit; a permit is required at 200 square feet or larger, or if the shed has electrical or plumbing utilities or is connected to the house or another structure. | Valuation-based building permit fee, minimum $50 for work valued up to $1,100 |
| Solar Permit | It depends | Solar photovoltaic systems and solar hot water heating systems are exempt from permit when installed by an Arizona licensed contractor using equipment listed and labeled by a nationally recognized third-party testing agency. | See schedule |
Frequently asked questions
- Do you need a roof replacement permit in Gilbert?
- It depends on the project. Re-roofing not requiring a structural change is exempt from permit; a re-roof that involves a structural change requires a building permit. If you are unsure how that applies to your project, call the permit office at (480) 503-6700 before you start.
- How much does a roof replacement permit cost in Gilbert?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the permit office at (480) 503-6700.
- Where do you apply for a roof replacement permit in Gilbert?
- You can apply through the Gilbert permit portal or contact the Development Services (Plan Review and Inspection Division) directly. The links are listed on this page.
- Can a homeowner pull a roof replacement permit themselves in Gilbert?
- Under Arizona law (A.R.S. 32-1121(A)(5), (A)(9), (A)(14)(a); 32-1164(A)(2), (B)): Arizona addresses owner-builders through its contractor licensing law rather than through the building code itself. A.R.S. 32-1121(A)(5) exempts property owners who build or improve structures on their own land and do the work themselves, with their own employees, or with duly licensed contractors, as long as the finished structure is for the owner's own occupancy and is not intended for sale or rent. Selling or renting within one year of completion or of the certificate of occupancy is prima facie evidence the project was really undertaken for sale or rent, which defeats the exemption, a rule that functions much like Florida's one-year restriction. The exemption does not waive the underlying permit requirement: several of the chapter's small-job licensing exemptions, including the $1,000 casual-work exemption in A.R.S. 32-1121(A)(14), expressly do not apply whenever the work requires a local building permit, so once a job needs a permit, anyone doing that work for someone else generally must hold an Arizona contractor's license regardless of dollar amount. Acting as a contractor without a license, on permit-required work or otherwise, is a class 1 misdemeanor under A.R.S. 32-1164, carrying a mandatory minimum fine of $1,000 for a first offense and $2,000 for a repeat offense. Confirm how Gilbert applies this before you apply.
From the Library
Roof Replacement Permit in other Arizona localities
Everything above, sourced
How this roof replacement permit page for Gilbert was verified. 3 official sources: gilbertaz.gov, gilbertaz.gov, gilbertaz.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Development Services (Plan Review and Inspection Division). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page