Electrical Permit in Gilbert, Arizona
Permit required
Yes, a permit is required
Electrical installations, alterations, repairs, and replacements
Quick answer
Gilbert applies the Electrical Code of the Town of Gilbert, currently the 2017 NEC adopted by Ordinance 2739 effective January 1, 2020, to the installation, alteration, repair, and replacement of electrical systems. Residential electrical permits are available through the One Stop Shop portal, and submittals require a site plan and one-line diagram per the Miscellaneous Residential Checklist. An individual residential electrical permit costs $150 with a plan review goal of 3 working days.
- Typical threshold
- Exemptions include work by a serving utility and solar or like-for-like water heating appliance replacements installed by an Arizona licensed contractor under amended exemption 16.
- Issued by
- Development Services (Plan Review and Inspection Division)
- Phone
- (480) 503-6700
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Gilbert
- Fee schedule in force
- Official scheduleRead .
Individual Electrical Permit, residential: $150 (fee schedule revised 7/1/2026).
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Gilbert compares in Arizona
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Chandler | It depends | Like-for-like repair or replacement of motors, transformers, overcurrent devices (breakers), or similar equipment on a single-family residence is exempt when the replacement is the same rating, installed in the same location, and properly labeled; new wiring, circuits, service work, or new outlets and fixtures require a permit. |
| Gilbertthis page | Permit required | Exemptions include work by a serving utility and solar or like-for-like water heating appliance replacements installed by an Arizona licensed contractor under amended exemption 16. |
| Maricopa County | Permit required | Any size |
| Mesa | Permit required | Any size |
| Peoria | It depends | Minor in-kind work is exempt, including replacement of receptacles, switches or control devices rated 60 amperes or less and in-kind replacement of circuit breakers rated 125 amperes or less other than a service disconnect; new or altered wiring, services and panels require a permit. |
| Phoenix | Permit required | Any size |
| Pima County | It depends | New electric outlet/fixture installations and photovoltaic systems or generators require a permit; wiring/devices operating under 25 volts and not exceeding 50 volt-amps, and like-for-like repair or replacement of switches, controls, overcurrent devices, fixed motors, transformers, or outlets/fixtures in the same location, do not. |
How to apply in Gilbert
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Development Services (Plan Review and Inspection Division)
- 90 E. Civic Center Drive, Gilbert, AZ 85296
- Phone: (480) 503-6700
- Email: onestopshop@gilbertaz.gov
Your Electrical Permit checklist for Gilbert
- Confirm the requirement. Yes, a permit is required. Typical threshold: Exemptions include work by a serving utility and solar or like-for-like water heating appliance replacements installed by an Arizona licensed contractor under amended exemption 16. Read the rule where we read it: gilbertaz.gov document.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Gilbert permit portal.
- Keep the office details handy. Development Services (Plan Review and Inspection Division). Phone: (480) 503-6700. Email: onestopshop@gilbertaz.gov. Address: 90 E. Civic Center Drive, Gilbert, AZ 85296.
Compiled from the official sources on this page. Last checked .
Permitting activity in Gilbert
In 2025, Gilbert authorized permits for 1,043 new residential housing units (356 single-family, 687 in multi-family buildings), valued at $142M, down from 1,858 the year before. That works out to about 4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 257,658.
What else needs a permit in Gilbert
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Decks are not addressed in Gilbert's published amendments to the IRC R105.2 exemption list, so permit requirements follow the unamended 2018 IRC provisions, which Gilbert's own pages do not restate. | If a permit is required, valuation-based building permit fee, minimum $50 |
| Fence Permit | It depends | Gilbert's amended IRC R105.2 exempts only fences not over 3 feet high; the Town's pool barrier policy statement says internal fences over 3 feet in height require building permits and inspections. | Walls/Fences fee $180 as a separate single-family permit, or $120 when combined with a single-family permit (fee schedule revised 7/1/2026) |
| HVAC Permit | Permit required | Gilbert's amended IRC R105.2 mechanical exemption list includes a replacement-based exemption and cross-references the exemption for water heating appliance replacements by an Arizona licensed contractor. | Individual Mechanical Permit, residential: $150 (fee schedule revised 7/1/2026) |
| Patio Permit | It depends | One-story detached non-habitable accessory structures with a floor area that does not exceed 200 square feet are exempt from a permit. Gilbert does not publish a rule that names patios or patio covers. | Valuation-based building permit fee, minimum $50 |
| Plumbing Permit | It depends | Water softeners are exempt. Replacement of a gas water heater of equal or less BTU/CFH rating or an electric water heater of equal or less amperage/voltage rating (not tankless) is exempt when installed by an Arizona licensed contractor. Other plumbing and gas piping work needs a permit. | Individual Plumbing Permit, residential: $150 (fee schedule revised 7/1/2026) |
| Pool Permit | Permit required | Non-permanent wading pools of rubber or plastic holding no more than 18 inches of water are excepted from the pool enclosure regulations. | Swimming pool permit fee $300 for permanent in-ground pools/spas and $140 for portable above-ground pools/spas (fee schedule revised 7/1/2026) |
| Roof Replacement Permit | It depends | Re-roofing not requiring a structural change is exempt from permit; a re-roof that involves a structural change requires a building permit. | If a permit is required, valuation-based building permit fee, minimum $50 |
| Shed Permit | It depends | Structures less than 200 square feet do not require a permit; a permit is required at 200 square feet or larger, or if the shed has electrical or plumbing utilities or is connected to the house or another structure. | Valuation-based building permit fee, minimum $50 for work valued up to $1,100 |
| Solar Permit | It depends | Solar photovoltaic systems and solar hot water heating systems are exempt from permit when installed by an Arizona licensed contractor using equipment listed and labeled by a nationally recognized third-party testing agency. | See schedule |
Frequently asked questions
- Do you need an electrical permit in Gilbert?
- Yes. Electrical installations, alterations, repairs, and replacements. If you are unsure how that applies to your project, call the permit office at (480) 503-6700 before you start.
- How much does an electrical permit cost in Gilbert?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the permit office at (480) 503-6700.
- How long does an electrical permit take in Gilbert?
- Plan review goal 3 working days per review for electric, plumbing, mechanical. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for an electrical permit in Gilbert?
- You can apply through the Gilbert permit portal or contact the Development Services (Plan Review and Inspection Division) directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Gilbert?
- Under Arizona law (A.R.S. 32-1121(A)(5), (A)(9), (A)(14)(a); 32-1164(A)(2), (B)): Arizona addresses owner-builders through its contractor licensing law rather than through the building code itself. A.R.S. 32-1121(A)(5) exempts property owners who build or improve structures on their own land and do the work themselves, with their own employees, or with duly licensed contractors, as long as the finished structure is for the owner's own occupancy and is not intended for sale or rent. Selling or renting within one year of completion or of the certificate of occupancy is prima facie evidence the project was really undertaken for sale or rent, which defeats the exemption, a rule that functions much like Florida's one-year restriction. The exemption does not waive the underlying permit requirement: several of the chapter's small-job licensing exemptions, including the $1,000 casual-work exemption in A.R.S. 32-1121(A)(14), expressly do not apply whenever the work requires a local building permit, so once a job needs a permit, anyone doing that work for someone else generally must hold an Arizona contractor's license regardless of dollar amount. Acting as a contractor without a license, on permit-required work or otherwise, is a class 1 misdemeanor under A.R.S. 32-1164, carrying a mandatory minimum fine of $1,000 for a first offense and $2,000 for a repeat offense. Confirm how Gilbert applies this before you apply.
From the Library
Electrical Permit in other Arizona localities
Everything above, sourced
How this electrical permit page for Gilbert was verified. 6 official sources: gilbertaz.gov, gilbertaz.gov, gilbertaz.gov, gilbertaz.gov, gilbertaz.gov, gilbertaz.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Development Services (Plan Review and Inspection Division). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page