Arizona / Phoenix

Electrical Permit in Phoenix, Arizona

By Mario Bailey Last checked 2026-06-18 · 2 official sources

Verified against official sources From an official source

Permit required

Quick answer

An electrical permit is required in Phoenix for new wiring, additional circuits, and service panel upgrades. Minor electrical repairs such as replacing switches, outlets, or fixtures in kind do not require a permit. Electrical work associated with pools and solar systems requires separate electrical permits. Applications are submitted through the SHAPE PHX portal.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Phoenix, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

For new electrical circuits, service upgrades, or electrical installations beyond minor repairs

What electrical permit costs in Phoenix

Electrical permits have no dedicated fee line, they are valuation-based building permits under Table A, minimum $195 base fee for valuation up to $1,000 then a rising per-$1,000 rate per the PDD Fee Schedule effective 1/20/2026.

Official fee schedule

How Phoenix compares in Arizona

JurisdictionPermit needed?Threshold
ChandlerIt dependsLike-for-like repair or replacement of motors, transformers, overcurrent devices (breakers), or similar equipment on a single-family residence is exempt when the replacement is the same rating, installed in the same location, and properly labeled; new wiring, circuits, service work, or new outlets and fixtures require a permit.
GilbertPermit requiredExemptions include work by a serving utility and solar or like-for-like water heating appliance replacements installed by an Arizona licensed contractor under amended exemption 16.
Maricopa CountyPermit requiredNot specified
MesaPermit requiredNot specified
PeoriaIt dependsMinor in-kind work is exempt, including replacement of receptacles, switches or control devices rated 60 amperes or less and in-kind replacement of circuit breakers rated 125 amperes or less other than a service disconnect; new or altered wiring, services and panels require a permit.
Phoenixthis pagePermit requiredNot specified
Pima CountyIt dependsNew electric outlet/fixture installations and photovoltaic systems or generators require a permit; wiring/devices operating under 25 volts and not exceeding 50 volt-amps, and like-for-like repair or replacement of switches, controls, overcurrent devices, fixed motors, transformers, or outlets/fixtures in the same location, do not.

How to apply in Phoenix

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. City of Phoenix Planning and Development Department sets the exact checklist for Phoenix.

Where to apply in Phoenix:

City of Phoenix Planning and Development Department

Inspections and closing out your permit

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Phoenix permit portal or by phone at 602-262-7811.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Phoenix

In 2024, Phoenix authorized permits for 8,997 new residential housing units (4,062 single-family, 4,935 in multi-family buildings), valued at $1.4B, down from14,468 the year before. That works out to about 5.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 1,708,127.

About Phoenix

Phoenix has about 642,867 housing units. The median home is valued at $381,900, against a median household income of $77,041. About 57% of homes are owner-occupied, and the typical home was built around 1984.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a electrical permit in Phoenix?
An electrical permit is required in Phoenix for new wiring, additional circuits, and service panel upgrades. Minor electrical repairs such as replacing switches, outlets, or fixtures in kind do not require a permit. Electrical work associated with pools and solar systems requires separate electrical permits. Applications are submitted through the SHAPE PHX portal. Always confirm with the City of Phoenix Planning and Development Department before starting.
How much does a electrical permit cost in Phoenix?
Electrical permits have no dedicated fee line, they are valuation-based building permits under Table A, minimum $195 base fee for valuation up to $1,000 then a rising per-$1,000 rate per the PDD Fee Schedule effective 1/20/2026. See the official fee schedule for current amounts.
Where do you apply for a electrical permit in Phoenix?
You can apply through the Phoenix permit portal or contact the City of Phoenix Planning and Development Department directly. The links are listed on this page.

From the Library

What else needs a permit in Phoenix

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsplatforms or decks not more than 30 inches above grade do not require a permit; elevated or attached decks do require a permitDeck permits have no dedicated fee line, they are valuation-based building permits unde...
Fence PermitIt dependsfences and walls over 3 feet tall require a permit; fences under 3 feet tall are exemptResidential fences carry a $98 minimum permit fee for project valuations of $1 to $1,00...
HVAC PermitPermit requiredNot specifiedHVAC (mechanical) permits have no dedicated fee line, they are valuation-based building...
Patio PermitPermit requiredNot specifiedPatio permits have no dedicated fee line, they are valuation-based building permits und...
Plumbing PermitPermit requiredNot specifiedPlumbing permits have no dedicated fee line (water heaters get the $98 minimum tier), g...
Pool PermitPermit requiredNot specifiedResidential pool and spa permits carry a minimum $234 permit fee plus a $30 aquatics pr...
Roof Replacement PermitIt dependsre-roofing with same material as original is exempt; more than two layers of asphalt shingles over existing asphalt or structural changes require a permitRoof replacement permits have no dedicated fee line, they are valuation-based building...
Shed PermitIt dependsdetached structures without utilities at or under 200 sq ft are exempt; structures over 200 sq ft or with utilities require a permitShed permits have no dedicated fee line, they are valuation-based building permits unde...
Solar PermitPermit requiredNot specifiedResidential solar photovoltaic permits use fixed-fee options from $780 with plan review...

Electrical Permit in other Arizona localities

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with City of Phoenix Planning and Development Department. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page

Compare Electrical Permit requirements across Arizona localities