Electrical Permit in Tucson, Arizona
Permit required
Yes, a permit is required
Before adding wired lights, ceiling fans or outlets, changing or upgrading a panel, or reconnecting power after a 6-month shutoff.
Quick answer
Tucson requires a City Trade permit to install new hardwired lighting, ceiling fans or outlets, for service increases and panel replacement or repair, and to reconnect electric service that has been off for 6 consecutive months. Like-for-like replacement of a switch, outlet, breaker or fuse in the same location needs no permit, and low-voltage work under 25 volts and 50 volt-amps is exempt. A main breaker replacement may be exempt under the City's Policy 2016-01.
- Issued by
- City of Tucson Planning and Development Services Department (PDSD)
- Phone
- (520) 791-5550
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Tucson
- Fee schedule in force
- Official scheduleRead .
- "4-02.9.1 Trade Permits": $150.00, listed items include "C. Replace Electric Service Panel (like for like; up to 400 amps)", "D. Upgrade/Modify Electric Service Panel (up to 400 amps)" and "E. New Electrical Circuit (max two 20 amp branches)";
- 2 or more items: $150.00 for first item + $50.00 for each additional item.
- Line-item numbers and names are from the schedule, with its U+2010 hyphens and en dashes typed as plain hyphens.
- City of Tucson FY27 Planning and Permitting Fee Schedule, adopted by Mayor and Council May 19, 2026, effective July 1, 2026.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Tucson compares in Arizona
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Chandler | It depends | Like-for-like repair or replacement of motors, transformers, overcurrent devices (breakers), or similar equipment on a single-family residence is exempt when the replacement is the same rating, installed in the same location, and properly labeled; new wiring, circuits, service work, or new outlets and fixtures require a permit. |
| Gilbert | Permit required | Exemptions include work by a serving utility and solar or like-for-like water heating appliance replacements installed by an Arizona licensed contractor under amended exemption 16. |
| Maricopa County | Permit required | Any size |
| Mesa | Permit required | Any size |
| Peoria | It depends | Minor in-kind work is exempt, including replacement of receptacles, switches or control devices rated 60 amperes or less and in-kind replacement of circuit breakers rated 125 amperes or less other than a service disconnect; new or altered wiring, services and panels require a permit. |
| Phoenix | Permit required | Any size |
| Tucsonthis page | Permit required | Any size |
How to apply in Tucson
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Tucson Planning and Development Services Department (PDSD)
- Tucson Development Center, 201 N. Stone Avenue, 1st Floor, Tucson, AZ 85701
- Phone: (520) 791-5550
- Email: pdsdinquiries@tucsonaz.gov
Your Electrical Permit checklist for Tucson
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: tucsonaz.gov: Residential Permits.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Tucson permit portal.
- Keep the office details handy. City of Tucson Planning and Development Services Department (PDSD). Phone: (520) 791-5550. Email: pdsdinquiries@tucsonaz.gov. Address: Tucson Development Center, 201 N. Stone Avenue, 1st Floor, Tucson, AZ 85701.
Compiled from the official sources on this page. Last checked .
Permitting activity in Tucson
In 2025, Tucson authorized permits for 1,505 new residential housing units (805 single-family, 700 in multi-family buildings), valued at $309M, up from 1,505 the year before. That works out to about 2.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 553,571.
What else needs a permit in Tucson
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | finish-only work and same-location toilet swaps versus work on plumbing piping, wiring or structure | Fixture and piping work is a "4-02.9.1 Trade Permits" item at $150.00 (listed item "H. Plumbing Fixture Repair/Replace"); the schedule has the rest |
| Deck Permit | It depends | height of the deck above ground or floor level | See schedule |
| EV Charger Permit | Permit required | Any size | Electrical work is a "4-02.9.1 Trade Permits" item at $150.00 |
| Fence Permit | Permit required | Any size | "4-02.10.12 Wood and Metal Fences": $28.08 + $5.62 per 100 linear feet + plan review fee at standard hourly rate, minimum ½ hour |
| HVAC Permit | Permit required | Any size | "4-02.9.1 Trade Permits": $150.00, listed item "F. Air Conditioner/Heater Repair/Replace (max 2)"; the schedule has the rest |
| Patio Permit | It depends | area of uncovered paving on private property; any patio cover or enclosure always requires a permit | A patio cover or enclosure as a Residential Addition/Alteration permit priced by valuation |
| Plumbing Permit | Permit required | Any size | "4-02.9.1 Trade Permits": $150.00, listed items include "H. Plumbing Fixture Repair/Replace"; the schedule has the rest |
| Pool Permit | It depends | above-ground pools, spas and prefabricated ponds; also triggered above 5,000 gallons; every in-ground pool, spa, hot tub or pond requires a permit | "4-02.10.7 Private Swimming Pool": $730.28 + plan review fee at standard hourly rate, minimum 1 hour |
| Roof Replacement Permit | It depends | replacement with the same type of roofing material, no structural work, outside a Historic Preservation Zone | Structural roof work is filed as a Residential Addition/Alteration permit priced by valuation |
| Shed Permit | Permit required | Any size | See schedule |
| Solar Permit | Permit required | Any size | "4-02.9.3 Solar Permits - Photovoltaic Electrical Systems - 1 to 30 PV panels": $122.46 (includes inverter and panel racking) |
| Water Heater Permit | Permit required | Any size | "4-02.9.1 Trade Permits": $150.00; the schedule has the rest |
Frequently asked questions
- Do you need an electrical permit in Tucson?
- Yes, before adding wired lights, ceiling fans or outlets, changing or upgrading a panel, or reconnecting power after a 6-month shutoff. If you are unsure how that applies to your project, call the permit office at (520) 791-5550 before you start.
- How much does an electrical permit cost in Tucson?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 23 Oct 2026. For the figure on your own project, call the permit office at (520) 791-5550.
- How long does an electrical permit take in Tucson?
- Express Lane, same-day for residential electrical projects and electrical reconnections (Permit Review Lanes). Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for an electrical permit in Tucson?
- You can apply through the Tucson permit portal or contact the City of Tucson Planning and Development Services Department (PDSD) directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Tucson?
- Under Arizona law (A.R.S. 32-1121(A)(5), (A)(9), (A)(14)(a); 32-1164(A)(2), (B)): Arizona addresses owner-builders through its contractor licensing law rather than through the building code itself. A.R.S. 32-1121(A)(5) exempts property owners who build or improve structures on their own land and do the work themselves, with their own employees, or with duly licensed contractors, as long as the finished structure is for the owner's own occupancy and is not intended for sale or rent. Selling or renting within one year of completion or of the certificate of occupancy is prima facie evidence the project was really undertaken for sale or rent, which defeats the exemption, a rule that functions much like Florida's one-year restriction. The exemption does not waive the underlying permit requirement: several of the chapter's small-job licensing exemptions, including the $1,000 casual-work exemption in A.R.S. 32-1121(A)(14), expressly do not apply whenever the work requires a local building permit, so once a job needs a permit, anyone doing that work for someone else generally must hold an Arizona contractor's license regardless of dollar amount. Acting as a contractor without a license, on permit-required work or otherwise, is a class 1 misdemeanor under A.R.S. 32-1164, carrying a mandatory minimum fine of $1,000 for a first offense and $2,000 for a repeat offense. Confirm how Tucson applies this before you apply.
From the Library
Electrical Permit in other Arizona localities
Everything above, sourced
How this electrical permit page for Tucson was verified. 2 official sources: tucsonaz.gov, tucsonaz.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Tucson Planning and Development Services Department (PDSD). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page