Patio Permit in Phoenix, Arizona
By Mario Bailey Last checked 2026-06-18 · 2 official sources
Verified against official sources From an official sourcePermit required
Quick answer
A permit and plan review are required for all residential patio covers in Phoenix, whether attached or freestanding. Phoenix publishes a Residential Patio Covers Guideline document with construction details. Applications are submitted through the SHAPE PHX portal. Homeowners may prepare their own drawings if accurate and complete.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Phoenix, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
Before constructing any attached patio cover or shade structure on a residential property
What patio permit costs in Phoenix
Patio permits have no dedicated fee line, they are valuation-based building permits under Table A, minimum $195 base fee for valuation up to $1,000 then a rising per-$1,000 rate per the PDD Fee Schedule effective 1/20/2026.
How Phoenix compares in Arizona
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Chandler | It depends | An open, unattached patio slab no more than 200 sq ft in area and not more than 30 inches above grade falls under the same code exemption as an unattached deck and does not require a permit; a patio cover (roofed structure) requires a permit regardless of size, per the city's Patio Covers guidance. |
| Gilbert | It depends | Only one-story detached non-habitable accessory structures up to 200 square feet are exempt from permit; attached patio covers and larger structures require a building permit. |
| Maricopa County | It depends | attached patio cover or patio enclosure connected to the house requires a building permit; ground-level open patio slab does not |
| Mesa | It depends | open ground-level patio slabs do not require a permit; covered patio structures or enclosed patio rooms require a permit |
| Peoria | Permit required | Not specified |
| Phoenixthis page | Permit required | Not specified |
| Pima County | It depends | An open, ground-level patio slab counts as non-structural flat work not more than 30 inches above adjacent grade and does not require a permit; enclosing a porch or patio (adding walls, screens, or a roof enclosure) requires a permit. |
How to apply in Phoenix
Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.
What most patio permit applications include:
- Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
- A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
- Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
- For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
- By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).
General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. City of Phoenix Planning and Development Department sets the exact checklist for Phoenix.
Where to apply in Phoenix:
City of Phoenix Planning and Development Department
- 200 West Washington Street, Second Floor, Phoenix, AZ 85003
- Phone: 602-262-7811
- Email: residential.building@phoenix.gov
Inspections and closing out your permit
A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
- A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
- A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
- A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
- An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
- Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Phoenix permit portal or by phone at 602-262-7811.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Patio Permit checklist for Phoenix
- Confirm the requirement. Yes, a permit is required. Usually needed: Before constructing any attached patio cover or shade structure on a residential property.
- Budget the fee. Patio permits have no dedicated fee line, they are valuation-based building permits under Table A, minimum $195 base fee for valuation up to $1,000 then a rising per-$1,000 rate per the PDD Fee Schedule effective 1/20/2026. Official fee schedule.
- Apply. Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement. Start at the Phoenix permit portal.
- Keep the office details handy. City of Phoenix Planning and Development Department. Phone: 602-262-7811. Address: 200 West Washington Street, Second Floor, Phoenix, AZ 85003.
- Plan for inspections. A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
Compiled from the official sources on this page. Last checked 2026-06-18.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Phoenix
In 2024, Phoenix authorized permits for 8,997 new residential housing units (4,062 single-family, 4,935 in multi-family buildings), valued at $1.4B, down from14,468 the year before. That works out to about 5.3 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 1,708,127.
About Phoenix
Phoenix has about 642,867 housing units. The median home is valued at $381,900, against a median household income of $77,041. About 57% of homes are owner-occupied, and the typical home was built around 1984.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a patio permit in Phoenix?
- A permit and plan review are required for all residential patio covers in Phoenix, whether attached or freestanding. Phoenix publishes a Residential Patio Covers Guideline document with construction details. Applications are submitted through the SHAPE PHX portal. Homeowners may prepare their own drawings if accurate and complete. Always confirm with the City of Phoenix Planning and Development Department before starting.
- How much does a patio permit cost in Phoenix?
- Patio permits have no dedicated fee line, they are valuation-based building permits under Table A, minimum $195 base fee for valuation up to $1,000 then a rising per-$1,000 rate per the PDD Fee Schedule effective 1/20/2026. See the official fee schedule for current amounts.
- Where do you apply for a patio permit in Phoenix?
- You can apply through the Phoenix permit portal or contact the City of Phoenix Planning and Development Department directly. The links are listed on this page.
From the Library
What else needs a permit in Phoenix
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | platforms or decks not more than 30 inches above grade do not require a permit; elevated or attached decks do require a permit | Deck permits have no dedicated fee line, they are valuation-based building permits unde... |
| Electrical Permit | Permit required | Not specified | Electrical permits have no dedicated fee line, they are valuation-based building permit... |
| Fence Permit | It depends | fences and walls over 3 feet tall require a permit; fences under 3 feet tall are exempt | Residential fences carry a $98 minimum permit fee for project valuations of $1 to $1,00... |
| HVAC Permit | Permit required | Not specified | HVAC (mechanical) permits have no dedicated fee line, they are valuation-based building... |
| Plumbing Permit | Permit required | Not specified | Plumbing permits have no dedicated fee line (water heaters get the $98 minimum tier), g... |
| Pool Permit | Permit required | Not specified | Residential pool and spa permits carry a minimum $234 permit fee plus a $30 aquatics pr... |
| Roof Replacement Permit | It depends | re-roofing with same material as original is exempt; more than two layers of asphalt shingles over existing asphalt or structural changes require a permit | Roof replacement permits have no dedicated fee line, they are valuation-based building... |
| Shed Permit | It depends | detached structures without utilities at or under 200 sq ft are exempt; structures over 200 sq ft or with utilities require a permit | Shed permits have no dedicated fee line, they are valuation-based building permits unde... |
| Solar Permit | Permit required | Not specified | Residential solar photovoltaic permits use fixed-fee options from $780 with plan review... |
Patio Permit in other Arizona localities
Official sources
Verified by a person against the sources above on 2026-06-18, not confirmed with City of Phoenix Planning and Development Department. Rules change; confirm before you build. How we verify.
Last checked: 2026-06-18Report an error on this page
Compare
Patio Permit across Arizona