Permit records

Gilbert permit search

Gilbert permit records are public. The jurisdiction publishes them through an online record search, and searching does not require an account.

By Mario Bailey Last checked · 10 official sources

Project types verified
10
in Gilbert
Search verified
23 Aug 2026
we opened it ourselves

How to search

  1. Open the Gilbert permit record search.
  2. Enter an address.
  3. Open a result to see the permit's status, inspection history, and issue date.
The Gilbert permit portal search screen
The Gilbert permit portal as we captured it on .

If the permit does not turn up

Older permits are often missing from online records, and a permit filed under a contractor's name will not surface in an address search that expects the owner. Development Services (Plan Review and Inspection Division) can check the paper file.

What needs a permit in Gilbert

Every project type we have verified in Gilbert, with the rule, the threshold, and the fee that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsDecks are not addressed in Gilbert's published amendments to the IRC R105.2 exemption list, so permit requirements follow the unamended 2018 IRC provisions, which Gilbert's own pages do not restate.If a permit is required, valuation-based building permit fee, minimum $50
Electrical PermitPermit requiredExemptions include work by a serving utility and solar or like-for-like water heating appliance replacements installed by an Arizona licensed contractor under amended exemption 16.Individual Electrical Permit, residential: $150 (fee schedule revised 7/1/2026).
Fence PermitIt dependsGilbert's amended IRC R105.2 exempts only fences not over 3 feet high; the Town's pool barrier policy statement says internal fences over 3 feet in height require building permits and inspections.Walls/Fences fee $180 as a separate single-family permit, or $120 when combined with a...
HVAC PermitPermit requiredGilbert's amended IRC R105.2 mechanical exemption list includes a replacement-based exemption and cross-references the exemption for water heating appliance replacements by an Arizona licensed contractor.Individual Mechanical Permit, residential: $150 (fee schedule revised 7/1/2026).
Patio PermitIt dependsOnly one-story detached non-habitable accessory structures up to 200 square feet are exempt from permit; attached patio covers and larger structures require a building permit.Valuation-based building permit fee, minimum $50
Plumbing PermitPermit requiredWater softeners and like-for-like replacements of gas or electric water heating appliances (not tankless) installed by an Arizona licensed contractor are exempt from permit.Individual Plumbing Permit, residential: $150 (fee schedule revised 7/1/2026).
Pool PermitPermit requiredNon-permanent wading pools of rubber or plastic holding no more than 18 inches of water are excepted from the pool enclosure regulations.Swimming pool permit fee $300 for permanent in-ground pools/spas and $140 for portable...
Roof Replacement PermitIt dependsRe-roofing not requiring a structural change is exempt from permit; a re-roof that involves a structural change requires a building permit.If a permit is required, valuation-based building permit fee, minimum $50
Shed PermitIt dependsStructures less than 200 square feet do not require a permit; a permit is required at 200 square feet or larger, or if the shed has electrical or plumbing utilities or is connected to the house or another structure.Valuation-based building permit fee, minimum $50 for work valued up to $1,100
Solar PermitIt dependsSolar photovoltaic systems and solar hot water heating systems are exempt from permit when installed by an Arizona licensed contractor using equipment listed and labeled by a nationally recognized third-party testing agency.No Town permit fee when the licensed-contractor exemption applies

Everything we have verified about permits in Gilbert