Minnesota / Minneapolis

Patio Permit in Minneapolis, Minnesota

By Mario Bailey Last checked 2026-06-18 · 2 official sources

Verified against official sources Based on building code

It depends

Quick answer

Freestanding platforms less than 30 inches above grade that lack frost footings and do not serve the main entrance are generally exempt from a permit in Minneapolis. This threshold is drawn from the deck/platform exemption on the city's Work Exempt from Permit page; Minneapolis does not publish a separate patio-specific rule. Contact CPED at 612-673-3000 to confirm for your project.

Typical threshold: freestanding platforms less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; others may require a permit.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Minneapolis, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

When installing a patio or platform more than 30 inches above grade or with footings

What patio permit costs in Minneapolis

No permit fee; patios do not require a building permit in Minneapolis per the city's fences and site features handout.

Official fee schedule

How to apply in Minneapolis

Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.

What most patio permit applications include:

  • Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
  • A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
  • Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
  • For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
  • By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).

General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. City of Minneapolis Community Planning and Economic Development sets the exact checklist for Minneapolis.

Where to apply in Minneapolis:

City of Minneapolis Community Planning and Economic Development

Inspections and closing out your permit

A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.

  1. A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
  2. A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
  3. A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
  4. An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
  5. Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Minneapolis permit portal or by phone at 612-673-3000.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Minneapolis

In 2024, Minneapolis authorized permits for 452 new residential housing units (65 single-family, 387 in multi-family buildings), valued at $151M, down from1,528 the year before. That works out to about 1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 433,111.

About Minneapolis

Minneapolis has about 203,217 housing units. The median home is valued at $345,600, against a median household income of $80,269. About 48% of homes are owner-occupied, and the typical home was built around 1950.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a patio permit in Minneapolis?
Freestanding platforms less than 30 inches above grade that lack frost footings and do not serve the main entrance are generally exempt from a permit in Minneapolis. This threshold is drawn from the deck/platform exemption on the city's Work Exempt from Permit page; Minneapolis does not publish a separate patio-specific rule. Contact CPED at 612-673-3000 to confirm for your project. Freestanding platforms less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; others may require a permit. Always confirm with the office before starting.
How much does a patio permit cost in Minneapolis?
No permit fee; patios do not require a building permit in Minneapolis per the city's fences and site features handout. See the official fee schedule for current amounts.
Where do you apply for a patio permit in Minneapolis?
You can apply through the Minneapolis permit portal or contact the City of Minneapolis Community Planning and Economic Development directly. The links are listed on this page.

From the Library

What else needs a permit in Minneapolis

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsfreestanding decks less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; all other decks require a permitBilled as a standard building permit valued by cost of work once the deck exceeds 30 in...
Electrical PermitPermit requiredNot specifiedNo city fee;
Fence PermitIt dependsfences no more than 7 feet high are exempt from a permit; fences over 7 feet require a building permitNo fee for fences 7 feet or under since no permit is required;
HVAC PermitPermit requiredNot specifiedExisting residential mechanical fee is tiered by scope: Level 1 misc HVAC work with no...
Plumbing PermitPermit requiredNot specifiedMinimum plumbing permit fee is $85.20 including the $1 state surcharge, with per-item f...
Pool PermitPermit requiredNot specifiedNo separate pool schedule;
Roof Replacement PermitPermit requiredNot specifiedBilled as a standard building permit valued by cost of work, minimum $84.20 plus 65% pl...
Shed PermitIt dependsone-story tool and storage sheds under 200 sq ft are exempt from a permit; sheds 200 sq ft or larger or more than one story require a permitOne-story sheds under 200 sq ft need no permit or fee;
Solar PermitPermit requiredNot specifiedThe building permit portion uses the valuation-based schedule, minimum $84.20 plus 65%...

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with City of Minneapolis Community Planning and Economic Development. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page

Compare Patio Permit requirements across Minnesota localities