Minnesota / Minneapolis

Deck Permit in Minneapolis, Minnesota

By Mario Bailey Last checked 2026-06-18 · 2 official sources

Verified against official sources Confirmed on official page

It depends

Quick answer

Freestanding decks and platforms less than 30 inches above grade that lack frost footings and do not serve the main entrance are exempt from a building permit in Minneapolis. All other residential decks require a building permit. Contact CPED at 612-673-3000 for guidance.

Typical threshold: freestanding decks less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; all other decks require a permit.

30 in above grade
Threshold illustrated: 30 in above grade. Whether Minneapolis requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-06-18.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Minneapolis, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

When building an attached deck or any deck more than 30 inches above grade

What deck permit costs in Minneapolis

Billed as a standard building permit valued by cost of work once the deck exceeds 30 inches above grade or attaches to the structure, minimum $84.20 plus a 65% plan review fee and 0.05% state surcharge per the city building permit fee schedule.

Official fee schedule

How to apply in Minneapolis

A residential deck permit application is a set of construction documents that show what will be built and prove it meets the IRC deck provisions. In practice that means a scaled site plan locating the deck and its setbacks, plus deck plans and structural details covering the footings, posts, beams, joists, ledger, guards, and stairs.

What most deck permit applications include:

  • A permit application identifying the work, the deck's size (square footage), and whether electrical work such as lights or receptacles is included, submitted for plan review before construction begins (IRC R106).
  • A scaled site plan (for example 1/4 inch to 1 foot) showing the new deck's location relative to the house, its overall length and width, and dimensioned distances from the deck to all property lines and other structures so required setbacks can be verified (IRC R106.1.1).
  • A deck plan drawn to scale showing overall dimensions and the framing layout: joist size, spacing, span, and species; beam size and span; post size and height; and footing or pier size and depth (IRC R507.4 posts, R507.5 beams, R507.6 joists, R507.3 footings).
  • A section or side elevation with connection details showing the ledger attachment to the house band joist with flashing, the fastener or bolt schedule, joist hangers, post-to-beam and post-to-footing connections, and the required lateral load connection (IRC R507.9 ledger connection, R507.9.2 lateral connection, R507.2.4 flashing).
  • Footing sizing derived from tributary area, the soil bearing value, and design loads per IRC Table R507.3.1, with footings shown bearing on undisturbed soil at the frost depth required by the jurisdiction (IRC R507.3).
  • Details for the guards required where the walking surface is more than 30 inches above grade, and for the stairs and handrails, showing guard height and opening limits, stair riser and tread dimensions, and handrail location (IRC R312 guards, R311.7 stairs and handrails).
  • For designs that fall outside the prescriptive R507 tables (for example multi-story or stacked decks, or a ledger attached to a cantilever), engineered and stamped structural plans are submitted in place of the prescriptive details (IRC R507.1 and R301).

General submittal guidance from IRC R106.1.1 (construction documents) and IRC R507 (exterior decks), 2021 IRC. Source. City of Minneapolis Community Planning and Economic Development sets the exact checklist for Minneapolis.

Where to apply in Minneapolis:

City of Minneapolis Community Planning and Economic Development

Inspections and closing out your permit

Deck work is inspected in sequence as it is built: the footings before concrete is placed, the framing before the decking boards go down, and a final inspection once the deck is complete. Each stage checks the items that would be hidden or unsafe if missed.

  1. Footing or pier inspection: after the holes are dug and any forms or reinforcing are set but before concrete is placed, the inspector checks footing depth and diameter, a flat undisturbed bearing surface, and that the holes are free of water (IRC R109.1.1 foundation inspection; R507.3 footings).
  2. Framing inspection: after the deck is framed but before the decking conceals it, the inspector verifies the ledger attachment and its flashing, the fastener and bolt schedule, joist hangers and metal connectors, post-to-beam and post-to-footing connections, and the lateral load connection; call it before decking is installed (IRC R109.1.4 frame inspection; R507.9 ledger and flashing).
  3. Final inspection: after the deck is complete and before it is used, the inspector confirms guard height and opening limits (a 4 inch sphere must not pass, 4 3/8 inch at stairs), stair riser and tread dimensions, handrail height and graspability where there are 4 or more risers, stair landings, and required stair lighting (IRC R109.1.6 final inspection; R312 guards, R311.7 stairs and handrails).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Minneapolis permit portal or by phone at 612-673-3000.

Inspection sequence from IRC R109 (inspections: R109.1.1 footing before concrete, R109.1.4 frame, R109.1.6 final), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Minneapolis

In 2024, Minneapolis authorized permits for 452 new residential housing units (65 single-family, 387 in multi-family buildings), valued at $151M, down from1,528 the year before. That works out to about 1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 433,111.

About Minneapolis

Minneapolis has about 203,217 housing units. The median home is valued at $345,600, against a median household income of $80,269. About 48% of homes are owner-occupied, and the typical home was built around 1950.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a deck permit in Minneapolis?
Freestanding decks and platforms less than 30 inches above grade that lack frost footings and do not serve the main entrance are exempt from a building permit in Minneapolis. All other residential decks require a building permit. Contact CPED at 612-673-3000 for guidance. Freestanding decks less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; all other decks require a permit. Always confirm with the office before starting.
How much does a deck permit cost in Minneapolis?
Billed as a standard building permit valued by cost of work once the deck exceeds 30 inches above grade or attaches to the structure, minimum $84.20 plus a 65% plan review fee and 0.05% state surcharge per the city building permit fee schedule. See the official fee schedule for current amounts.
Where do you apply for a deck permit in Minneapolis?
You can apply through the Minneapolis permit portal or contact the City of Minneapolis Community Planning and Economic Development directly. The links are listed on this page.

From the Library

What else needs a permit in Minneapolis

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Electrical PermitPermit requiredNot specifiedNo city fee;
Fence PermitIt dependsfences no more than 7 feet high are exempt from a permit; fences over 7 feet require a building permitNo fee for fences 7 feet or under since no permit is required;
HVAC PermitPermit requiredNot specifiedExisting residential mechanical fee is tiered by scope: Level 1 misc HVAC work with no...
Patio PermitIt dependsfreestanding platforms less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; others may require a permitNo permit fee;
Plumbing PermitPermit requiredNot specifiedMinimum plumbing permit fee is $85.20 including the $1 state surcharge, with per-item f...
Pool PermitPermit requiredNot specifiedNo separate pool schedule;
Roof Replacement PermitPermit requiredNot specifiedBilled as a standard building permit valued by cost of work, minimum $84.20 plus 65% pl...
Shed PermitIt dependsone-story tool and storage sheds under 200 sq ft are exempt from a permit; sheds 200 sq ft or larger or more than one story require a permitOne-story sheds under 200 sq ft need no permit or fee;
Solar PermitPermit requiredNot specifiedThe building permit portion uses the valuation-based schedule, minimum $84.20 plus 65%...

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with City of Minneapolis Community Planning and Economic Development. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page

Compare Deck Permit requirements across Minnesota localities