Shed Permit in Minneapolis, Minnesota
By Mario Bailey Last checked 2026-06-18 · 2 official sources
Verified against official sources Confirmed on official pageIt depends
Quick answer
One-story tool and storage sheds under 200 square feet are exempt from a building permit in Minneapolis. Sheds at or above 200 square feet or more than one story require a building permit. Contact CPED at 612-673-3000 for project-specific requirements.
Typical threshold: one-story tool and storage sheds under 200 sq ft are exempt from a permit; sheds 200 sq ft or larger or more than one story require a permit.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Minneapolis, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
When building a shed that is 200 sq ft or larger or more than one story
What shed permit costs in Minneapolis
One-story sheds under 200 sq ft need no permit or fee; larger sheds bill as a standard building permit valued by cost of work, minimum $84.20 plus 65% plan review and 0.05% state surcharge.
How to apply in Minneapolis
A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of Minneapolis Community Planning and Economic Development sets the exact checklist for Minneapolis.
Where to apply in Minneapolis:
City of Minneapolis Community Planning and Economic Development
- 505 Fourth Ave. S., Room 320, Minneapolis, MN 55415
- Phone: 612-673-3000
- Email: Development@minneapolismn.gov
Inspections and closing out your permit
A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Minneapolis permit portal or by phone at 612-673-3000.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for Minneapolis
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: one-story tool and storage sheds under 200 sq ft are exempt from a permit; sheds 200 sq ft or larger or more than one story require a permit. Usually needed: When building a shed that is 200 sq ft or larger or more than one story.
- Budget the fee. One-story sheds under 200 sq ft need no permit or fee; larger sheds bill as a standard building permit valued by cost of work, minimum $84.20 plus 65% plan review and 0.05% state surcharge. Official fee schedule.
- Apply. A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the Minneapolis permit portal.
- Keep the office details handy. City of Minneapolis Community Planning and Economic Development. Phone: 612-673-3000. Address: 505 Fourth Ave. S., Room 320, Minneapolis, MN 55415.
- Plan for inspections. A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked 2026-06-18.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Minneapolis
In 2024, Minneapolis authorized permits for 452 new residential housing units (65 single-family, 387 in multi-family buildings), valued at $151M, down from1,528 the year before. That works out to about 1 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 433,111.
About Minneapolis
Minneapolis has about 203,217 housing units. The median home is valued at $345,600, against a median household income of $80,269. About 48% of homes are owner-occupied, and the typical home was built around 1950.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a shed permit in Minneapolis?
- One-story tool and storage sheds under 200 square feet are exempt from a building permit in Minneapolis. Sheds at or above 200 square feet or more than one story require a building permit. Contact CPED at 612-673-3000 for project-specific requirements. One-story tool and storage sheds under 200 sq ft are exempt from a permit; sheds 200 sq ft or larger or more than one story require a permit. Always confirm with the office before starting.
- How much does a shed permit cost in Minneapolis?
- One-story sheds under 200 sq ft need no permit or fee; larger sheds bill as a standard building permit valued by cost of work, minimum $84.20 plus 65% plan review and 0.05% state surcharge. See the official fee schedule for current amounts.
- Where do you apply for a shed permit in Minneapolis?
- You can apply through the Minneapolis permit portal or contact the City of Minneapolis Community Planning and Economic Development directly. The links are listed on this page.
From the Library
What else needs a permit in Minneapolis
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | freestanding decks less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; all other decks require a permit | Billed as a standard building permit valued by cost of work once the deck exceeds 30 in... |
| Electrical Permit | Permit required | Not specified | No city fee; |
| Fence Permit | It depends | fences no more than 7 feet high are exempt from a permit; fences over 7 feet require a building permit | No fee for fences 7 feet or under since no permit is required; |
| HVAC Permit | Permit required | Not specified | Existing residential mechanical fee is tiered by scope: Level 1 misc HVAC work with no... |
| Patio Permit | It depends | freestanding platforms less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; others may require a permit | No permit fee; |
| Plumbing Permit | Permit required | Not specified | Minimum plumbing permit fee is $85.20 including the $1 state surcharge, with per-item f... |
| Pool Permit | Permit required | Not specified | No separate pool schedule; |
| Roof Replacement Permit | Permit required | Not specified | Billed as a standard building permit valued by cost of work, minimum $84.20 plus 65% pl... |
| Solar Permit | Permit required | Not specified | The building permit portion uses the valuation-based schedule, minimum $84.20 plus 65%... |
Official sources
- https://www.minneapolismn.gov/business-services/licenses-permits-inspections/construction-permits/exempt-from-permit/
- https://www.minneapolismn.gov/business-services/licenses-permits-inspections/construction-permits/building-requirements/
- https://calhouncounty.sc.gov/sites/calhouncounty/files/Documents/Calhoun%20County/Departments/Building%20and%20Planning/2018IRC/2018%20IRC%20Building%20Guide_Accessory%20Structure.pdf
- https://www.botetourtva.gov/DocumentCenter/View/739/Accessory-Structure-Guide-pdf
Verified by a person against the sources above on 2026-06-18, not confirmed with City of Minneapolis Community Planning and Economic Development. Rules change; confirm before you build. How we verify.
Last checked: 2026-06-18Report an error on this page
Compare Shed Permit requirements across Minnesota localities
Permit office
City of Minneapolis Community Planning and Economic Development
612-673-3000Permit portalCompare
Shed Permit across Minnesota