Quick answer

A plumbing permit is required in Minneapolis for replacing or installing sinks, showers, tubs, water piping, water heaters, and gas appliances. Reconnecting water supplies to replacement appliances, replacing faucets, repairing pipes, and installing garbage disposals in one- and two-family dwellings are exempt from a plumbing permit.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Minneapolis, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

For replacing or installing fixtures, water piping, water heaters, or gas appliances

What plumbing permit costs in Minneapolis

Minimum plumbing permit fee is $85.20 including the $1 state surcharge, with per-item fees of $41.40 each for fixtures and piping units, per the city plumbing fee schedule.

Official fee schedule

How to apply in Minneapolis

You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.

What most plumbing permit applications include:

  • A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
  • The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
  • Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
  • Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
  • Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. City of Minneapolis Community Planning and Economic Development sets the exact checklist for Minneapolis.

Where to apply in Minneapolis:

City of Minneapolis Community Planning and Economic Development

Inspections and closing out your permit

Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.

  1. Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
  2. Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
  3. Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
  4. The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
  5. The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
  6. At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
  7. Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Minneapolis permit portal or by phone at 612-673-3000.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Minneapolis

In 2024, Minneapolis authorized permits for 452 new residential housing units (65 single-family, 387 in multi-family buildings), valued at $151M, down from1,528 the year before. That works out to about 1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 433,111.

About Minneapolis

Minneapolis has about 203,217 housing units. The median home is valued at $345,600, against a median household income of $80,269. About 48% of homes are owner-occupied, and the typical home was built around 1950.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a plumbing permit in Minneapolis?
A plumbing permit is required in Minneapolis for replacing or installing sinks, showers, tubs, water piping, water heaters, and gas appliances. Reconnecting water supplies to replacement appliances, replacing faucets, repairing pipes, and installing garbage disposals in one- and two-family dwellings are exempt from a plumbing permit. Always confirm with the City of Minneapolis Community Planning and Economic Development before starting.
How much does a plumbing permit cost in Minneapolis?
Minimum plumbing permit fee is $85.20 including the $1 state surcharge, with per-item fees of $41.40 each for fixtures and piping units, per the city plumbing fee schedule. See the official fee schedule for current amounts.
Where do you apply for a plumbing permit in Minneapolis?
You can apply through the Minneapolis permit portal or contact the City of Minneapolis Community Planning and Economic Development directly. The links are listed on this page.

From the Library

What else needs a permit in Minneapolis

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsfreestanding decks less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; all other decks require a permitBilled as a standard building permit valued by cost of work once the deck exceeds 30 in...
Electrical PermitPermit requiredNot specifiedNo city fee;
Fence PermitIt dependsfences no more than 7 feet high are exempt from a permit; fences over 7 feet require a building permitNo fee for fences 7 feet or under since no permit is required;
HVAC PermitPermit requiredNot specifiedExisting residential mechanical fee is tiered by scope: Level 1 misc HVAC work with no...
Patio PermitIt dependsfreestanding platforms less than 30 in above grade that are not attached with frost footings and do not serve the main entrance are exempt; others may require a permitNo permit fee;
Pool PermitPermit requiredNot specifiedNo separate pool schedule;
Roof Replacement PermitPermit requiredNot specifiedBilled as a standard building permit valued by cost of work, minimum $84.20 plus 65% pl...
Shed PermitIt dependsone-story tool and storage sheds under 200 sq ft are exempt from a permit; sheds 200 sq ft or larger or more than one story require a permitOne-story sheds under 200 sq ft need no permit or fee;
Solar PermitPermit requiredNot specifiedThe building permit portion uses the valuation-based schedule, minimum $84.20 plus 65%...

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with City of Minneapolis Community Planning and Economic Development. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page

Compare Plumbing Permit requirements across Minnesota localities