Minnesota / Saint Paul

Plumbing Permit in Saint Paul, Minnesota

Permit required

Yes, a permit is required

Before installing new, altering, replacing, repairing, relocating, reinstalling or changing waste, vent, water or gas piping, fixtures, or water heating or treating equipment.

Quick answer

DSI states the rule plainly on its own plumbing page and there is no dollar or fixture floor: any new, altered, replaced, repaired, relocated or reinstalled waste, vent, water or gas work needs a plumbing permit. Sec. 33.03(b) of the Legislative Code says the same for plumbing, gas or drainage piping, standpipe and sprinkler systems, and any fixture or water heating or treating equipment, and requires a separate permit for each building or structure. Only licensed plumbing and gas fitter contractors and homesteading homeowners may apply, and homeowners must file a homeowner's affidavit. Related work is split into its own permit categories: sewer, storm or sanitary, gas fitting, radon mitigation systems, private disposal and septic systems each have their own application, and larger projects may trigger a plumbing plan review.

Issued by
City of Saint Paul Department of Safety and Inspections (DSI)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.

Compare plumber quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a plumbing permit costs in Saint Paul

Fee schedule in force
Official scheduleRead .
Published in
DSI's Plumbing Application, Inspection and Fees page (last edited March 3, 2026) and Sec. 33.04(g)(7):

initial permit fee $92, per plumbing fixture $36 whether set, rough-in or replaced, per water supply fixture $6, per gas device or appliance $34, plus $15 for each 100,000 BTUs or fraction thereof where a unit exceeds 100,000 BTUs, and a $1 state surcharge.

The code adds a base gas fee of $85.00 that includes the first device or appliance up to 100,000 BTUs, a maximum of $1,007.00 per appliance, a building sewer permit at $85.00, a private waste treatment system at $257.00 and a radon mitigation system at $150.00.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Saint Paul

General guide, not specific to this office

What a plumbing permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a plumbing permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Saint Paul Department of Safety and Inspections (DSI)

Plumbing Permit in Saint Paul compared with nearby Minnesota localities

LocalityPermit needed?ThresholdWhat each Minnesota schedule saysVerified
Saint PaulPermit requiredAny sizeDSI's Plumbing Application, Inspection and Fees page (last edited March 3, 2026) and Sec. 33.04(g)(7): initial permit fee $92; the schedule has the rest
MinneapolisPermit requiredAny sizeMinimum plumbing permit fee is $85.20 including the $1 state surcharge; the schedule has the rest

Permitting activity in Saint Paul

In 2025, Saint Paul authorized permits for 357 new residential housing units (100 single-family, 257 in multi-family buildings), valued at $100M, down from 404 the year before. That works out to about 1.2 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 306,717.

What else needs a permit in Saint Paul

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of a deck or platform above grade, where it is also not attached to a structure with frost footings and does not act as a landing outside an exterior doorA deck building permit is priced from the valuation table in Sec. 33.04(a); the schedule has the rest
Electrical PermitPermit requiredAny sizeSec. 33.04(g)(4) sets a minimum permit fee of $85.00 for one-family dwelling electrical work
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsBefore roofing, enclosing or building over a patio, before any patio work in a heritage...See schedule
Pool PermitIt dependswater capacity of an in-ground or above ground swimming pool; the prefabricated pool exemption additionally requires the pool to be no more than 24 inches deep and installed entirely above groundThe pool building permit is priced from the valuation table in Sec. 33.04(a); the schedule has the rest
Roof Replacement PermitPermit requiredAny sizeA reroof is a general building permit priced on valuation under Sec. 33.04(a); the schedule has the rest
Shed PermitIt dependsfloor area of a one-story detached accessory structure used as a tool or storage shed, playhouse or similar useA shed over 200 square feet is a general building permit priced from the valuation table in Sec. 33.04(a) of the Legislative Code; the schedule has the rest
Solar PermitPermit requiredAny sizeElectrical, Sec. 33.04(g)(4)k "Renewable energy (solar, wind, etc.)": $151.00 for 0 to 20 kW systems, $363.00 for 21 to 40 kW systems; the schedule has the rest

Frequently asked questions

Do you need a plumbing permit in Saint Paul?
Yes, before installing new, altering, replacing, repairing, relocating, reinstalling or changing waste, vent, water or gas piping, fixtures, or water heating or treating equipment. If you are unsure how that applies to your project, call the permit office at 651-266-8989 before you start.
How much does a plumbing permit cost in Saint Paul?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 651-266-8989.
Where do you apply for a plumbing permit in Saint Paul?
You can apply through the Saint Paul permit portal or contact the City of Saint Paul Department of Safety and Inspections (DSI) directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Saint Paul?
Under Minnesota law (Minn. Stat. 326B.805, subd. 6, clause (3)): Minnesota requires a license to work as a residential building contractor, remodeler, or roofer, but it exempts an owner who builds or improves their own residential real estate if the owner occupies it, or will occupy it, for residential purposes, or keeps it as a rental once the work is done. That exemption lets a homeowner act as their own contractor and pull permits without holding a contractor's license. The exemption does not apply to an owner building or improving property for resale or speculation, and the law presumes speculation if the owner builds or improves more than one property within any 24-month period, unless each property is retained for rental. This is a licensing exemption only; it does not remove the separate requirement to obtain a building permit for the work itself. Confirm how Saint Paul applies this before you apply.

From the Library

Plumbing Permit in other Minnesota localities

Everything above, sourced

How this plumbing permit page for Saint Paul was verified. 2 official sources: stpaul.gov, stpaul.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Saint Paul Department of Safety and Inspections (DSI). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project