Electrical Permit in Saint Paul, Minnesota
Permit required
Yes, a permit is required
Before any new electrical installation in construction, remodeling, replacement or repair, other than minor repair work as defined by the state.
Quick answer
Saint Paul issues and inspects its own electrical permits, which is the exception rather than the rule in Minnesota: Minn. Stat. 326B.36 subd. 1 sends electrical inspection to the state commissioner "Except where any political subdivision has by ordinance provided for electrical inspection similar to that herein provided," and Saint Paul has done exactly that in Sec. 33.03(d) of its Legislative Code. So a Saint Paul homeowner applies to DSI, not to the Department of Labor and Industry, and DSI's own Electrical Inspection Department at 651-266-9003 does the inspection. The only carve out is minor repair work as defined by the state, meaning the adjustment or replacement of worn or defective parts, which covers essentially no household project. The city enforces the 2023 National Electrical Code on all permits obtained on or after July 1, 2023, and a homesteading owner occupant may pull a residential electrical permit with a homeowner's affidavit.
- Issued by
- City of Saint Paul Department of Safety and Inspections (DSI)
- Phone
- 651-266-8989
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Saint Paul
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
- Sec. 33.04(g)(4) sets a minimum permit fee of $85.00 for one-family dwelling electrical work.
- Line items: new service, change of service, temporary service, or addition, alteration or repair on primary or secondary service up to 600v is $85.00;
- new circuits and feeder additions, alterations or repairs up to 600v are $15.00 each;
- electric space heating is $22.00 for 0 to 4,000 watts and $31.00 for 4,001 watts and up;
- swimming pools are $85.00 plus circuit charge;
- renewable energy is $151.00 for 0 to 20 kW. Where the fee cannot be determined from the schedule it is 1 percent of the total valuation with an $85.00 minimum.
- Sec. 33.04 was last amended by Ord 25-41 effective 8-6-25.
- DSI's per-page tables show a $1.00 minimum state surcharge.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Saint Paul
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Saint Paul Department of Safety and Inspections (DSI)
- Department of Safety and Inspections, 375 Jackson Street, Suite 220, Saint Paul, MN 55101-1806
- Phone: 651-266-8989
- Email: DSI-BuildingPlanReview@ci.stpaul.mn.us
Electrical Permit in Saint Paul compared with nearby Minnesota localities
| Locality | Permit needed? | Threshold | What each Minnesota schedule says | Verified |
|---|---|---|---|---|
| Saint Paul | Permit required | Any size | Sec. 33.04(g)(4) sets a minimum permit fee of $85.00 for one-family dwelling electrical work | |
| Minneapolis | Permit required | Any size | See schedule |
Your Electrical Permit checklist for Saint Paul
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: stpaul.gov: building permits inspections.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Saint Paul permit portal.
- Keep the office details handy. City of Saint Paul Department of Safety and Inspections (DSI). Phone: 651-266-8989. Email: DSI-BuildingPlanReview@ci.stpaul.mn.us. Address: Department of Safety and Inspections, 375 Jackson Street, Suite 220, Saint Paul, MN 55101-1806.
Compiled from the official sources on this page. Last checked .
Permitting activity in Saint Paul
In 2025, Saint Paul authorized permits for 357 new residential housing units (100 single-family, 257 in multi-family buildings), valued at $100M, down from 404 the year before. That works out to about 1.2 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 306,717.
What else needs a permit in Saint Paul
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | height of a deck or platform above grade, where it is also not attached to a structure with frost footings and does not act as a landing outside an exterior door | A deck building permit is priced from the valuation table in Sec. 33.04(a); the schedule has the rest |
| Fence Permit | Permit required | Any size | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | Before roofing, enclosing or building over a patio, before any patio work in a heritage... | See schedule |
| Plumbing Permit | Permit required | Any size | DSI's Plumbing Application, Inspection and Fees page (last edited March 3, 2026) and Sec. 33.04(g)(7): initial permit fee $92; the schedule has the rest |
| Pool Permit | It depends | water capacity of an in-ground or above ground swimming pool; the prefabricated pool exemption additionally requires the pool to be no more than 24 inches deep and installed entirely above ground | The pool building permit is priced from the valuation table in Sec. 33.04(a); the schedule has the rest |
| Roof Replacement Permit | Permit required | Any size | A reroof is a general building permit priced on valuation under Sec. 33.04(a); the schedule has the rest |
| Shed Permit | It depends | floor area of a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use | A shed over 200 square feet is a general building permit priced from the valuation table in Sec. 33.04(a) of the Legislative Code; the schedule has the rest |
| Solar Permit | Permit required | Any size | Electrical, Sec. 33.04(g)(4)k "Renewable energy (solar, wind, etc.)": $151.00 for 0 to 20 kW systems, $363.00 for 21 to 40 kW systems; the schedule has the rest |
Frequently asked questions
- Do you need an electrical permit in Saint Paul?
- Yes, before any new electrical installation in construction, remodeling, replacement or repair, other than minor repair work as defined by the state. If you are unsure how that applies to your project, call the permit office at 651-266-8989 before you start.
- How much does an electrical permit cost in Saint Paul?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 651-266-8989.
- Where do you apply for an electrical permit in Saint Paul?
- You can apply through the Saint Paul permit portal or contact the City of Saint Paul Department of Safety and Inspections (DSI) directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Saint Paul?
- Under Minnesota law (Minn. Stat. 326B.805, subd. 6, clause (3)): Minnesota requires a license to work as a residential building contractor, remodeler, or roofer, but it exempts an owner who builds or improves their own residential real estate if the owner occupies it, or will occupy it, for residential purposes, or keeps it as a rental once the work is done. That exemption lets a homeowner act as their own contractor and pull permits without holding a contractor's license. The exemption does not apply to an owner building or improving property for resale or speculation, and the law presumes speculation if the owner builds or improves more than one property within any 24-month period, unless each property is retained for rental. This is a licensing exemption only; it does not remove the separate requirement to obtain a building permit for the work itself. Confirm how Saint Paul applies this before you apply.
From the Library
Electrical Permit in other Minnesota localities
Everything above, sourced
How this electrical permit page for Saint Paul was verified. 2 official sources: stpaul.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Saint Paul Department of Safety and Inspections (DSI). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page