Shed Permit in Saint Paul, Minnesota
It depends
Sometimes, depending on the project
Before building a detached tool or garden shed larger than 200 square feet, and before building a shed of any size on a property in a heritage preservation district or on a designated historic site.
Quick answer
DSI exempts a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use from a building permit as long as the floor area does not exceed 200 square feet. Above 200 square feet it is a general building permit and the same track as a detached garage. The exemption is only from the building permit: an exempt shed still has to meet the zoning rules in Sec. 63.501, which set it back at least three feet from interior lot lines and at least one foot from an alley right of way, cap accessory building height at 15 feet for a flat or shed roof and 18 feet for other roof styles in RL through RM2 districts, and allow a maximum of three non-dwelling accessory buildings totaling no more than 1,200 square feet on a lot. Any accessory structure in a heritage preservation district or on a designated historic site requires Heritage Preservation Commission approval regardless of size.
- Typical threshold
- floor area of a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use
- Issued by
- City of Saint Paul Department of Safety and Inspections (DSI)
- Phone
- 651-266-8989
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.
Compare contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a shed permit costs in Saint Paul
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
- A shed over 200 square feet is a general building permit priced from the valuation table in Sec. 33.04(a) of the Legislative Code, reproduced in DSI's Building Permit Fee Schedule (Section 33.04 of the Saint Paul Legislative Code, Effective: 2/25/2023): "Up to $2,000.00 ..... $36.00 for the first $500.00 plus $5.00 for each additional $100.00 or fraction thereof" and "$2,001.00 to $25,000.00 ..... $106.00 for the first $2,000.00 plus $21.00 for each additional $1,000.00 or fraction thereof".
- A plan review fee of 65 percent of the permit fee applies to any valuation over $1,000.
- The Minnesota state surcharge under Minn. Stat. 326B.148 is $0.50 for jobs valued $1.00 to $1,000 and 0.0005 times job value above that.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Saint Paul
General guide, not specific to this office
What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Saint Paul Department of Safety and Inspections (DSI)
- Department of Safety and Inspections, 375 Jackson Street, Suite 220, Saint Paul, MN 55101-1806
- Phone: 651-266-8989
- Email: DSI-BuildingPlanReview@ci.stpaul.mn.us
Shed Permit in Saint Paul compared with nearby Minnesota localities
| Locality | Permit needed? | Threshold | What each Minnesota schedule says | Verified |
|---|---|---|---|---|
| Saint Paul | It depends | floor area of a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use | A shed over 200 square feet is a general building permit priced from the valuation table in Sec. 33.04(a) of the Legislative Code; the schedule has the rest | |
| Minneapolis | It depends | one-story tool and storage sheds under 200 sq ft are exempt from a permit; sheds 200 sq ft or larger or more than one story require a permit | One-story sheds under 200 sq ft need no permit or fee |
Your Shed Permit checklist for Saint Paul
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: floor area of a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use. Read the rule where we read it: stpaul.gov: building permits inspections.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Saint Paul permit portal.
- Keep the office details handy. City of Saint Paul Department of Safety and Inspections (DSI). Phone: 651-266-8989. Email: DSI-BuildingPlanReview@ci.stpaul.mn.us. Address: Department of Safety and Inspections, 375 Jackson Street, Suite 220, Saint Paul, MN 55101-1806.
Compiled from the official sources on this page. Last checked .
Permitting activity in Saint Paul
In 2025, Saint Paul authorized permits for 357 new residential housing units (100 single-family, 257 in multi-family buildings), valued at $100M, down from 404 the year before. That works out to about 1.2 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 306,717.
What else needs a permit in Saint Paul
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | height of a deck or platform above grade, where it is also not attached to a structure with frost footings and does not act as a landing outside an exterior door | A deck building permit is priced from the valuation table in Sec. 33.04(a); the schedule has the rest |
| Electrical Permit | Permit required | Any size | Sec. 33.04(g)(4) sets a minimum permit fee of $85.00 for one-family dwelling electrical work |
| Fence Permit | Permit required | Any size | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | Before roofing, enclosing or building over a patio, before any patio work in a heritage... | See schedule |
| Plumbing Permit | Permit required | Any size | DSI's Plumbing Application, Inspection and Fees page (last edited March 3, 2026) and Sec. 33.04(g)(7): initial permit fee $92; the schedule has the rest |
| Pool Permit | It depends | water capacity of an in-ground or above ground swimming pool; the prefabricated pool exemption additionally requires the pool to be no more than 24 inches deep and installed entirely above ground | The pool building permit is priced from the valuation table in Sec. 33.04(a); the schedule has the rest |
| Roof Replacement Permit | Permit required | Any size | A reroof is a general building permit priced on valuation under Sec. 33.04(a); the schedule has the rest |
| Solar Permit | Permit required | Any size | Electrical, Sec. 33.04(g)(4)k "Renewable energy (solar, wind, etc.)": $151.00 for 0 to 20 kW systems, $363.00 for 21 to 40 kW systems; the schedule has the rest |
Frequently asked questions
- Do you need a shed permit in Saint Paul?
- It depends on the project. Floor area of a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use. If you are unsure how that applies to your project, call the permit office at 651-266-8989 before you start.
- How much does a shed permit cost in Saint Paul?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 651-266-8989.
- Where do you apply for a shed permit in Saint Paul?
- You can apply through the Saint Paul permit portal or contact the City of Saint Paul Department of Safety and Inspections (DSI) directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Saint Paul?
- Under Minnesota law (Minn. Stat. 326B.805, subd. 6, clause (3)): Minnesota requires a license to work as a residential building contractor, remodeler, or roofer, but it exempts an owner who builds or improves their own residential real estate if the owner occupies it, or will occupy it, for residential purposes, or keeps it as a rental once the work is done. That exemption lets a homeowner act as their own contractor and pull permits without holding a contractor's license. The exemption does not apply to an owner building or improving property for resale or speculation, and the law presumes speculation if the owner builds or improves more than one property within any 24-month period, unless each property is retained for rental. This is a licensing exemption only; it does not remove the separate requirement to obtain a building permit for the work itself. Confirm how Saint Paul applies this before you apply.
From the Library
Shed Permit in other Minnesota localities
Everything above, sourced
How this shed permit page for Saint Paul was verified. 2 official sources: stpaul.gov, stpaul.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Saint Paul Department of Safety and Inspections (DSI). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page