Roof Replacement Permit in Saint Paul, Minnesota
Permit required
Yes, a permit is required
Before tearing off or overlaying a residential roof, before roof repair work, and before any exterior repair in a heritage preservation district regardless of value.
Quick answer
Roofing is permitted work in Saint Paul: Sec. 33.03(a) requires a building permit to repair or alter any building or structure, and DSI's Contractor Express Building Permit expressly covers re-roof and roof repair, shingle with tear off, shingle with overlay, flat with tear off, flat with overlay, slate, and tile. Licensed contractors file the fast track Residential Contractor Express Roofing Permit in PAULIE, which skips plan review and can be issued online; homeowners may not use the express route and must file a General Building Permit Application instead. The city administers the 2020 Minnesota Residential Code for roofing on one and two family dwellings and requires shingles to be fastened to solidly sheathed decks or one inch nominal wood boards, following the manufacturer's installation specifications. Notify the area building inspector before roofing starts, preferably the day before and no later than 9:00 am on the start day.
- Issued by
- City of Saint Paul Department of Safety and Inspections (DSI)
- Phone
- 651-266-8989
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.
Compare roofing quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a roof replacement permit costs in Saint Paul
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
- A reroof is a general building permit priced on valuation under Sec. 33.04(a), published as DSI's Building Permit Fee Schedule (Section 33.04 of the Saint Paul Legislative Code, Effective: 2/25/2023).
- Sample rows from the schedule: valuation 9,001 to 10,000 = $274, 11,001 to 12,000 = $316, 19,001 to 20,000 = $484.
- Above $100,000 the fee is $1,499 for the first $100,000 plus $8 for each additional $1,000.
- The Minnesota state surcharge is $0.50 for jobs valued $1.00 to $1,000, otherwise 0.0005 times job value.
- DSI notes that Contractor Express items, which include re-roof and roof repair, do not require plan review and can be issued online.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Saint Paul
General guide, not specific to this office
What a roof replacement permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a roof replacement permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Saint Paul Department of Safety and Inspections (DSI)
- Department of Safety and Inspections, 375 Jackson Street, Suite 220, Saint Paul, MN 55101-1806
- Phone: 651-266-8989
- Email: DSI-BuildingPlanReview@ci.stpaul.mn.us
Roof Replacement Permit in Saint Paul compared with nearby Minnesota localities
| Locality | Permit needed? | Threshold | What each Minnesota schedule says | Verified |
|---|---|---|---|---|
| Saint Paul | Permit required | Any size | A reroof is a general building permit priced on valuation under Sec. 33.04(a); the schedule has the rest | |
| Minneapolis | Permit required | Any size | Billed as a standard building permit valued by cost of work, minimum $84.20 plus 65% plan review and 0.05% state surcharge |
Your Roof Replacement Permit checklist for Saint Paul
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: stpaul.gov: building permits inspections.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Saint Paul permit portal.
- Keep the office details handy. City of Saint Paul Department of Safety and Inspections (DSI). Phone: 651-266-8989. Email: DSI-BuildingPlanReview@ci.stpaul.mn.us. Address: Department of Safety and Inspections, 375 Jackson Street, Suite 220, Saint Paul, MN 55101-1806.
Compiled from the official sources on this page. Last checked .
Permitting activity in Saint Paul
In 2025, Saint Paul authorized permits for 357 new residential housing units (100 single-family, 257 in multi-family buildings), valued at $100M, down from 404 the year before. That works out to about 1.2 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 306,717.
What else needs a permit in Saint Paul
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | height of a deck or platform above grade, where it is also not attached to a structure with frost footings and does not act as a landing outside an exterior door | A deck building permit is priced from the valuation table in Sec. 33.04(a); the schedule has the rest |
| Electrical Permit | Permit required | Any size | Sec. 33.04(g)(4) sets a minimum permit fee of $85.00 for one-family dwelling electrical work |
| Fence Permit | Permit required | Any size | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | Before roofing, enclosing or building over a patio, before any patio work in a heritage... | See schedule |
| Plumbing Permit | Permit required | Any size | DSI's Plumbing Application, Inspection and Fees page (last edited March 3, 2026) and Sec. 33.04(g)(7): initial permit fee $92; the schedule has the rest |
| Pool Permit | It depends | water capacity of an in-ground or above ground swimming pool; the prefabricated pool exemption additionally requires the pool to be no more than 24 inches deep and installed entirely above ground | The pool building permit is priced from the valuation table in Sec. 33.04(a); the schedule has the rest |
| Shed Permit | It depends | floor area of a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use | A shed over 200 square feet is a general building permit priced from the valuation table in Sec. 33.04(a) of the Legislative Code; the schedule has the rest |
| Solar Permit | Permit required | Any size | Electrical, Sec. 33.04(g)(4)k "Renewable energy (solar, wind, etc.)": $151.00 for 0 to 20 kW systems, $363.00 for 21 to 40 kW systems; the schedule has the rest |
Frequently asked questions
- Do you need a roof replacement permit in Saint Paul?
- Yes, before tearing off or overlaying a residential roof, before roof repair work, and before any exterior repair in a heritage preservation district regardless of value. If you are unsure how that applies to your project, call the permit office at 651-266-8989 before you start.
- How much does a roof replacement permit cost in Saint Paul?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 651-266-8989.
- Where do you apply for a roof replacement permit in Saint Paul?
- You can apply through the Saint Paul permit portal or contact the City of Saint Paul Department of Safety and Inspections (DSI) directly. The links are listed on this page.
- Can a homeowner pull a roof replacement permit themselves in Saint Paul?
- Under Minnesota law (Minn. Stat. 326B.805, subd. 6, clause (3)): Minnesota requires a license to work as a residential building contractor, remodeler, or roofer, but it exempts an owner who builds or improves their own residential real estate if the owner occupies it, or will occupy it, for residential purposes, or keeps it as a rental once the work is done. That exemption lets a homeowner act as their own contractor and pull permits without holding a contractor's license. The exemption does not apply to an owner building or improving property for resale or speculation, and the law presumes speculation if the owner builds or improves more than one property within any 24-month period, unless each property is retained for rental. This is a licensing exemption only; it does not remove the separate requirement to obtain a building permit for the work itself. Confirm how Saint Paul applies this before you apply.
From the Library
Roof Replacement Permit in other Minnesota localities
Everything above, sourced
How this roof replacement permit page for Saint Paul was verified. 2 official sources: stpaul.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Saint Paul Department of Safety and Inspections (DSI). Rules change; confirm before you build. How we verify.