Before pouring new concrete or asphalt paving of 200 square feet or more, any new paving in the front yard setback, or building a patio cover.
Quick answer
Omaha's building code has no patio-specific rule; the decisive provision is its paving exemption: new concrete or asphalt paving needs no building permit when the total area is less than 200 square feet and it is not in the front yard setback. Replacing existing concrete or asphalt drives and walks at no larger than the prior area is also exempt. A patio cover, carport or pergola is a 'RESIDENTIAL - MISC' building permit.
- Typical threshold
- total area of new concrete or asphalt paving, outside the front yard setback
- Issued by
- City of Omaha Planning Department, Permits and Inspections Division
- Phone
- 402-444-5350
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare patio contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a patio permit costs in Omaha
- Permit fee
- Not published
- Fee schedule in force
- Official scheduleRead .
Omaha publishes no fee for this permit type in a schedule we can verify. Ask City of Omaha Planning Department, Permits and Inspections Division how the fee is calculated for your project.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Omaha
General guide, not specific to this office
What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Omaha Planning Department, Permits and Inspections Division
- 1819 Farnam Street, Suite 1110 (11th floor, Civic Center), Omaha, NE 68183
- Phone: 402-444-5350
- Email: permit.info@cityofomaha.org
Patio Permit in Omaha compared with nearby Nebraska localities
| Locality | Permit needed? | Threshold | What each Nebraska schedule says | Verified |
|---|---|---|---|---|
| Omaha | It depends | total area of new concrete or asphalt paving, outside the front yard setback | Not published | |
| Lincoln | Not confirmed | Not confirmed | Not published |
Your Patio Permit checklist for Omaha
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: total area of new concrete or asphalt paving, outside the front yard setback. Read the rule where we read it: planning.omaha.gov: building and development division.
- Budget the fee. Price your project from the official fee schedule.
- Apply. Start at the Omaha permit portal.
- Keep the office details handy. City of Omaha Planning Department, Permits and Inspections Division. Phone: 402-444-5350. Email: permit.info@cityofomaha.org. Address: 1819 Farnam Street, Suite 1110 (11th floor, Civic Center), Omaha, NE 68183.
Compiled from the official sources on this page. Last checked .
Permitting activity in Omaha
In 2025, Omaha authorized permits for 3,776 new residential housing units (1,557 single-family, 2,219 in multi-family buildings), valued at $441M, down from 4,360 the year before. That works out to about 7.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 478,393.
What else needs a permit in Omaha
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | When the remodel moves or adds plumbing, adds or alters wiring, or makes a structural... | Plumbing: per-fixture and per-relocation fees with a $22.70 minimum (Sec. 49-304) |
| Deck Permit | Permit required | Any size | Valuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00 |
| Electrical Permit | Permit required | Any size | Omaha Municipal Code Sec. 44-130: minimum fee on all electrical work $25.00 |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | Permit required | Any size | Valuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00 |
| HVAC Permit | Permit required | Any size | Omaha Municipal Code Sec. 40-109, Domestic-Residential: A/C units and heat pumps $50.00 first unit, $40.00 second |
| Plumbing Permit | Permit required | Any size | Omaha Municipal Code Sec. 49-304: minimum permit fee $22.70 |
| Pool Permit | It depends | Before installing the pool's barrier fence, any pool accessory structure over 75 square... | Plumbing permit line items, Omaha Municipal Code Sec. 49-304: each below ground swimming pool $58.90 |
| Roof Replacement Permit | It depends | area of roofing repaired or replaced (2 squares) | Valuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00 |
| Shed Permit | It depends | floor area of the accessory building | Valuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00 |
| Solar Permit | Permit required | Any size | Building permit fee by valuation, Omaha Municipal Code Sec. 43-91; the schedule has the rest |
| Water Heater Permit | Permit required | Any size | Omaha Municipal Code Sec. 49-304: minimum permit fee $22.70 |
Frequently asked questions
- Do you need a patio permit in Omaha?
- It depends on the project. Total area of new concrete or asphalt paving, outside the front yard setback. If you are unsure how that applies to your project, call the City of Omaha Planning Department, Permits and Inspections Division at 402-444-5350 before you start.
- How much does a patio permit cost in Omaha?
- We found no published fee for a patio permit in Omaha. To learn how it is calculated for your project, call the City of Omaha Planning Department, Permits and Inspections Division at 402-444-5350.
- Where do you apply for a patio permit in Omaha?
- You can apply through the Omaha permit portal or contact the City of Omaha Planning Department, Permits and Inspections Division directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Omaha?
- Under Nebraska law (Neb. Rev. Stat. 81-2121(5); 48-2104(1)): Nebraska lets owners work on their own property. The State Electrical Act does not prohibit an owner from doing electrical work on a principal residence no larger than a single-family dwelling, or on farm property, and does not require that owner to be licensed (commercial, industrial, and public-use installations excluded). The Contractor Registration Act likewise says a person who works on, or has work performed on, his or her own property is not a contractor and need not register (48-2104). Whether the owner may pull the local building permit is decided by the county, city, or village; no state owner-builder disclosure form or resale restriction was found. Confirm how Omaha applies this before you apply.
From the Library
Patio Permit in other Nebraska localities
Everything above, sourced
How this patio permit page for Omaha was verified. 2 official sources: planning.omaha.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Omaha Planning Department, Permits and Inspections Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page