Pool Permit in Omaha, Nebraska
It depends
Sometimes, depending on the project
Before installing the pool's barrier fence, any pool accessory structure over 75 square feet, or the pool's electrical, plumbing or mechanical work.
Quick answer
Omaha's building code exempts swimming pools themselves from a building permit, but not the fences around them or pool accessory structures over 75 square feet. Separate electrical, plumbing and mechanical permits are still required for the exempted items, so the pump circuit, bonding and any heater are permitted trades work. Omaha also deleted IRC Section R326 (swimming pools, spas and hot tubs) from its residential code.
- Issued by
- City of Omaha Planning Department, Permits and Inspections Division
- Phone
- 402-444-5350
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.
Compare pool builder quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a pool permit costs in Omaha
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
- Published in
- Plumbing permit line items, Omaha Municipal Code Sec. 49-304:
- each below ground swimming pool $58.90;
- each hot tub, spa or above ground swimming pool $17.00.
- Barrier fence and accessory structures over 75 square feet pay the valuation-based building permit fee (Sec. 43-91, $41.00 up to $2,000.00 of valuation).
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Omaha
General guide, not specific to this office
What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Omaha Planning Department, Permits and Inspections Division
- 1819 Farnam Street, Suite 1110 (11th floor, Civic Center), Omaha, NE 68183
- Phone: 402-444-5350
- Email: permit.info@cityofomaha.org
Pool Permit in Omaha compared with nearby Nebraska localities
| Locality | Permit needed? | Threshold | What each Nebraska schedule says | Verified |
|---|---|---|---|---|
| Omaha | It depends | Before installing the pool's barrier fence, any pool accessory structure over 75 square... | Plumbing permit line items, Omaha Municipal Code Sec. 49-304: each below ground swimming pool $58.90 | |
| Lincoln | It depends | prefabricated, temporary pools only; any other pool needs a building permit | See schedule |
Your Pool Permit checklist for Omaha
- Confirm the requirement. Sometimes, depending on the project. Read the rule where we read it: planning.omaha.gov: building and development division.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Omaha permit portal.
- Keep the office details handy. City of Omaha Planning Department, Permits and Inspections Division. Phone: 402-444-5350. Email: permit.info@cityofomaha.org. Address: 1819 Farnam Street, Suite 1110 (11th floor, Civic Center), Omaha, NE 68183.
Compiled from the official sources on this page. Last checked .
Permitting activity in Omaha
In 2025, Omaha authorized permits for 3,776 new residential housing units (1,557 single-family, 2,219 in multi-family buildings), valued at $441M, down from 4,360 the year before. That works out to about 7.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 478,393.
What else needs a permit in Omaha
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | When the remodel moves or adds plumbing, adds or alters wiring, or makes a structural... | Plumbing: per-fixture and per-relocation fees with a $22.70 minimum (Sec. 49-304) |
| Deck Permit | Permit required | Any size | Valuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00 |
| Electrical Permit | Permit required | Any size | Omaha Municipal Code Sec. 44-130: minimum fee on all electrical work $25.00 |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | Permit required | Any size | Valuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00 |
| HVAC Permit | Permit required | Any size | Omaha Municipal Code Sec. 40-109, Domestic-Residential: A/C units and heat pumps $50.00 first unit, $40.00 second |
| Patio Permit | It depends | total area of new concrete or asphalt paving, outside the front yard setback | Not published |
| Plumbing Permit | Permit required | Any size | Omaha Municipal Code Sec. 49-304: minimum permit fee $22.70 |
| Roof Replacement Permit | It depends | area of roofing repaired or replaced (2 squares) | Valuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00 |
| Shed Permit | It depends | floor area of the accessory building | Valuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00 |
| Solar Permit | Permit required | Any size | Building permit fee by valuation, Omaha Municipal Code Sec. 43-91; the schedule has the rest |
| Water Heater Permit | Permit required | Any size | Omaha Municipal Code Sec. 49-304: minimum permit fee $22.70 |
Frequently asked questions
- Do you need a pool permit in Omaha?
- Sometimes: before installing the pool's barrier fence, any pool accessory structure over 75 square feet, or the pool's electrical, plumbing or mechanical work. If you are unsure how that applies to your project, call the City of Omaha Planning Department, Permits and Inspections Division at 402-444-5350 before you start.
- How much does a pool permit cost in Omaha?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Omaha Planning Department, Permits and Inspections Division at 402-444-5350.
- Where do you apply for a pool permit in Omaha?
- You can apply through the Omaha permit portal or contact the City of Omaha Planning Department, Permits and Inspections Division directly. The links are listed on this page.
- Can a homeowner pull a pool permit themselves in Omaha?
- Under Nebraska law (Neb. Rev. Stat. 81-2121(5); 48-2104(1)): Nebraska lets owners work on their own property. The State Electrical Act does not prohibit an owner from doing electrical work on a principal residence no larger than a single-family dwelling, or on farm property, and does not require that owner to be licensed (commercial, industrial, and public-use installations excluded). The Contractor Registration Act likewise says a person who works on, or has work performed on, his or her own property is not a contractor and need not register (48-2104). Whether the owner may pull the local building permit is decided by the county, city, or village; no state owner-builder disclosure form or resale restriction was found. Confirm how Omaha applies this before you apply.
From the Library
Pool Permit in other Nebraska localities
Everything above, sourced
How this pool permit page for Omaha was verified. 2 official sources: planning.omaha.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Omaha Planning Department, Permits and Inspections Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page