Nebraska / Lincoln

Pool Permit in Lincoln, Nebraska

It depends

Sometimes, depending on the project

Before installing an in-ground pool, or a pool that is not a prefabricated temporary pool 48 inches deep or less.

Quick answer

Lincoln's amended residential code exempts only prefabricated, temporary swimming pools with a depth of 48 inches or less; every other residential pool needs a permit. Pool electrical wiring must be done by a licensed electrical contractor, not a homeowner, when a building permit is required for the pool. Separately, LMC 8.36.020 requires any family pool, spa or hot tub 18 inches or deeper to be fully enclosed by a fence or wall at least 4 feet high with self-closing, self-latching gates, or covered by a certified safety cover.

Typical threshold
prefabricated, temporary pools only; any other pool needs a building permit
Issued by
City of Lincoln Building and Safety (Planning and Development Services / Planning Department)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Pool rules in Lincoln

Also required
A family pool, spa or hot tub eighteen inches or more deep must be completely surrounded by a fence or wall at least four feet high with no gaps over four inches (the house may form part of it), and every gate or door through it must be self-closing and self-latching (except a house door). online.encodeplus.com: doc view
Also required
Instead of a fence, a family pool may be secured with a certified safety cover (a power cover if one is commercially available), but whenever the cover is not fully closed the pool must be watched by someone at least 16 years old. online.encodeplus.com: doc view

What a pool permit costs in Lincoln

Plumbing fee schedule line 'Swimming Pool (Res.)' $10 (Building and Safety Plumbing Fees page; 'Fees are subject to change with each code cycle.'), plus the building permit fee (minimum $65).

How to apply in Lincoln

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Lincoln Building and Safety (Planning and Development Services / Planning Department)

Pool Permit in Lincoln compared with nearby Nebraska localities

LocalityPermit needed?ThresholdWhat each Nebraska schedule saysVerified
LincolnIt dependsprefabricated, temporary pools only; any other pool needs a building permitSee schedule
OmahaIt dependsBefore installing the pool's barrier fence, any pool accessory structure over 75 square...Plumbing permit line items, Omaha Municipal Code Sec. 49-304: each below ground swimming pool $58.90

Permitting activity in Lincoln

In 2025, Lincoln authorized permits for 2,215 new residential housing units (859 single-family, 1,356 in multi-family buildings), valued at $476M, up from 1,730 the year before. That works out to about 7.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 290,505.

What else needs a permit in Lincoln

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsWhen the remodel replaces, relocates or changes the type of a plumbing fixture, adds or...Plumbing Fees page: $8 per fixture (Water Closet or Urinal, Lavatory, Bathtub, Shower)
Deck PermitPermit requiredAny sizeMinimum building permit fee: 'The minimum fee starts at $65 and increases from there.'
Electrical PermitIt dependsBefore installing, altering or adding to any electrical equipment, other than...Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'): BASE FEE $30
EV Charger PermitPermit requiredAny sizeElectrical Fees page: BASE FEE $30
Fence PermitIt dependsfence height; corner-lot and driveway/alley fences also need a Public Works sight-distance reviewNot published
HVAC PermitIt dependsBefore installing, replacing, altering or removing a furnace, air conditioner, heat...Mechanical Fees page ('Fees are subject to change with each code cycle.'): Gas Furnace $40
Plumbing PermitIt dependsBefore installing, altering or repairing plumbing or drainage, including replacing or...See schedule
Roof Replacement PermitIt dependsre-shingling over solid sheathing is exempt; rot repair or new sheathing needs a permitNot published
Shed PermitPermit requiredAny sizeMinimum building permit fee: 'The minimum fee starts at $65 and increases from there.'
Solar PermitPermit requiredAny sizeElectrical Fees page: BASE FEE $30 plus per-item charges
Water Heater PermitPermit requiredAny sizePlumbing Fees page: 'Water Heater Electric' $8

Frequently asked questions

Do you need a pool permit in Lincoln?
It depends on the project. Prefabricated, temporary pools only; any other pool needs a building permit. If you are unsure how that applies to your project, call the permit office at 402-441-7521 before you start.
How much does a pool permit cost in Lincoln?
The fee wording from the official schedule is in the cost table on this page, as we read it on 3 Oct 2026. For the figure on your own project, call the permit office at 402-441-7521.
Where do you apply for a pool permit in Lincoln?
You can apply through the Lincoln permit portal or contact the City of Lincoln Building and Safety (Planning and Development Services / Planning Department) directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Lincoln?
Under Nebraska law (Neb. Rev. Stat. 81-2121(5); 48-2104(1)): Nebraska lets owners work on their own property. The State Electrical Act does not prohibit an owner from doing electrical work on a principal residence no larger than a single-family dwelling, or on farm property, and does not require that owner to be licensed (commercial, industrial, and public-use installations excluded). The Contractor Registration Act likewise says a person who works on, or has work performed on, his or her own property is not a contractor and need not register (48-2104). Whether the owner may pull the local building permit is decided by the county, city, or village; no state owner-builder disclosure form or resale restriction was found. Confirm how Lincoln applies this before you apply.

From the Library

Pool Permit in other Nebraska localities

Everything above, sourced

How this pool permit page for Lincoln was verified. 2 official sources: lincoln.ne.gov, online.encodeplus.com. Last checked by Mario Bailey, not confirmed with City of Lincoln Building and Safety (Planning and Development Services / Planning Department). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project