Nebraska / Lincoln

EV Charger Permit in Lincoln, Nebraska

Permit required

Yes, a permit is required

Before adding a circuit for a hardwired or 240-volt EV charger.

Quick answer

Lincoln publishes no EV-charger page; the electrical code decides it. Installing a charger means installing or adding to electrical equipment, which requires an electrical permit, and no exemption covers a new circuit. A homeowner who owns and occupies a detached single-family home may pull the permit and install the branch circuit, but service upgrades must be done by a registered electrical contractor.

Issued by
City of Lincoln Building and Safety (Planning and Development Services / Planning Department)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an EV charger permit costs in Lincoln

Published in
Electrical Fees page:
  • BASE FEE $30;
  • Branch Circuits & Feeders, new, extensions, or modifications of each $6;
  • a service upgrade adds Service(s) 0-200 amperes $30.

How to apply in Lincoln

General guide, not specific to this office

What an EV charger permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an EV charger permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Lincoln Building and Safety (Planning and Development Services / Planning Department)

EV Charger Permit in Lincoln compared with nearby Nebraska localities

LocalityPermit needed?ThresholdWhat each Nebraska schedule saysVerified
LincolnPermit requiredAny sizeElectrical Fees page: BASE FEE $30
OmahaPermit requiredAny sizeSee schedule

Permitting activity in Lincoln

In 2025, Lincoln authorized permits for 2,215 new residential housing units (859 single-family, 1,356 in multi-family buildings), valued at $476M, up from 1,730 the year before. That works out to about 7.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 290,505.

What else needs a permit in Lincoln

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsWhen the remodel replaces, relocates or changes the type of a plumbing fixture, adds or...Plumbing Fees page: $8 per fixture (Water Closet or Urinal, Lavatory, Bathtub, Shower)
Deck PermitPermit requiredAny sizeMinimum building permit fee: 'The minimum fee starts at $65 and increases from there.'
Electrical PermitIt dependsBefore installing, altering or adding to any electrical equipment, other than...Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'): BASE FEE $30
Fence PermitIt dependsfence height; corner-lot and driveway/alley fences also need a Public Works sight-distance reviewNot published
HVAC PermitIt dependsBefore installing, replacing, altering or removing a furnace, air conditioner, heat...Mechanical Fees page ('Fees are subject to change with each code cycle.'): Gas Furnace $40
Plumbing PermitIt dependsBefore installing, altering or repairing plumbing or drainage, including replacing or...See schedule
Pool PermitIt dependsprefabricated, temporary pools only; any other pool needs a building permitSee schedule
Roof Replacement PermitIt dependsre-shingling over solid sheathing is exempt; rot repair or new sheathing needs a permitNot published
Shed PermitPermit requiredAny sizeMinimum building permit fee: 'The minimum fee starts at $65 and increases from there.'
Solar PermitPermit requiredAny sizeElectrical Fees page: BASE FEE $30 plus per-item charges
Water Heater PermitPermit requiredAny sizePlumbing Fees page: 'Water Heater Electric' $8

Frequently asked questions

Do you need an EV charger permit in Lincoln?
Yes, before adding a circuit for a hardwired or 240-volt EV charger. If you are unsure how that applies to your project, call the permit office at 402-441-7521 before you start.
How much does an EV charger permit cost in Lincoln?
The fee wording from the official schedule is in the cost table on this page, as we read it on 3 Oct 2026. For the figure on your own project, call the permit office at 402-441-7521.
Where do you apply for an EV charger permit in Lincoln?
You can apply through the Lincoln permit portal or contact the City of Lincoln Building and Safety (Planning and Development Services / Planning Department) directly. The links are listed on this page.
Can a homeowner pull an EV charger permit themselves in Lincoln?
Under Nebraska law (Neb. Rev. Stat. 81-2121(5); 48-2104(1)): Nebraska lets owners work on their own property. The State Electrical Act does not prohibit an owner from doing electrical work on a principal residence no larger than a single-family dwelling, or on farm property, and does not require that owner to be licensed (commercial, industrial, and public-use installations excluded). The Contractor Registration Act likewise says a person who works on, or has work performed on, his or her own property is not a contractor and need not register (48-2104). Whether the owner may pull the local building permit is decided by the county, city, or village; no state owner-builder disclosure form or resale restriction was found. Confirm how Lincoln applies this before you apply.

From the Library

EV Charger Permit in other Nebraska localities

Everything above, sourced

How this EV charger permit page for Lincoln was verified. 2 official sources: lincoln.ne.gov, online.encodeplus.com. Last checked by Mario Bailey, not confirmed with City of Lincoln Building and Safety (Planning and Development Services / Planning Department). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project