Shed Permit in Lincoln, Nebraska

Permit required

Yes, a permit is required

Before building any shed or detached accessory building, regardless of size.

Quick answer

Lincoln requires a building permit for every shed, including small ones: sheds of 120 sq ft or less still need a permit but only a site plan as the permit drawings. Lincoln's amended exemption list drops the model code's 200 sq ft accessory-structure exemption and exempts only a one-story playhouse of 65 sq ft or less.

Diagram of three shed footprints, small to large: a shed permit applies at any size in Lincoln, Nebraska
Illustrated: sheds of any size. Lincoln publishes no size below which a shed needs no permit, as the verdict on this page states, verified 2026-10-03.
Issued by
City of Lincoln Building and Safety (Planning and Development Services / Planning Department)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Shed size, height and setback rules in Lincoln

Setback
In the R-1 through R-8 districts, a detached accessory building such as a shed may sit in the required rear yard but no nearer than two feet to the side or rear lot line. online.encodeplus.com: doc view
Setback
In the R-1 through R-8 districts, a detached accessory building at least sixty feet from the front lot line may extend into the required side yard, but no closer than two feet to the side lot line and no taller than fifteen feet. online.encodeplus.com: doc view
Setback
In the R-1 through R-8 districts, a detached garage that takes access from an alley must be at least ten feet from the alley line. online.encodeplus.com: doc view
Height limit
In the R-1 through R-8 districts, a detached accessory building in the required rear yard may not be more than fifteen feet high. online.encodeplus.com: doc view
Size limit
In the R-1 through R-6 districts, detached accessory buildings may occupy no more than forty percent of the required rear yard. online.encodeplus.com: doc view
Size limit
On a single-family or two-family lot in the R-1 to R-8 districts, all accessory buildings together may total up to 1,000 square feet of floor area on a lot under 7,500 square feet, 1,500 square feet on a lot of 7,500 to under 20,000 square feet, and 2,000 square feet on a lot of 20,000 square feet or more. online.encodeplus.com: doc view
Size limit
On an R-1 to R-8 lot of 7,500 square feet to under 1 acre, the accessory-building total may rise to 3,000 square feet only if it does not exceed the house's floor area (basement excluded), no more than 250 square feet of it sits in the side, rear and front yard setbacks, and any single building over 250 square feet is outside those setbacks. online.encodeplus.com: doc view
Also required
In the R-1 through R-8 districts, an accessory building attached to the house or within six feet of it counts as part of the house and must meet the house's height and yard requirements. online.encodeplus.com: doc view

What a shed permit costs in Lincoln

Minimum building permit fee: 'The minimum fee starts at $65 and increases from there.'

How to apply in Lincoln

General guide, not specific to this office

What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Lincoln Building and Safety (Planning and Development Services / Planning Department)

Shed Permit in Lincoln compared with nearby Nebraska localities

LocalityPermit needed?ThresholdWhat each Nebraska schedule saysVerified
LincolnPermit requiredAny sizeMinimum building permit fee: 'The minimum fee starts at $65 and increases from there.'
OmahaIt dependsfloor area of the accessory buildingValuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00

Permitting activity in Lincoln

In 2025, Lincoln authorized permits for 2,215 new residential housing units (859 single-family, 1,356 in multi-family buildings), valued at $476M, up from 1,730 the year before. That works out to about 7.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 290,505.

What else needs a permit in Lincoln

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsWhen the remodel replaces, relocates or changes the type of a plumbing fixture, adds or...Plumbing Fees page: $8 per fixture (Water Closet or Urinal, Lavatory, Bathtub, Shower)
Deck PermitPermit requiredAny sizeMinimum building permit fee: 'The minimum fee starts at $65 and increases from there.'
Electrical PermitIt dependsBefore installing, altering or adding to any electrical equipment, other than...Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'): BASE FEE $30
EV Charger PermitPermit requiredAny sizeElectrical Fees page: BASE FEE $30
Fence PermitIt dependsfence height; corner-lot and driveway/alley fences also need a Public Works sight-distance reviewNot published
HVAC PermitIt dependsBefore installing, replacing, altering or removing a furnace, air conditioner, heat...Mechanical Fees page ('Fees are subject to change with each code cycle.'): Gas Furnace $40
Plumbing PermitIt dependsBefore installing, altering or repairing plumbing or drainage, including replacing or...See schedule
Pool PermitIt dependsprefabricated, temporary pools only; any other pool needs a building permitSee schedule
Roof Replacement PermitIt dependsre-shingling over solid sheathing is exempt; rot repair or new sheathing needs a permitNot published
Solar PermitPermit requiredAny sizeElectrical Fees page: BASE FEE $30 plus per-item charges
Water Heater PermitPermit requiredAny sizePlumbing Fees page: 'Water Heater Electric' $8

Frequently asked questions

Do you need a shed permit in Lincoln?
Yes, before building any shed or detached accessory building, regardless of size. If you are unsure how that applies to your project, call the permit office at 402-441-7521 before you start.
How much does a shed permit cost in Lincoln?
The fee wording from the official schedule is in the cost table on this page, as we read it on 3 Oct 2026. For the figure on your own project, call the permit office at 402-441-7521.
Where do you apply for a shed permit in Lincoln?
You can apply through the Lincoln permit portal or contact the City of Lincoln Building and Safety (Planning and Development Services / Planning Department) directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Lincoln?
Under Nebraska law (Neb. Rev. Stat. 81-2121(5); 48-2104(1)): Nebraska lets owners work on their own property. The State Electrical Act does not prohibit an owner from doing electrical work on a principal residence no larger than a single-family dwelling, or on farm property, and does not require that owner to be licensed (commercial, industrial, and public-use installations excluded). The Contractor Registration Act likewise says a person who works on, or has work performed on, his or her own property is not a contractor and need not register (48-2104). Whether the owner may pull the local building permit is decided by the county, city, or village; no state owner-builder disclosure form or resale restriction was found. Confirm how Lincoln applies this before you apply.

From the Library

Shed Permit in other Nebraska localities

Everything above, sourced

How this shed permit page for Lincoln was verified. 2 official sources: lincoln.ne.gov, lincoln.ne.gov. Last checked by Mario Bailey, not confirmed with City of Lincoln Building and Safety (Planning and Development Services / Planning Department). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page