Deck Permit in Lincoln, Nebraska

Permit required

Yes, a permit is required

Before building any deck.

Quick answer

Lincoln requires a building permit for decks with no size or height exemption: its amended R105.2 exemption list omits the model code's small-deck exemption entirely. A site plan showing the deck's location on the lot is required, and the department publishes a deck brochure and handout.

Issued by
City of Lincoln Building and Safety (Planning and Development Services / Planning Department)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.

Compare deck contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Deck size, height and setback rules in Lincoln

Setback
An uncovered deck no more than three feet above or below the adjacent ground may project into a required side or rear yard, but no closer than two feet to the side lot line. online.encodeplus.com: doc view
Setback
A deck more than three feet above or below the ground may project into the required rear yard of a single- or two-family house only if it is uncovered, comes off the first story or below, stays at least ten feet from the rear lot line, stays out of the side yard, and together with rear-yard accessory buildings covers no more than 40% of the rear yard. online.encodeplus.com: doc view
Setback
In the R-1 through R-4 districts, where the rear yard backs onto permanent open space or a body of water of at least five acres, an unenclosed deck may be closer than the normal rear-yard setback, but never less than 5 feet from the line. online.encodeplus.com: doc view

What a deck permit costs in Lincoln

Minimum building permit fee: 'The minimum fee starts at $65 and increases from there.'

How to apply in Lincoln

General guide, not specific to this office

What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Lincoln Building and Safety (Planning and Development Services / Planning Department)

Deck Permit in Lincoln compared with nearby Nebraska localities

LocalityPermit needed?ThresholdWhat each Nebraska schedule saysVerified
LincolnPermit requiredAny sizeMinimum building permit fee: 'The minimum fee starts at $65 and increases from there.'
OmahaPermit requiredAny sizeValuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation, $41.00

Permitting activity in Lincoln

In 2025, Lincoln authorized permits for 2,215 new residential housing units (859 single-family, 1,356 in multi-family buildings), valued at $476M, up from 1,730 the year before. That works out to about 7.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 290,505.

What else needs a permit in Lincoln

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsWhen the remodel replaces, relocates or changes the type of a plumbing fixture, adds or...Plumbing Fees page: $8 per fixture (Water Closet or Urinal, Lavatory, Bathtub, Shower)
Electrical PermitIt dependsBefore installing, altering or adding to any electrical equipment, other than...Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'): BASE FEE $30
EV Charger PermitPermit requiredAny sizeElectrical Fees page: BASE FEE $30
Fence PermitIt dependsfence height; corner-lot and driveway/alley fences also need a Public Works sight-distance reviewNot published
HVAC PermitIt dependsBefore installing, replacing, altering or removing a furnace, air conditioner, heat...Mechanical Fees page ('Fees are subject to change with each code cycle.'): Gas Furnace $40
Plumbing PermitIt dependsBefore installing, altering or repairing plumbing or drainage, including replacing or...See schedule
Pool PermitIt dependsprefabricated, temporary pools only; any other pool needs a building permitSee schedule
Roof Replacement PermitIt dependsre-shingling over solid sheathing is exempt; rot repair or new sheathing needs a permitNot published
Shed PermitPermit requiredAny sizeMinimum building permit fee: 'The minimum fee starts at $65 and increases from there.'
Solar PermitPermit requiredAny sizeElectrical Fees page: BASE FEE $30 plus per-item charges
Water Heater PermitPermit requiredAny sizePlumbing Fees page: 'Water Heater Electric' $8

Frequently asked questions

Do you need a deck permit in Lincoln?
Yes, before building any deck. If you are unsure how that applies to your project, call the permit office at 402-441-7521 before you start.
How much does a deck permit cost in Lincoln?
The fee wording from the official schedule is in the cost table on this page, as we read it on 3 Oct 2026. For the figure on your own project, call the permit office at 402-441-7521.
Where do you apply for a deck permit in Lincoln?
You can apply through the Lincoln permit portal or contact the City of Lincoln Building and Safety (Planning and Development Services / Planning Department) directly. The links are listed on this page.
Can a homeowner pull a deck permit themselves in Lincoln?
Under Nebraska law (Neb. Rev. Stat. 81-2121(5); 48-2104(1)): Nebraska lets owners work on their own property. The State Electrical Act does not prohibit an owner from doing electrical work on a principal residence no larger than a single-family dwelling, or on farm property, and does not require that owner to be licensed (commercial, industrial, and public-use installations excluded). The Contractor Registration Act likewise says a person who works on, or has work performed on, his or her own property is not a contractor and need not register (48-2104). Whether the owner may pull the local building permit is decided by the county, city, or village; no state owner-builder disclosure form or resale restriction was found. Confirm how Lincoln applies this before you apply.

From the Library

Deck Permit in other Nebraska localities

Everything above, sourced

How this deck permit page for Lincoln was verified. 2 official sources: lincoln.ne.gov, lincoln.ne.gov. Last checked by Mario Bailey, not confirmed with City of Lincoln Building and Safety (Planning and Development Services / Planning Department). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project