Electrical Permit in Lincoln, Nebraska
It depends
Sometimes, depending on the project
Before installing, altering or adding to any electrical equipment, other than like-for-like replacement with no wiring change.
Quick answer
Lincoln requires an electrical permit from the Building Official for any installation, alteration or addition to electrical equipment, issued only to registered electrical contractors or qualifying homeowners. Exempt work includes routine like-for-like replacement of apparatus with no wiring changes, same-rating replacement of motors or fixed appliances in the same location, and low-voltage work at 50 volts or less (except alarm systems). Homeowners may install branch-circuit and feeder wiring in a detached single-family home they own and occupy, but not service equipment.
- Issued by
- City of Lincoln Building and Safety (Planning and Development Services / Planning Department)
- Phone
- 402-441-7521
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Lincoln
- Published in
- Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'):
- BASE FEE $30;
- Service(s) 0-200 amperes $30;
- Branch Circuits & Feeders, new, extensions, or modifications of each $6;
- work 3 to 8 miles beyond city limits $15, beyond 8 miles $30.
- A separate City/County Homeowners Fees tab exists.
How to apply in Lincoln
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Lincoln Building and Safety (Planning and Development Services / Planning Department)
- 555 S 10th St, Suite 203, Lincoln, NE 68508
- Phone: 402-441-7521
- Email: plandev@lincoln.ne.gov
Electrical Permit in Lincoln compared with nearby Nebraska localities
| Locality | Permit needed? | Threshold | What each Nebraska schedule says | Verified |
|---|---|---|---|---|
| Lincoln | It depends | Before installing, altering or adding to any electrical equipment, other than... | Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'): BASE FEE $30 | |
| Omaha | Permit required | Any size | Omaha Municipal Code Sec. 44-130: minimum fee on all electrical work $25.00 |
Your Electrical Permit checklist for Lincoln
- Confirm the requirement. Sometimes, depending on the project. Read the rule where we read it: lincoln.ne.gov: Building Safety.
- Budget the fee. We have no fee schedule to link for this office, so ask it to price your project.
- Apply. Start at the Lincoln permit portal.
- Keep the office details handy. City of Lincoln Building and Safety (Planning and Development Services / Planning Department). Phone: 402-441-7521. Email: plandev@lincoln.ne.gov. Address: 555 S 10th St, Suite 203, Lincoln, NE 68508.
Compiled from the official sources on this page. Last checked .
Permitting activity in Lincoln
In 2025, Lincoln authorized permits for 2,215 new residential housing units (859 single-family, 1,356 in multi-family buildings), valued at $476M, up from 1,730 the year before. That works out to about 7.6 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 290,505.
What else needs a permit in Lincoln
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | When the remodel replaces, relocates or changes the type of a plumbing fixture, adds or... | Plumbing Fees page: $8 per fixture (Water Closet or Urinal, Lavatory, Bathtub, Shower) |
| Deck Permit | Permit required | Any size | Minimum building permit fee: 'The minimum fee starts at $65 and increases from there.' |
| EV Charger Permit | Permit required | Any size | Electrical Fees page: BASE FEE $30 |
| Fence Permit | It depends | fence height; corner-lot and driveway/alley fences also need a Public Works sight-distance review | Not published |
| HVAC Permit | It depends | Before installing, replacing, altering or removing a furnace, air conditioner, heat... | Mechanical Fees page ('Fees are subject to change with each code cycle.'): Gas Furnace $40 |
| Plumbing Permit | It depends | Before installing, altering or repairing plumbing or drainage, including replacing or... | See schedule |
| Pool Permit | It depends | prefabricated, temporary pools only; any other pool needs a building permit | See schedule |
| Roof Replacement Permit | It depends | re-shingling over solid sheathing is exempt; rot repair or new sheathing needs a permit | Not published |
| Shed Permit | Permit required | Any size | Minimum building permit fee: 'The minimum fee starts at $65 and increases from there.' |
| Solar Permit | Permit required | Any size | Electrical Fees page: BASE FEE $30 plus per-item charges |
| Water Heater Permit | Permit required | Any size | Plumbing Fees page: 'Water Heater Electric' $8 |
Frequently asked questions
- Do you need an electrical permit in Lincoln?
- Sometimes: before installing, altering or adding to any electrical equipment, other than like-for-like replacement with no wiring change. If you are unsure how that applies to your project, call the permit office at 402-441-7521 before you start.
- How much does an electrical permit cost in Lincoln?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 3 Oct 2026. For the figure on your own project, call the permit office at 402-441-7521.
- Where do you apply for an electrical permit in Lincoln?
- You can apply through the Lincoln permit portal or contact the City of Lincoln Building and Safety (Planning and Development Services / Planning Department) directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Lincoln?
- Under Nebraska law (Neb. Rev. Stat. 81-2121(5); 48-2104(1)): Nebraska lets owners work on their own property. The State Electrical Act does not prohibit an owner from doing electrical work on a principal residence no larger than a single-family dwelling, or on farm property, and does not require that owner to be licensed (commercial, industrial, and public-use installations excluded). The Contractor Registration Act likewise says a person who works on, or has work performed on, his or her own property is not a contractor and need not register (48-2104). Whether the owner may pull the local building permit is decided by the county, city, or village; no state owner-builder disclosure form or resale restriction was found. Confirm how Lincoln applies this before you apply.
From the Library
Electrical Permit in other Nebraska localities
Everything above, sourced
How this electrical permit page for Lincoln was verified. 2 official sources: lincoln.ne.gov, online.encodeplus.com. Last checked by Mario Bailey, not confirmed with City of Lincoln Building and Safety (Planning and Development Services / Planning Department). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page