Patio Permit in Boise, Idaho
It depends
Sometimes, depending on the project
Before pouring a concrete patio more than 12 inches above grade, or adding any patio cover.
Quick answer
Boise requires a building permit for a concrete patio more than 12 inches above grade; an at-grade slab does not need one. Any patio cover, even a small attached one, always requires a building permit because its load transfers to the dwelling's exterior wall.
- Typical threshold
- concrete patio height above grade
- Issued by
- City of Boise Planning and Development Services, Building Division
- Phone
- (208) 608-7070
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare patio contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a patio permit costs in Boise
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
Building permit fee from Table No. 1-A by valuation (e.g. "$26.37 for the first $500.00 plus $2.95 for each additional $100.00" up to $2,000.00), plus residential plan review at 20% of the building permit fee;
Boise City Building Code Fee Schedule, Oct. 2026 (FY27, effective 10-1-26).
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Boise
General guide, not specific to this office
What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Boise Planning and Development Services, Building Division
- 150 N Capitol Blvd, Boise, ID 83702
- Phone: (208) 608-7070
Patio Permit in Boise compared with nearby Idaho localities
| Locality | Permit needed? | Threshold | What each Idaho schedule says | Verified |
|---|---|---|---|---|
| Boise | It depends | concrete patio height above grade | See schedule | |
| Meridian | It depends | floor area of a detached patio cover or shade structure; attached covers always need a permit | "Covered patios / Storage Sheds - Valuation": $50.00 base fee plus $5.50 add'l for each $1,000 of project value or fraction thereof; the schedule has the rest |
Your Patio Permit checklist for Boise
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: concrete patio height above grade. Read the rule where we read it: cityofboise.org: homeowners guide.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Boise permit portal.
- Keep the office details handy. City of Boise Planning and Development Services, Building Division. Phone: (208) 608-7070. Address: 150 N Capitol Blvd, Boise, ID 83702.
Compiled from the official sources on this page. Last checked .
Permitting activity in Boise
In 2025, Boise authorized permits for 955 new residential housing units (730 single-family, 225 in multi-family buildings), valued at $239M, up from 741 the year before. That works out to about 4.2 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 229,776.
What else needs a permit in Boise
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Before removing wall coverings to the framing, building a wall, relocating fixtures, or... | Plumbing: $33.00 base fee plus $12.50 per fixture (FY27 Plumbing Code Fee Schedule) |
| Deck Permit | It depends | deck height above grade at any point | See schedule |
| Electrical Permit | Permit required | Any size | Single branch circuit: $57.00 (Table 2-b) |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | fence height | See schedule |
| HVAC Permit | Permit required | Any size | Single fixture or appliance (including furnaces, air conditioners, mini-split systems): $57.00 (Table B(3) Miscellaneous Residential Mechanical Fees) |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | prefabricated pools only; in-ground and deeper pools need a permit | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | It depends | floor area of a one-story detached accessory structure | See schedule |
| Solar Permit | Permit required | Any size | Residential Solar Photovoltaic Systems plan review/inspections building permit fee: $171, plus a separate electrical permit; the schedule has the rest |
| Water Heater Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a patio permit in Boise?
- It depends on the project. Concrete patio height above grade. If you are unsure how that applies to your project, call the City of Boise Planning and Development Services, Building Division at (208) 608-7070 before you start.
- How much does a patio permit cost in Boise?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 3 Oct 2026. For the figure on your own project, call the City of Boise Planning and Development Services, Building Division at (208) 608-7070.
- Where do you apply for a patio permit in Boise?
- You can apply through the Boise permit portal or contact the City of Boise Planning and Development Services, Building Division directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Boise?
- Under Idaho law (Idaho Code 54-5205(2)(l); 54-5209; 54-1016(2)(a); 54-2602(1)(a); 54-5002(1)(a)): Idaho homeowners may do their own work. The Idaho Contractor Registration Act exempts an owner building on their own residential property, whether or not they live there. That exemption does not cover an owner who builds in order to promptly sell, unless they have lived in the home as their primary residence for at least 12 months before the sale. The trade laws carry their own owner exemptions: a property owner may do noncommercial electrical work in their own primary or secondary residence (54-1016(2)(a)), and an owner or contract purchaser may do their own plumbing (54-2602(1)(a)) and HVAC work (54-5002(1)(a)) in a single-family home or duplex, but must still meet the code and get the permit. A permit issued to an exempt owner is marked "no contractor registration provided" (54-5209). Confirm how Boise applies this before you apply.
From the Library
Patio Permit in other Idaho localities
Everything above, sourced
How this patio permit page for Boise was verified. 1 official source: cityofboise.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Boise Planning and Development Services, Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page