Idaho / Boise

Deck Permit in Boise, Idaho

It depends

Sometimes, depending on the project

Before building a deck more than 12 inches above grade.

Quick answer

Boise requires a building permit when a wooden deck is more than 12 inches above grade. The City's residential code also limits the exemption to decks that do not serve the exit door required by IRC Section R311.4, so a low deck at the required egress door still needs a permit.

Diagram of the 12 in above grade deck height above grade threshold for a deck permit in Boise, Idaho
Threshold illustrated: 12 in above grade. Whether Boise requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-10-03.
Typical threshold
deck height above grade at any point
Issued by
City of Boise Planning and Development Services, Building Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.

Compare deck contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a deck permit costs in Boise

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .

Building permit fee from Table No. 1-A by valuation (e.g. "$26.37 for the first $500.00 plus $2.95 for each additional $100.00" up to $2,000.00), plus residential plan review at 20% of the building permit fee;

Boise City Building Code Fee Schedule, Oct. 2026 (FY27, effective 10-1-26).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Boise

General guide, not specific to this office

What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Boise Planning and Development Services, Building Division

  • 150 N Capitol Blvd, Boise, ID 83702
  • Phone: (208) 608-7070

Deck Permit in Boise compared with nearby Idaho localities

LocalityPermit needed?ThresholdWhat each Idaho schedule saysVerified
BoiseIt dependsdeck height above grade at any pointSee schedule
MeridianIt dependsdeck height above grade at any point; also must be 200 sq ft or less, detached from the dwelling and not serving the required exit doorSee schedule

Permitting activity in Boise

In 2025, Boise authorized permits for 955 new residential housing units (730 single-family, 225 in multi-family buildings), valued at $239M, up from 741 the year before. That works out to about 4.2 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 229,776.

What else needs a permit in Boise

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsBefore removing wall coverings to the framing, building a wall, relocating fixtures, or...Plumbing: $33.00 base fee plus $12.50 per fixture (FY27 Plumbing Code Fee Schedule)
Electrical PermitPermit requiredAny sizeSingle branch circuit: $57.00 (Table 2-b)
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsfence heightSee schedule
HVAC PermitPermit requiredAny sizeSingle fixture or appliance (including furnaces, air conditioners, mini-split systems): $57.00 (Table B(3) Miscellaneous Residential Mechanical Fees)
Patio PermitIt dependsconcrete patio height above gradeSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsprefabricated pools only; in-ground and deeper pools need a permitSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsfloor area of a one-story detached accessory structureSee schedule
Solar PermitPermit requiredAny sizeResidential Solar Photovoltaic Systems plan review/inspections building permit fee: $171, plus a separate electrical permit; the schedule has the rest
Water Heater PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a deck permit in Boise?
It depends on the project. Deck height above grade at any point. If you are unsure how that applies to your project, call the City of Boise Planning and Development Services, Building Division at (208) 608-7070 before you start.
How much does a deck permit cost in Boise?
The fee wording from the official schedule is in the cost table on this page, as we read it on 3 Oct 2026. For the figure on your own project, call the City of Boise Planning and Development Services, Building Division at (208) 608-7070.
Where do you apply for a deck permit in Boise?
You can apply through the Boise permit portal or contact the City of Boise Planning and Development Services, Building Division directly. The links are listed on this page.
Can a homeowner pull a deck permit themselves in Boise?
Under Idaho law (Idaho Code 54-5205(2)(l); 54-5209; 54-1016(2)(a); 54-2602(1)(a); 54-5002(1)(a)): Idaho homeowners may do their own work. The Idaho Contractor Registration Act exempts an owner building on their own residential property, whether or not they live there. That exemption does not cover an owner who builds in order to promptly sell, unless they have lived in the home as their primary residence for at least 12 months before the sale. The trade laws carry their own owner exemptions: a property owner may do noncommercial electrical work in their own primary or secondary residence (54-1016(2)(a)), and an owner or contract purchaser may do their own plumbing (54-2602(1)(a)) and HVAC work (54-5002(1)(a)) in a single-family home or duplex, but must still meet the code and get the permit. A permit issued to an exempt owner is marked "no contractor registration provided" (54-5209). Confirm how Boise applies this before you apply.

From the Library

Deck Permit in other Idaho localities

Everything above, sourced

How this deck permit page for Boise was verified. 1 official source: cityofboise.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Boise Planning and Development Services, Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project