Plumbing Permit in Boise, Idaho
Permit required
Yes, a permit is required
Before repairing, replacing, relocating or adding to piping or fixtures.
Issued byCity of Boise Planning and Development Services, Building Division
By Mario Bailey, verified against official sources
- Permit fee
- $33.00
- from the published schedule
Quick answer
Boise requires a plumbing permit, issued by the City, to repair, replace, relocate or add to the piping system in a home, install new fixtures such as toilets, sinks, showers, tubs and dishwashers, install or replace a water heater, or replumb pipes. Replacing an existing fixture needs a permit when concealed plumbing is involved.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before repairing, replacing, relocating or adding to piping or fixtures.
What a plumbing permit costs in Boise
How to apply in Boise
In Boise, you apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- For Boise, a permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- For Boise, the application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. City of Boise Planning and Development Services, Building Division sets the exact checklist for Boise.
Where to apply in Boise:
City of Boise Planning and Development Services, Building Division
- 150 N Capitol Blvd, Boise, ID 83702
- Phone: (208) 608-7070
Inspections and closing out your permit
In Boise, plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- In Boise: piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- In Boise: rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- In Boise: rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- In Boise: the water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- In Boise: the framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- In Boise: at the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- In Boise: final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Boise permit portal or by phone at (208) 608-7070.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Boise
- Confirm the requirement. Yes, a permit is required. Usually needed: Before repairing, replacing, relocating or adding to piping or fixtures.
- Budget the fee. $33.00 base permit fee plus $12.50 each per fixture (e.g. sinks, water closets, bathtubs and/or showers); sewer or water service only $57.00. FY27 Plumbing Code Fee Schedule, Oct. 2026. Official fee schedule.
- Apply. In Boise, you apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Boise permit portal.
- Keep the office details handy. City of Boise Planning and Development Services, Building Division. Phone: (208) 608-7070. Address: 150 N Capitol Blvd, Boise, ID 83702.
- Plan for inspections. In Boise, plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a plumbing permit in Boise?
- Boise requires a plumbing permit, issued by the City, to repair, replace, relocate or add to the piping system in a home, install new fixtures such as toilets, sinks, showers, tubs and dishwashers, install or replace a water heater, or replumb pipes. Replacing an existing fixture needs a permit when concealed plumbing is involved. Always confirm with the City of Boise Planning and Development Services, Building Division before starting.
- How much does a plumbing permit cost in Boise?
- $33.00 base permit fee plus $12.50 each per fixture (e.g. sinks, water closets, bathtubs and/or showers); sewer or water service only $57.00. FY27 Plumbing Code Fee Schedule, Oct. 2026. See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in Boise?
- You can apply through the Boise permit portal or contact the City of Boise Planning and Development Services, Building Division directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in Boise?
- Under Idaho law (Idaho Code 54-5205(2)(l); 54-5209; 54-1016(2)(a); 54-2602(1)(a); 54-5002(1)(a)): Idaho homeowners may do their own work. The Idaho Contractor Registration Act exempts an owner building on their own residential property, whether or not they live there. That exemption does not cover an owner who builds in order to promptly sell, unless they have lived in the home as their primary residence for at least 12 months before the sale. The trade laws carry their own owner exemptions: a property owner may do noncommercial electrical work in their own primary or secondary residence (54-1016(2)(a)), and an owner or contract purchaser may do their own plumbing (54-2602(1)(a)) and HVAC work (54-5002(1)(a)) in a single-family home or duplex, but must still meet the code and get the permit. A permit issued to an exempt owner is marked "no contractor registration provided" (54-5209). Confirm how Boise applies this before you apply.
From the Library
What else needs a permit in Boise
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Before removing wall coverings to the framing, building a wall, relocating fixtures, or... | Plumbing: $33.00 base fee plus $12.50 per fixture (FY27 Plumbing Code Fee Schedule) |
| Deck Permit | It depends | deck height above grade at any point | Building permit fee from Table No. 1-A by valuation (e.g |
| Electrical Permit | Permit required | Any size | Single branch circuit: $57.00 (Table 2-b) |
| EV Charger Permit | Permit required | Any size | ...but not limited to, wall heaters, residential electric car outlets" $57.00 (Table... |
| Fence Permit | It depends | fence height | Building permit fee from Table No. 1-A by valuation (e.g |
| HVAC Permit | Permit required | Any size | ...or appliance (including furnaces, air conditioners, mini-split systems): $57.00... |
| Patio Permit | It depends | concrete patio height above grade | Building permit fee from Table No. 1-A by valuation (e.g |
| Pool Permit | It depends | prefabricated pools only; in-ground and deeper pools need a permit | Building permit fee from Table No. 1-A by valuation (e.g |
| Roof Replacement Permit | Permit required | Any size | Building permit fee from Table No. 1-A by valuation (e.g |
| Shed Permit | It depends | floor area of a one-story detached accessory structure | Building permit fee from Table No. 1-A by valuation (e.g |
| Solar Permit | Permit required | Any size | ...Solar Photovoltaic Systems plan review/inspections building permit fee: $171, plus... |
| Water Heater Permit | Permit required | Any size | Plumbing: $33.00 base fee plus "Water heaters $12.50 Each" (FY27 Plumbing Code Fee... |
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Boise documents; the office above sets the local rules.
How this plumbing permit page for Boise was verified. 1 official source: cityofboise.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Boise Planning and Development Services, Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Plumbing Permit requirements across Idaho localities