Patio Permit in Chicago, Illinois
It depends
Sometimes, depending on the project
When the patio is more than 30 inches above adjacent grade, over a basement or story below, or in or on the public way
Quick answer
Chicago does not require a building permit to install, alter, or remove a noncombustible (concrete or brick) patio that is not located in or on the public way, not more than 30 inches above adjacent grade, and not over any basement or story below. The work must still comply with the Chicago Construction Codes, and the exemption may not apply to a Chicago Landmark or a property in a landmark district. A patio outside those limits is not covered by this exemption.
- Typical threshold
- installing, altering, or removing a noncombustible (concrete or brick) patio that is not located in or on the public way, not more than 30 inches above adjacent grade, and not over any basement or story below needs no building permit
- Median to issue
- 57 daysall renovation and alteration permits, 5,329 records
- Issued by
- Chicago Department of Buildings
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare patio contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a patio permit costs in Chicago
- Permit fee
- Not published
Chicago publishes no fee for this permit type in a schedule we can verify. Ask Chicago Department of Buildings how the fee is calculated for your project.
How to apply in Chicago
General guide, not specific to this office
What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Chicago Department of Buildings
- 121 N. LaSalle St., 9th Floor, Chicago, IL 60602
- Email: dob-info@cityofchicago.org
Patio Permit in Chicago compared with nearby Illinois localities
| Locality | Permit needed? | Threshold | What each Illinois schedule says | Verified |
|---|---|---|---|---|
| Chicago | It depends | installing, altering, or removing a noncombustible (concrete or brick) patio that is not located in or on the public way, not more than 30 inches above adjacent grade, and not over any basement or story below needs no building permit | Not published | |
| Cook County | Permit required | Any size | See schedule |
Your Patio Permit checklist for Chicago
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: installing, altering, or removing a noncombustible (concrete or brick) patio that is not located in or on the public way, not more than 30 inches above adjacent grade, and not over any basement or story below needs no building permit. Read the rule where we read it: chicago.gov: masonry.
- Apply. Start at the Chicago permit portal.
- Keep the office details handy. Chicago Department of Buildings. Email: dob-info@cityofchicago.org. Address: 121 N. LaSalle St., 9th Floor, Chicago, IL 60602.
Compiled from the official sources on this page. Last checked .
Permitting activity in Chicago
In 2025, Chicago authorized permits for 3,916 new residential housing units (371 single-family, 3,545 in multi-family buildings), valued at $1.0B, down from 4,371 the year before. That works out to about 1.5 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 2,677,643.
About Chicago
Chicago has about 1,268,199 housing units. The median home is valued at $315,200, against a median household income of $75,134. About 46% of homes are owner-occupied, and the typical home was built around 1952.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
What else needs a permit in Chicago
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Finish work without plumbing or electrical connections is exempt; plumbing, electrical or wall changes need a permit | See schedule |
| Deck Permit | Permit required | Any size | A new deck no more than 6 feet above the ground is a stand-alone permit at $300 per structure under Table 14A-12-1204.2 of the Municipal Code of Chicago |
| Electrical Permit | Permit required | Any size | Repair or alteration of devices on existing electrical circuits is $75 per service disconnecting means; the schedule has the rest |
| EV Charger Permit | It depends | A new circuit for a charger needs an electrical permit; plugging cord-and-plug equipment into an existing receptacle does not | Table 14A-12-1204.2 Stand-Alone Permit Fees effective January 1, 2027: "Installation of up to 10 new circuits on a single service disconnecting means" $160 |
| Fence Permit | It depends | no building permit to install a fence that is no more than 5 feet above the ground (measured on both sides) and conforms to the Chicago Zoning Ordinance; taller fences need a permit | Flat $75 to install a fence up to 6 feet high, any length, any material except masonry, and $300 for a fence over 6 feet high; the schedule has the rest |
| HVAC Permit | It depends | in a residential building up to 4 stories above grade, in-kind repair or replacement of a boiler, furnace, or air conditioning appliance does not need a building permit; a new heat pump or air conditioning system, or a replacement that is not in-kind, needs a permit | See schedule |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | pools with water depth greater than 48 inches on a lot with 1 to 3 residential units require a full building permit with licensed architect or engineer plans; shallower pools with volume under 5000 gallons may be exempt | Flat $400 to install a private swimming pool or hot tub per Table 14A-12-1204.2 of the Municipal Code of Chicago, with electrical work as a separate permit |
| Roof Replacement Permit | It depends | on a residential building up to 4 stories above grade, roof repair, recover, or replacement on a roof with a pitch of at least 2:12 needs no permit; on any building, roof repair limited to 25% of the area of a roof surface, such as patching, that does not involve cutting away or removal of part of an exterior wall or roof needs no permit; a building permit is required for any structural repair and any work on low-slope roofs | No permit to repair, recover or replace a pitched roof of at least 2:12 slope on a residential building up to 4 stories per chicago.gov |
| Shed Permit | It depends | single-story detached structure not more than 15 feet tall, without plumbing, used as a tool or storage shed, with a footprint of 150 square feet or less does not require a building permit | See schedule |
| Solar Permit | Permit required | Any size | Flat $225 for a solar panel installation of less than 13.44 kW, with or without an energy storage system of up to 20 kWh; the schedule has the rest |
| Water Heater Permit | It depends | Height of the residential building for an in-kind water heater repair or replacement | See schedule |
Frequently asked questions
- Do you need a patio permit in Chicago?
- It depends on the project. Installing, altering, or removing a noncombustible (concrete or brick) patio that is not located in or on the public way, not more than 30 inches above adjacent grade, and not over any basement or story below needs no building permit. If you are unsure how that applies to your project, write to the Chicago Department of Buildings at dob-info@cityofchicago.org before you start.
- How much does a patio permit cost in Chicago?
- We found no published fee for a patio permit in Chicago. To learn how it is calculated for your project, write to the Chicago Department of Buildings at dob-info@cityofchicago.org.
- How long does a patio permit take in Chicago?
- Across 5,329 recent renovation and alteration permit records in Chicago, the median time to issue was 57 days. Individual projects vary with scope and office workload, so confirm with the office.
- Where do you apply for a patio permit in Chicago?
- You can apply through the Chicago permit portal or contact the Chicago Department of Buildings directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Chicago?
- Under Illinois law (225 ILCS 320/3): Whether an owner can pull a building permit is a municipal question in Illinois; there is no state building-permit statute. At the state level, the Plumbing License Law requires that 'all plumbing shall be performed only by plumbers licensed under the provisions of this Act,' but exempts owner-occupants (and lessee-occupants) of single-family residences doing their own plumbing, provided the work meets Illinois State Plumbing Code minimum standards, is submitted for inspection by the Department or local unit, uses no unlicensed helpers ('shall not employ other than a plumber licensed pursuant to this Act to assist'), and the occupant has 'a current intention to live in such premises as his or her bona fide sole and exclusive residence for a period of not less than 6 months after the completion of the plumbing work.' Confirm how Chicago applies this before you apply.
How the 57 days break down
Application filed
Review
The records give one figure for the whole wait, not for each step inside it.
Permit issued
Median across 5,329renovation and alteration permit records in the last 12 months. Half were faster, half slower.
From the Library
Patio Permit in other Illinois localities
Everything above, sourced
How this patio permit page for Chicago was verified. 2 official sources: chicago.gov, chicago.gov. Last checked by Mario Bailey, not confirmed with Chicago Department of Buildings. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page