Bathroom Remodel Permit in Chicago, Illinois
It depends
Sometimes, depending on the project
Before any bathroom work that touches plumbing, electrical or walls; finish work alone (paint, tile, cabinets, countertops) needs no permit.
Quick answer
Chicago's Department of Buildings exempts painting, wallpapering, tiling, carpeting, installing cabinets or countertops and similar finish work, without plumbing or electrical connections, from the building permit. Removing and reinstalling a toilet and clearing a stoppage or repairing a leak without replacing pipes or fixtures are also exempt. Replacing fixtures, replacing pipe, adding fixtures or circuits, or moving walls requires a permit; most single-unit nonstructural remodels up to 2,000 square feet qualify for the online Express Permit Program, and walls or doorways may be reconfigured only with drawings by an Illinois-licensed architect or structural engineer.
- Typical threshold
- Finish work without plumbing or electrical connections is exempt; plumbing, electrical or wall changes need a permit
- Median to issue
- 57 daysall renovation and alteration permits, 5,329 records
- Issued by
- Chicago Department of Buildings
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.
Compare bathroom remodel quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a bathroom remodel permit costs in Chicago
- Fee schedule in force
- Official scheduleRead .
- Published in
- Table 14A-12-1204.2 Stand-Alone Permit Fees effective January 1, 2027 (issued September 28, 2026):
- "Interior alteration up to 500 square feet in floor area, with no change of occupancy and no change to load-bearing elements or means of egress" $265;
- "Repair or in-kind replacement of hot water heater (individual equipment) or plumbing fixtures without alteration to plumbing in walls" $80 per dwelling unit, toilet room, or tenant space.
- The 2026 table in force today could not be read (bot wall).
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Chicago
General guide, not specific to this office
What a bathroom remodel permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a bathroom remodel permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Chicago Department of Buildings
- 121 N. LaSalle St., 9th Floor, Chicago, IL 60602
- Email: dob-info@cityofchicago.org
Your Bathroom Remodel Permit checklist for Chicago
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: Finish work without plumbing or electrical connections is exempt; plumbing, electrical or wall changes need a permit. Read the rule where we read it: chicago.gov: all.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Chicago permit portal.
- Keep the office details handy. Chicago Department of Buildings. Email: dob-info@cityofchicago.org. Address: 121 N. LaSalle St., 9th Floor, Chicago, IL 60602.
Compiled from the official sources on this page. Last checked .
Permitting activity in Chicago
In 2025, Chicago authorized permits for 3,916 new residential housing units (371 single-family, 3,545 in multi-family buildings), valued at $1.0B, down from 4,371 the year before. That works out to about 1.5 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 2,677,643.
About Chicago
Chicago has about 1,268,199 housing units. The median home is valued at $315,200, against a median household income of $75,134. About 46% of homes are owner-occupied, and the typical home was built around 1952.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
What else needs a permit in Chicago
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | A new deck no more than 6 feet above the ground is a stand-alone permit at $300 per structure under Table 14A-12-1204.2 of the Municipal Code of Chicago |
| Electrical Permit | Permit required | Any size | Repair or alteration of devices on existing electrical circuits is $75 per service disconnecting means; the schedule has the rest |
| EV Charger Permit | It depends | A new circuit for a charger needs an electrical permit; plugging cord-and-plug equipment into an existing receptacle does not | Table 14A-12-1204.2 Stand-Alone Permit Fees effective January 1, 2027: "Installation of up to 10 new circuits on a single service disconnecting means" $160 |
| Fence Permit | It depends | no building permit to install a fence that is no more than 5 feet above the ground (measured on both sides) and conforms to the Chicago Zoning Ordinance; taller fences need a permit | Flat $75 to install a fence up to 6 feet high, any length, any material except masonry, and $300 for a fence over 6 feet high; the schedule has the rest |
| HVAC Permit | It depends | in a residential building up to 4 stories above grade, in-kind repair or replacement of a boiler, furnace, or air conditioning appliance does not need a building permit; a new heat pump or air conditioning system, or a replacement that is not in-kind, needs a permit | See schedule |
| Patio Permit | It depends | installing, altering, or removing a noncombustible (concrete or brick) patio that is not located in or on the public way, not more than 30 inches above adjacent grade, and not over any basement or story below needs no building permit | Not published |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | pools with water depth greater than 48 inches on a lot with 1 to 3 residential units require a full building permit with licensed architect or engineer plans; shallower pools with volume under 5000 gallons may be exempt | Flat $400 to install a private swimming pool or hot tub per Table 14A-12-1204.2 of the Municipal Code of Chicago, with electrical work as a separate permit |
| Roof Replacement Permit | It depends | on a residential building up to 4 stories above grade, roof repair, recover, or replacement on a roof with a pitch of at least 2:12 needs no permit; on any building, roof repair limited to 25% of the area of a roof surface, such as patching, that does not involve cutting away or removal of part of an exterior wall or roof needs no permit; a building permit is required for any structural repair and any work on low-slope roofs | No permit to repair, recover or replace a pitched roof of at least 2:12 slope on a residential building up to 4 stories per chicago.gov |
| Shed Permit | It depends | single-story detached structure not more than 15 feet tall, without plumbing, used as a tool or storage shed, with a footprint of 150 square feet or less does not require a building permit | See schedule |
| Solar Permit | Permit required | Any size | Flat $225 for a solar panel installation of less than 13.44 kW, with or without an energy storage system of up to 20 kWh; the schedule has the rest |
| Water Heater Permit | It depends | Height of the residential building for an in-kind water heater repair or replacement | See schedule |
Frequently asked questions
- Do you need a bathroom remodel permit in Chicago?
- It depends on the project. Finish work without plumbing or electrical connections is exempt; plumbing, electrical or wall changes need a permit. If you are unsure how that applies to your project, write to the Chicago Department of Buildings at dob-info@cityofchicago.org before you start.
- How much does a bathroom remodel permit cost in Chicago?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 2 Nov 2026. For the figure on your own project, write to the Chicago Department of Buildings at dob-info@cityofchicago.org.
- How long does a bathroom remodel permit take in Chicago?
- Across 5,329 recent renovation and alteration permit records in Chicago, the median time to issue was 57 days. Individual projects vary with scope and office workload, so confirm with the office.
- Where do you apply for a bathroom remodel permit in Chicago?
- You can apply through the Chicago permit portal or contact the Chicago Department of Buildings directly. The links are listed on this page.
- Can a homeowner pull a bathroom remodel permit themselves in Chicago?
- Under Illinois law (225 ILCS 320/3): Whether an owner can pull a building permit is a municipal question in Illinois; there is no state building-permit statute. At the state level, the Plumbing License Law requires that 'all plumbing shall be performed only by plumbers licensed under the provisions of this Act,' but exempts owner-occupants (and lessee-occupants) of single-family residences doing their own plumbing, provided the work meets Illinois State Plumbing Code minimum standards, is submitted for inspection by the Department or local unit, uses no unlicensed helpers ('shall not employ other than a plumber licensed pursuant to this Act to assist'), and the occupant has 'a current intention to live in such premises as his or her bona fide sole and exclusive residence for a period of not less than 6 months after the completion of the plumbing work.' Confirm how Chicago applies this before you apply.
How the 57 days break down
Application filed
Review
The records give one figure for the whole wait, not for each step inside it.
Permit issued
Median across 5,329renovation and alteration permit records in the last 12 months. Half were faster, half slower.
From the Library
Everything above, sourced
How this bathroom remodel permit page for Chicago was verified. 1 official source: chicago.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Chicago Department of Buildings. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page