Illinois / Chicago

Bathroom Remodel Permit in Chicago, Illinois

It depends

We could not confirm this

Based on building code Verified

Issued byChicago Department of Buildings

By Mario Bailey, verified against official sources

Median to issue
57 days
5,329 records
Typical job value
$118,600
declared valuation

Quick answer

Permit triggers are set by each municipality's ordinance; there is no state building-permit rule. At the state level, the Illinois Plumbing Code applies to 'any remodeling or renovation that alters, renovates or replaces existing plumbing or plumbing systems' (890.110), and the Plumbing License Law excludes from the definition of plumbing 'minor repairs which do not require changes in the piping,' so like-for-like fixture service sits differently under state law than relocating piping, which is licensed plumbing work subject to the state code. Structural, wall, and electrical permit thresholds are purely local.

Who is pulling this permit?

Hire it out

Sponsored

Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.

Compare bathroom remodel quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a bathroom remodel permit costs in Chicago

Line item
bathroom remodel permitBy formulaNonstructural interior remodel up to 500 sq ft with no occupancy or load-bearing change is a flat $250 stand-alone fee per Table 14A-12-1204.2; larger remodels take higher brackets or the calculated permit formula.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Chicago

In Chicago, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.

What most bathroom remodel permit applications include:

  • Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
  • For Chicago, the permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
  • Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
  • For Chicago, a bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
  • New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
  • Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
  • Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).

General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. Chicago Department of Buildings sets the exact checklist for Chicago.

Where to apply in Chicago:

Chicago Department of Buildings

Inspections and closing out your permit

In Chicago, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.

  1. In Chicago: any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
  2. In Chicago: the plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
  3. In Chicago: work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
  4. Scheduling is on the permit holder in Chicago: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
  5. In Chicago: a final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Chicago permit portal.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Chicago

In 2024, Chicago authorized permits for 4,371 new residential housing units (325 single-family, 4,046 in multi-family buildings), valued at $1.1B, up from 3,616 the year before. That works out to about 1.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 2,677,643.

About Chicago

Chicago has about 1,268,199 housing units. The median home is valued at $315,200, against a median household income of $75,134. About 46% of homes are owner-occupied, and the typical home was built around 1952.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a bathroom remodel permit in Chicago?
Permit triggers are set by each municipality's ordinance; there is no state building-permit rule. At the state level, the Illinois Plumbing Code applies to 'any remodeling or renovation that alters, renovates or replaces existing plumbing or plumbing systems' (890.110), and the Plumbing License Law excludes from the definition of plumbing 'minor repairs which do not require changes in the piping,' so like-for-like fixture service sits differently under state law than relocating piping, which is licensed plumbing work subject to the state code. Structural, wall, and electrical permit thresholds are purely local. Always confirm with the Chicago Department of Buildings before starting.
How much does a bathroom remodel permit cost in Chicago?
Nonstructural interior remodel up to 500 sq ft with no occupancy or load-bearing change is a flat $250 stand-alone fee per Table 14A-12-1204.2; larger remodels take higher brackets or the calculated permit formula. See the official fee schedule for current amounts.
How long does a bathroom remodel permit take in Chicago?
Across 5,329 recent residential permit records in Chicago, the median time to issue was 57 days. Individual projects vary with scope and office workload, so confirm with the office.
Where do you apply for a bathroom remodel permit in Chicago?
You can apply through the Chicago permit portal or contact the Chicago Department of Buildings directly. The links are listed on this page.
Can a homeowner pull a bathroom remodel permit themselves in Chicago?
Under Illinois law (225 ILCS 320/3): Whether an owner can pull a building permit is a municipal question in Illinois; there is no state building-permit statute. At the state level, the Plumbing License Law requires that 'all plumbing shall be performed only by plumbers licensed under the provisions of this Act,' but exempts owner-occupants (and lessee-occupants) of single-family residences doing their own plumbing, provided the work meets Illinois State Plumbing Code minimum standards, is submitted for inspection by the Department or local unit, uses no unlicensed helpers ('shall not employ other than a plumber licensed pursuant to this Act to assist'), and the occupant has 'a current intention to live in such premises as his or her bona fide sole and exclusive residence for a period of not less than 6 months after the completion of the plumbing work.' Confirm how Chicago applies this before you apply.

How the 57 days break down

Day 0

Application filed

Submitted through the permit portal, with the fee due at submission.

Day 1–56

Review

A correction request restarts this leg, which is the single largest reason a permit takes longer than the median.

Day 57

Permit issued

Median across 5,329residential permit records in the last 12 months. Half were faster, half slower.

After

Inspections

The sequence in the checklist above. Work that is covered up before its inspection generally has to be reopened.

From the Library

What else needs a permit in Chicago

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedInstallation or alteration of a deck is $250 per dwelling unit served under the 2026...
Electrical PermitPermit requiredNot specifiedTiered stand-alone schedule: repair or alteration of devices on existing circuits is $75...
EV Charger PermitIt dependsNot specifiedNot published
Fence PermitIt dependsfence 5 ft or less in height on private residential property does not require a permit; fences over 5 ft require a permitFlat $150 for a nonmasonry fence up to 6 ft high per Table 14A-12-1204.2
HVAC PermitPermit requiredNot specifiedNo permit to repair or in-kind replace a furnace, boiler or AC in a residential building...
Patio PermitIt dependsat-grade noncombustible (concrete or brick) patios not more than 30 inches above adjacent grade, not over a basement or story below, and not in the public way are exempt; taller, over-basement, public-way, or roofed/covered patios require a permitNot published
Plumbing PermitPermit requiredNot specifiedRepair or in-kind fixture replacement without altering in-wall plumbing is $75 per...
Pool PermitIt dependspools with water depth greater than 48 inches on a lot with 1 to 3 residential units require a full building permit with licensed architect or engineer plans; shallower pools with volume under 5000 gallons may be exemptFlat $400 to install a private in-ground or fixed pool or hot tub per Table...
Roof Replacement PermitPermit requiredNot specifiedNo permit to repair, recover or replace a pitched roof of at least 2:12 slope on a...
Shed PermitIt dependssingle-story detached tool or storage shed under 150 sq ft and not more than 15 ft tall with no plumbing does not require a permitA single-story shed 150 sq ft or less, up to 15 ft tall with no plumbing needs no permit...
Solar PermitPermit requiredNot specifiedFlat $225 for a rooftop solar PV system under 13.44 kW per Table 14A-12-1204.2, plus a...
Water Heater PermitIt dependsNot specifiedNo permit to repair or in-kind replace a water heater in a residential building up to 4...

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Chicago documents; the office above sets the local rules.

How this bathroom remodel permit page for Chicago was verified. 1 official source: ilga.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Chicago Department of Buildings. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Bathroom Remodel Permit requirements across Illinois localities

Bathroom remodel permit rules nationwide

Look up an existing Chicago permit record

It depends
Get quotes