Plumbing Permit in Chicago, Illinois
By Mario Bailey Last checked 2026-06-17 · 2 official sources
Verified against official sources From an official sourcePermit required
Quick answer
A building permit is required in Chicago for plumbing work. Adding up to 5 water supply fixture units of demand qualifies for the Express Permit Program. Larger plumbing projects require a standard permit. A licensed plumbing contractor is required for all permitted plumbing work in Chicago.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Chicago, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
For all plumbing installations fixture additions and pipe work on residential properties
What plumbing permit costs in Chicago
Repair or in-kind fixture replacement without altering in-wall plumbing is $75 per dwelling unit, toilet room or tenant space per Table 14A-12-1204.2; larger scopes take the calculated permit formula.
How to apply in Chicago
You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Chicago Department of Buildings sets the exact checklist for Chicago.
Where to apply in Chicago:
Chicago Department of Buildings
- 121 N. LaSalle St., 9th Floor, Chicago, IL 60602
- Email: dob-info@cityofchicago.org
Inspections and closing out your permit
Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Chicago permit portal.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Chicago
- Confirm the requirement. Yes, a permit is required. Usually needed: For all plumbing installations fixture additions and pipe work on residential properties.
- Budget the fee. Repair or in-kind fixture replacement without altering in-wall plumbing is $75 per dwelling unit, toilet room or tenant space per Table 14A-12-1204.2; larger scopes take the calculated permit formula. Official fee schedule.
- Apply. You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Chicago permit portal.
- Keep the office details handy. Chicago Department of Buildings. Address: 121 N. LaSalle St., 9th Floor, Chicago, IL 60602.
- Plan for inspections. Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked 2026-06-17.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Chicago
In 2024, Chicago authorized permits for 4,371 new residential housing units (325 single-family, 4,046 in multi-family buildings), valued at $1.1B, up from3,616 the year before. That works out to about 1.6 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 2,677,643.
About Chicago
Chicago has about 1,268,199 housing units. The median home is valued at $315,200, against a median household income of $75,134. About 46% of homes are owner-occupied, and the typical home was built around 1952.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a plumbing permit in Chicago?
- A building permit is required in Chicago for plumbing work. Adding up to 5 water supply fixture units of demand qualifies for the Express Permit Program. Larger plumbing projects require a standard permit. A licensed plumbing contractor is required for all permitted plumbing work in Chicago. Always confirm with the Chicago Department of Buildings before starting.
- How much does a plumbing permit cost in Chicago?
- Repair or in-kind fixture replacement without altering in-wall plumbing is $75 per dwelling unit, toilet room or tenant space per Table 14A-12-1204.2; larger scopes take the calculated permit formula. See the official fee schedule for current amounts.
- How long does a plumbing permit take in Chicago?
- Across 5,329 recent residential permit records in Chicago, the median time to issue was 57 days. Individual projects vary with scope and office workload, so confirm with the office.
- Where do you apply for a plumbing permit in Chicago?
- You can apply through the Chicago permit portal or contact the Chicago Department of Buildings directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in Chicago?
- Under Illinois law (225 ILCS 320/3): Whether an owner can pull a building permit is a municipal question in Illinois; there is no state building-permit statute. At the state level, the Plumbing License Law requires that 'all plumbing shall be performed only by plumbers licensed under the provisions of this Act,' but exempts owner-occupants (and lessee-occupants) of single-family residences doing their own plumbing, provided the work meets Illinois State Plumbing Code minimum standards, is submitted for inspection by the Department or local unit, uses no unlicensed helpers ('shall not employ other than a plumber licensed pursuant to this Act to assist'), and the occupant has 'a current intention to live in such premises as his or her bona fide sole and exclusive residence for a period of not less than 6 months after the completion of the plumbing work.' Confirm how Chicago applies this before you apply.
From the Library
What else needs a permit in Chicago
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Not specified | Nonstructural interior remodel up to 500 sq ft with no occupancy or load-bearing change... |
| Deck Permit | Permit required | Not specified | Installation or alteration of a deck is $250 per dwelling unit served under the 2026 CP... |
| Electrical Permit | Permit required | Not specified | Tiered stand-alone schedule: repair or alteration of devices on existing circuits is $7... |
| EV Charger Permit | It depends | Not specified | Not published |
| Fence Permit | It depends | fence 5 ft or less in height on private residential property does not require a permit; fences over 5 ft require a permit | Flat $150 for a nonmasonry fence up to 6 ft high per Table 14A-12-1204.2; |
| HVAC Permit | Permit required | Not specified | No permit to repair or in-kind replace a furnace, boiler or AC in a residential buildin... |
| Patio Permit | It depends | at-grade noncombustible (concrete or brick) patios not more than 30 inches above adjacent grade, not over a basement or story below, and not in the public way are exempt; taller, over-basement, public-way, or roofed/covered patios require a permit | Not published |
| Pool Permit | It depends | pools with water depth greater than 48 inches on a lot with 1 to 3 residential units require a full building permit with licensed architect or engineer plans; shallower pools with volume under 5000 gallons may be exempt | Flat $400 to install a private in-ground or fixed pool or hot tub per Table 14A-12-1204... |
| Roof Replacement Permit | Permit required | Not specified | No permit to repair, recover or replace a pitched roof of at least 2:12 slope on a resi... |
| Shed Permit | It depends | single-story detached tool or storage shed under 150 sq ft and not more than 15 ft tall with no plumbing does not require a permit | A single-story shed 150 sq ft or less, up to 15 ft tall with no plumbing needs no permi... |
| Solar Permit | Permit required | Not specified | Flat $225 for a rooftop solar PV system under 13.44 kW per Table 14A-12-1204.2, plus a... |
| Water Heater Permit | It depends | Not specified | No permit to repair or in-kind replace a water heater in a residential building up to 4... |
Official sources
- https://www.chicago.gov/city/en/depts/bldgs/provdrs/permits/svcs/express-permits.html
- https://www.chicago.gov/city/en/sites/guide-to-building-permits/home/instructions/EPP.html
- https://www.grantcountywa.gov/DocumentCenter/View/5840/Exempt-R1052
- https://www.oregon.gov/bcd/codes-stand/Documents/2021orsc-ch1.pdf
Verified by a person against the sources above on 2026-06-17, not confirmed with Chicago Department of Buildings. Rules change; confirm before you build. How we verify.
Last checked: 2026-06-17Report an error on this page
Compare Plumbing Permit requirements across Illinois localities