Washington / Tacoma

Patio Permit in Tacoma, Washington

By Mario Bailey Last checked 2026-07-06 · 1 official source

Verified against official sources From an official source

It depends

Quick answer

At-grade concrete flatwork such as sidewalks and driveways is exempt from a building permit in Tacoma, though separate site-development permits can apply. A roofed patio cover or other structure above the patio requires a building permit from Planning and Development Services.

Typical threshold: at-grade flatwork such as sidewalks and driveways is exempt from a building permit, though separate site-development permits can apply; covered patios require a building permit.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Tacoma, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

For roofed patio covers or other structures above the patio; site-development permits can apply to flatwork

What your patio permit must meet in Washington

Washington's 2021 Residential Code (WAC 51-51, effective statewide March 15, 2024) carries no mandatory statewide construction standard for patio covers: the model code's patio-cover appendix applies only where a city or county specifically adopts it, so patio-cover build requirements are set locally.

  • Appendices to the Washington State Residential Code, including the model code's patio-cover appendix, are not part of the statewide default: an appendix applies only if a local jurisdiction's adopting ordinance specifically references it and the state building code council has approved that adoption (WAC 51-51-0102).
  • Where a patio cover adjoins a habitable room and is used to satisfy that room's natural-light requirement, state code requires an openable area between the room and the patio cover of not less than one-tenth of the interior room's floor area, with a 20 square foot minimum (WAC 51-51-0303, R303).

Based on 2021 Washington State Residential Code (WAC 51-51), based on the 2021 IRC. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What patio permit costs in Tacoma

Patio covers bill as an addition at 2.81 percent of ICC building valuation, per the PDS Fee Schedule effective 1/1/2025.

Official fee schedule

How Tacoma compares in Washington

JurisdictionPermit needed?Threshold
BellevueNo permit neededNot specified
Clark CountyIt dependsPatio and concrete slabs on the ground grade are exempt from permit but may not be built on easements; adding a patio cover or enclosing a covered patio requires a building permit under the ADS permit type.
King CountyIt dependsat-grade patios and uncovered decks 30 inches or less above ground are exempt; covered patios and taller structures require a building permit
Pierce CountyIt dependsAt-grade patios, treated the same as exempt sidewalks and driveways, are exempt if not more than 30 inches above grade at any point and not over any story or basement below; an attached, roofed patio cover requires a building permit regardless of size.
SeattleNo permit neededNot specified
Snohomish CountyIt dependsopen at-grade patios are treated as exempt sidewalks and driveways under SCC 30.50.103(1)(e) with no size limit; freestanding patio covers (roofed, not attached to another structure) are exempt only if 200 sq ft or less inside the UGA or 400 sq ft or less outside the UGA; larger or attached patio covers require a permit
Tacomathis pageIt dependsat-grade flatwork such as sidewalks and driveways is exempt from a building permit, though separate site-development permits can apply; covered patios require a building permit

How to apply in Tacoma

Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.

What most patio permit applications include:

  • Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
  • A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
  • Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
  • For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
  • By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).

General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. City of Tacoma Planning and Development Services sets the exact checklist for Tacoma.

Where to apply in Tacoma:

City of Tacoma Planning and Development Services

  • 747 Market Street Third Floor, Tacoma, WA 98402
  • Phone: (253) 591-5030
  • Email: Permits@tacoma.gov

Inspections and closing out your permit

A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.

  1. A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
  2. A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
  3. A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
  4. An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
  5. Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Tacoma permit portal or by phone at (253) 591-5030.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Tacoma

In 2024, Tacoma authorized permits for 402 new residential housing units (137 single-family, 265 in multi-family buildings), valued at $99M, down from692 the year before. That works out to about 1.8 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 219,945.

About Tacoma

Tacoma has about 96,151 housing units. The median home is valued at $454,600, against a median household income of $83,857. About 56% of homes are owner-occupied, and the typical home was built around 1967.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a patio permit in Tacoma?
At-grade concrete flatwork such as sidewalks and driveways is exempt from a building permit in Tacoma, though separate site-development permits can apply. A roofed patio cover or other structure above the patio requires a building permit from Planning and Development Services. At-grade flatwork such as sidewalks and driveways is exempt from a building permit, though separate site-development permits can apply; covered patios require a building permit. Always confirm with the office before starting.
How much does a patio permit cost in Tacoma?
Patio covers bill as an addition at 2.81 percent of ICC building valuation, per the PDS Fee Schedule effective 1/1/2025. See the official fee schedule for current amounts.
Where do you apply for a patio permit in Tacoma?
You can apply through the Tacoma permit portal or contact the City of Tacoma Planning and Development Services directly. The links are listed on this page.

From the Library

What else needs a permit in Tacoma

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsfreestanding decks not exceeding 200 sq ft and not more than 30 inches above grade are exempt; decks over 200 sq ft, over 30 inches above grade, or attached to the dwelling require a permitDecks bill as an addition at 2.81 percent of ICC building valuation, with uncovered woo...
Electrical PermitPermit requiredNot specifiedNo Planning and Development Services fee;
Fence PermitIt dependsfences 7 feet or under in height do not require a building permit; fences over 7 feet require a permitOnly fences over 7 feet or masonry walls over 4 feet need a building permit, priced fro...
HVAC PermitPermit requiredNot specifiedStandalone HVAC and mechanical permits run 2.81 percent of construction value with a $1...
Plumbing PermitPermit requiredNot specifiedStandalone plumbing permits run 2.81 percent of construction value with a $180 minimum...
Pool PermitIt dependsprefabricated above-ground pools less than 24 inches deep and not greater than 5000 gallons are exempt; all other pools require a building permitPools 24 inches deep or more need a permit priced from $55 for the first $500 of valuat...
Roof Replacement PermitIt dependsremoving and replacing existing roof coverings with the same type does not require a permit; adding a layer or changing roofing materials requires a permit and pre-roof inspectionReroofs outside the tear-off exemption bill as a remodel at 2.81 percent of ICC buildin...
Shed PermitIt dependsone-story detached accessory structures with a floor area of 200 square feet or less do not require a building permit; structures over 200 square feet require a permitSheds 200 square feet or larger need a permit priced from $55 for the first $500 of val...
Solar PermitPermit requiredNot specifiedSolar panel installation bills as a remodel at 2.81 percent of ICC building valuation w...

Patio Permit in other Washington localities

Official sources

Verified by a person against the sources above on 2026-07-06, not confirmed with City of Tacoma Planning and Development Services. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-06Report an error on this page

Compare Patio Permit requirements across Washington localities