Louisiana / New Orleans

Patio Permit in New Orleans, Louisiana

It depends

Sometimes, depending on the project

Before adding a roof or cover over a patio, and before any paving that does not comply with the Comprehensive Zoning Ordinance.

Confirmed on official page Verified City of New Orleans Department of Safety and Permits

By Mario Bailey, verified against official sources

Quick answer

A flat paved patio in New Orleans is exempt from the building permit requirement, but only when the paving complies with the Comprehensive Zoning Ordinance, which limits paving and impervious surface in required yards. Adding a cover changes the answer: the city states that roofs over otherwise unenclosed porches, and their framing, are not exempt from permitting. So an at-grade slab or paver patio generally needs no building permit while a covered patio does. The city publishes no square footage figure for either case.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before adding a roof or cover over a patio, and before any paving that does not comply with the Comprehensive Zoning Ordinance.

What a patio permit costs in New Orleans

Line item
patio permitBy formulaWhere a permit is required, the building permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005 + $60), with a 50% surcharge on the permit fee for property in a local historic district. Guide to Building Permits, last updated 1/22/2026.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in New Orleans

Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.

What most patio permit applications include:

  • Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
  • A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
  • Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
  • For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
  • By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).

General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. City of New Orleans Department of Safety and Permits sets the exact checklist for New Orleans.

Where to apply in New Orleans:

City of New Orleans Department of Safety and Permits

  • 1340 Poydras Street, Suite 800, New Orleans, LA 70112
  • Phone: (504) 658-7200
  • Email: permitinfo@nola.gov

Inspections and closing out your permit

A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.

  1. A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
  2. A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
  3. A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
  4. An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
  5. Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the New Orleans permit portal or by phone at (504) 658-7200.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a patio permit in New Orleans?
A flat paved patio in New Orleans is exempt from the building permit requirement, but only when the paving complies with the Comprehensive Zoning Ordinance, which limits paving and impervious surface in required yards. Adding a cover changes the answer: the city states that roofs over otherwise unenclosed porches, and their framing, are not exempt from permitting. So an at-grade slab or paver patio generally needs no building permit while a covered patio does. The city publishes no square footage figure for either case. Always confirm with the City of New Orleans Department of Safety and Permits before starting.
How much does a patio permit cost in New Orleans?
Where a permit is required, the building permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005 + $60), with a 50% surcharge on the permit fee for property in a local historic district. Guide to Building Permits, last updated 1/22/2026. See the official fee schedule for current amounts.
Where do you apply for a patio permit in New Orleans?
You can apply through the New Orleans permit portal or contact the City of New Orleans Department of Safety and Permits directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in New Orleans?
Under Louisiana law (La. R.S. 37:2157(A)(2), (A)(13), (A)(15)(a), (B); La. R.S. 37:2160(B) and (C)): Yes. R.S. 37:2157(A)(13) exempts an owner who supervises or takes charge of construction, alteration or repair of his own personal residence from the contractor licensing law, but caps the exemption at one residence per year, with the year running from the date the certificate of occupancy issues; the cap lifts only where a change in the owner's legal marital status, or a change in employment forcing a move more than 50 miles from his residence, requires a second home. A separate exemption at R.S. 37:2157(A)(2) covers an owner who takes charge of work on his own property for his own use, where the result will not be for sale or rent and the owner controls access. A residential property owner who physically performs home improvement work on his own residence is also exempt from home improvement licensure under R.S. 37:2157(A)(15)(a). The exemption is not self-executing at the permit counter: R.S. 37:2157(A)(13) requires an affidavit of exemption on a board form in order to obtain the building permit, and R.S. 37:2160(C) obliges the local permit official to collect that affidavit before the permit issues. R.S. 37:2157(B) adds that none of these exemptions waives local or state health and life safety code requirements, so an exempt homeowner still owes the permit and the inspections. Confirm how New Orleans applies this before you apply.

From the Library

What else needs a permit in New Orleans

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area, with the exemption also requiring the deck be uncovered, no more than thirty inches high from grade at any point, detached from the dwelling unit, and not serving an exit doorBuilding permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005...
Electrical PermitPermit requiredNot specified$40 application fee plus $3 per new circuit plus $0.30 per service amperage.
Fence PermitIt dependsheight of the fence, with the exemption also requiring compliance with the Comprehensive Zoning OrdinanceBuilding permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005...
HVAC PermitPermit requiredNot specifiedVaries based on components of work.
Plumbing PermitPermit requiredNot specifiedNot part of the building permit fee.
Pool PermitPermit requiredNot specified$60 plus $5 per $1,000 of work to be performed.
Roof Replacement PermitIt dependsshare of the roof replaced, for single and two-family homesBase Fee: $60.
Shed PermitPermit requiredNot specified$60 plus $5 per $1,000 of work to be performed.
Solar PermitPermit requiredNot specifiedPermits for rooftop solar are classified as Electrical Permits with associated costs of...

Patio Permit in other Louisiana localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not New Orleans documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of New Orleans Department of Safety and Permits. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Patio Permit requirements across Louisiana localities

It depends